Construction glossary.
236 terms that PMs, project accountants and CFOs use every day. Plain definitions, worked examples, and the mistakes that cost real money.
Popular guides
- 20 termsGetting paid: pay apps, retainage, lien waivers and noticesRead the guide →
- 12 termsFrom RFI to change order: ASI, field order, CCD and CORead the guide →
- 14 termsCloseout to occupancy: punch, Cx, as-builts, TCO and CORead the guide →
- 23 termsConstruction cost reporting: accruals, earned revenue, EAC and WIPRead the guide →
- 8 termsBid, performance and payment bonds, explainedRead the guide →
- 10 termsProject delivery methods: design-build, CMAR, GMP and moreRead the guide →
Browse by topic
236 terms
A
Acceleration
Speeding up work to finish earlier than the current schedule allows, either because the owner directs it or because the owner denies a time extension the contractor was owed.
AccountingAccounts payable
Money your company owes to subcontractors, suppliers and vendors for work, materials and services already billed.
AccountingAccounts receivable
Money owners and clients owe your company for work you've billed, including retainage held until completion.
AccountingAccrual
Recording a cost (or revenue) in the period it was incurred or earned, even if the invoice hasn't arrived or the cash hasn't moved.
AccountingACH (NACHA) file
The fixed-format file your bank accepts to send electronic payments through the ACH network, such as vendor payments and payroll direct deposit.
Project managementActivity Code
A user-defined classification, such as area, trade, phase or responsibility, assigned to schedule activities so they can be filtered, grouped and reported.
ContractsAdditional Insured
A party, like the GC or owner, added to someone else's liability policy by endorsement so that policy defends and covers them for claims arising from that party's work.
AccountingAging report
A report that groups open receivables or payables by how long they've been outstanding, such as current, 1–30, 31–60, 61–90 and over 90 days.
TechnologyAI Agent
Software that uses an AI model to carry out multi-step tasks, like reading documents, checking data and drafting actions, toward a goal.
BillingAIA G702
The AIA Application and Certificate for Payment: the one-page summary of a pay application, signed by the contractor and certified by the architect.
BillingAIA G703
The AIA Continuation Sheet: the line-by-line detail of a pay application, showing progress and retainage for each schedule of values item.
ContractsAllowance
A placeholder amount in the contract for a specific item not fully defined at bid time, reconciled against actual cost later.
TechnologyAPI (Application Programming Interface)
A defined way for software systems to request and exchange data with each other without manual export and import.
Project managementArchitect's Supplemental Instructions (ASI)
AIA G710 Architect's Supplemental Instructions (ASI): the architect's written instruction that clarifies the contract documents or orders a minor change with no change in contract sum or time.
FieldAs-Built Drawings
Drawings marked up to show how the project was actually built, including every field change from the original design.
AccountingASC 606
The US GAAP standard for revenue from contracts with customers, which governs how contractors recognize revenue over time on construction contracts.
Project managementAssignments View
A schedule view with one row per resource assignment across all activities, showing units, costs, rates, dates and curves, for reviewing and editing resource loading in bulk.
TechnologyAudit Trail
A permanent, time-stamped record of who created, changed or approved each piece of data, and what it was before.
AnalyticsAverage Deal Size
Total value of won pursuits divided by the number won: the typical size of the work you actually land.
B
Back charge
A charge a contractor issues to a subcontractor or supplier for costs it incurred because of their defective work, damage, cleanup or failure to perform.
AnalyticsBacklog
Contracted revenue not yet earned: the work a contractor has signed but not yet performed.
AccountingBackup withholding
Withholding 24% of a reportable payment to a vendor who hasn't provided a valid taxpayer identification number, and remitting it to the IRS.
Project managementBall in Court
Who has to act next on an RFI, submittal, punch item or other open record, so the item never waits without an owner.
AccountingBank reconciliation
Proving that the cash balance in your books agrees with the bank statement, after accounting for deposits in transit and outstanding checks.
ContractsBid Bond
A surety bond submitted with a bid that guarantees the bidder will sign the contract and provide performance and payment bonds if awarded.
Project managementBid Leveling
Comparing subcontractor bids line by line, adjusting for scope gaps and exclusions, so they can be judged on equal terms.
AccountingBonding capacity
The maximum single-job and total work-on-hand a surety will bond for a contractor, based mainly on its financial strength and track record.
TechnologyBuilding Information Modeling (BIM)
A process of creating and managing a shared 3D model of a building that carries data about its parts, not just geometry.
FieldBuilding Permit
Written permission from the local building authority to construct, alter or demolish a building, issued after plan review and subject to inspections and conditions.
Project managementBulletin
A package of revised drawings and specifications the design team issues during construction, often with a request to price the changes.
Project managementBuyout
The process after award of turning the estimate into signed subcontracts and purchase orders, locking in actual costs and scope for each trade.
AccountingBuyout Savings
The difference between a trade's budgeted cost and the actual amount committed at buyout, positive when the subcontract or PO comes in under budget.
C
Cash-basis accounting
Recording revenue when cash is received and expenses when cash is paid, rather than when they are earned or incurred.
ContractsCertificate of Insurance (COI)
A one-page summary, usually on an ACORD 25 form, that shows a contractor's insurance coverages, limits and policy dates.
Project managementCertificate of Occupancy (CO)
The document a local building authority issues stating a building complies with codes and approved plans and may legally be occupied.
AccountingCertified payroll
A weekly payroll report, signed under penalty of law, that proves workers on a prevailing wage job were paid the required wages and fringes.
Project managementChange Event
Any occurrence on a project that might change cost, scope or schedule, logged before anyone knows whether it will become a change order.
TechnologyChange Feed
A running, newest-first list of what happened to a shared record, such as a schedule's saves, calculations, baselines, imports and discussion, with who did it and what changed.
Project managementChange Order (CO)
A signed agreement between owner and contractor that changes the contract scope, price, time, or a combination of them.
AccountingChart of accounts
The numbered list of every account a company posts to, grouped into assets, liabilities, equity, revenue and expenses.
Project managementCloseout
The final phase of a project: work finished, documents delivered, final payments and lien waivers exchanged, and the job closed financially.
Project managementCommissioning (Cx)
A quality process that verifies building systems are designed, installed, tested and operating to meet the owner's requirements.
AccountingCommitment
A contractual obligation to spend money, such as a subcontract or purchase order, tracked against the budget before any invoice arrives.
AccountingCompleted-Contract Method
An accounting method that recognizes all revenue and profit on a contract only when the job is complete, holding costs and billings on the balance sheet until then.
BillingConditional Lien Waiver
A lien waiver that only takes effect once the stated payment is actually received and clears.
AccountingConsolidation
Combining the financial statements of several entities into one set for the group, eliminating intercompany balances and transactions.
ContractsConstruction Change Directive (CCD)
A written order from the owner directing a change in the work before owner and contractor agree on price or time.
ContractsConstruction Manager at Risk (CMAR)
A delivery method where the CM gives preconstruction advice, then commits to building the project for a guaranteed maximum price.
ContractsConstructive Change
A change to the work the owner causes through words or conduct without issuing a formal change order, which can still entitle the contractor to more time or money.
ContractsContingency
Money set aside in a budget or contract to cover unknown costs and risks that are expected but can't be pinned down yet.
AccountingContract asset
Under ASC 606, revenue you have earned on a contract but not yet billed: in construction, the underbilling, or costs and estimated earnings in excess of billings.
AccountingContract liability
Under ASC 606, amounts billed or received before the revenue is earned: in construction, the overbilling, or billings in excess of costs and estimated earnings.
AccountingControl account
A general ledger account whose balance must equal the total of a subledger, such as accounts payable or accounts receivable.
AccountingCost code
A code that classifies a cost by type of work, and usually by cost type, so budgets and actuals can be compared at a useful level of detail.
AnalyticsCost report
A job report showing, by cost code, the original and revised budget, committed cost, actual cost, cost-to-complete, forecast and variance.
ContractsCost-Plus Contract
A contract where the owner reimburses the contractor's actual costs plus a fee, either a percentage or a fixed amount.
AnalyticsCost-to-complete
The estimated remaining cost to finish a job, based on remaining commitments, remaining labor and known risks, not just budget minus actuals.
AccountingCost-to-cost method
Measuring a contract's progress as cost incurred to date divided by estimated total cost, then recognizing that percentage of the contract price as revenue.
Project managementCritical Path
The driving sequence of activities that determines a selected completion milestone under the schedule's logic, calendars, and settings.
AccountingCSI MasterFormat
The Construction Specifications Institute's standard numbering system that organizes specifications into divisions like 03 Concrete and 26 Electrical.
D
Daily Log
The superintendent's dated record of each day on site: weather, manpower, work performed, deliveries, inspections, visitors, delays and issues.
Project managementData Date
The status cutoff separating recorded progress from the remaining work forecast in a schedule update.
ContractsDavis-Bacon Act
US federal law requiring locally prevailing wages and fringe benefits on federally funded or assisted construction contracts over $2,000.
Project managementDCMA 14-Point Assessment
Fourteen schedule-quality screening metrics (logic, leads, lags, constraints, float, durations, dates, resources, missed tasks, CPT, CPLI and BEI) from DCMA guidance.
ContractsDelay Claim
A documented request for contractual relief associated with delay, supported by records, schedule analysis, and the applicable contract.
AccountingDepreciation
Spreading the cost of a long-lived asset, such as construction equipment, over the years it is used, as an expense each period.
ContractsDesign-Bid-Build
The traditional delivery method: the owner hires a designer to complete the drawings, bids them to contractors, then signs a separate construction contract.
ContractsDesign-Build
A delivery method where one entity holds a single contract with the owner for both design and construction.
ContractsDiffering Site Conditions
Physical conditions at the site that differ materially from the contract documents or from what's normally encountered, entitling the contractor to an adjustment.
TechnologyDigital Twin
A digital model of a physical asset or project that stays connected to real-world data, so it reflects current conditions.
AccountingDouble-entry accounting
The bookkeeping system in which every transaction is recorded as equal debits and credits, so the books always balance.
Project managementDuration Type
A P6 activity setting that decides which of duration, units and units per time is recalculated when one of the others is edited.
E
Earned revenue
The portion of contract value a contractor has earned to date, typically percent complete times total contract value.
Project managementEarned Value Technique
The rule that decides how much of an activity's budget counts as earned at a given point of progress, such as percent complete, 0/100 or 50/50.
AccountingEquipment costing
Charging owned or rented equipment to jobs at rates that recover its full cost of ownership and operation.
TechnologyERP (Enterprise Resource Planning)
Software that runs a company's core business processes, like accounting, payroll, purchasing and job cost, on one database.
ContractsEscalation Clause
A contract provision that adjusts the price when the cost of specified materials or labor rises (or falls) beyond a set threshold after bid.
AnalyticsEstimate at completion
The forecast total cost of a job when finished: cost to date plus estimated cost to complete.
Project managementExpected Finish
A date the scheduler enters for when an activity is expected to finish; with the project's Use expected finish dates option on, the calculation fits the activity's remaining work to end on it.
F
FICA
The Federal Insurance Contributions Act taxes, Social Security and Medicare, paid by both employee and employer on wages.
FieldField Mode (Offline Sync)
A way to keep a schedule on a phone, record progress on site without signal, and sync the updates as one new version when the connection returns.
FieldField Order
A written order issued in the field directing a contractor to do specific work right away, usually minor, with price and time settled afterward if needed.
ContractsFinal Completion
The point when all contract work, punch list and closeout requirements are done and final payment becomes due.
Project managementFinancial Period
A named date range, usually a month, that a schedule's actual units and costs are stored into, so cost performance can be reported per period rather than only to date.
AccountingFiscal period
A defined slice of the fiscal year, usually a month, that entries post into and that can be opened, soft-closed or closed.
Project managementFloat
Calculated timing flexibility: total float relates to the schedule's late-date limit; free float relates to a successor's early start.
ContractsFlow-Down Clause
A subcontract provision that binds the subcontractor to the GC's obligations under the prime contract, as they apply to the sub's work.
ContractsForce Majeure
A contract clause that excuses delay (and sometimes performance) caused by events beyond either party's control, like severe weather, war or epidemics.
AccountingForm 1099-NEC
The IRS information return for reporting payments to non-employees, such as subcontractors, for services in the course of your business.
AccountingForm W-9
The IRS form a vendor gives you to certify its name, entity type and taxpayer identification number, used for 1099 reporting.
AccountingFUTA and SUTA
Federal and state unemployment taxes paid by employers on a limited amount of each employee's wages.
G
General conditions
In construction, either the contract document that sets the parties' general rights and duties (such as AIA A201), or the job-specific costs of running the site that aren't tied to one trade: staff, field office, temporary facilities and cleanup.
ContractsGeneral Contractor
The company that holds the prime construction contract with the owner and is responsible for building the whole project, usually by managing subcontractors, suppliers and its own crews.
AccountingGeneral ledger
The complete record of every financial transaction a company posts, organized by account, from which the trial balance and financial statements are built.
AccountingGross profit
Contract revenue minus direct job costs; for a contractor, the margin a job contributes before company overhead.
AccountingGross-to-net
The payroll calculation that starts with gross earnings and subtracts pre-tax deductions, taxes and post-tax deductions to reach net pay.
Project managementGroup & Sort
A schedule view setting that bands activities by WBS, activity code or any field, up to several levels, with totals per band and a sort order within each band.
ContractsGuaranteed Maximum Price (GMP)
A cost-plus contract with a ceiling: the owner pays actual cost plus fee up to a cap, and the contractor absorbs overruns.
H
I
Indemnity Agreement
A promise by one party to cover another's losses. In surety, the general indemnity agreement makes the contractor and its owners repay the surety for any bond loss.
FieldInspection Checklist
A list of items checked before work is covered or accepted, answered pass, fail or not applicable, so quality checks are the same every time.
ContractsIntegrated Project Delivery (IPD)
A delivery method where owner, designer and builder sign one multi-party agreement and share project risk and reward.
AccountingIntercompany transaction
A transaction between two legal entities in the same group, such as an equipment company billing an operating company, recorded in both entities' books with due-to and due-from balances.
AccountingIRC §460
The Internal Revenue Code section that sets tax accounting methods for long-term contracts, requiring percentage of completion except for qualifying small contractors and home or residential construction.
J
Job costing
Tracking every dollar of labor, material, equipment and subcontract cost against the specific job and cost code it belongs to.
BillingJoint Check
A check made payable to two parties, typically a subcontractor and its supplier, so the supplier gets paid and lien risk is reduced.
AccountingJoint venture accounting
How a contractor reports its share of a construction joint venture, typically by proportionate consolidation or the equity method.
AccountingJournal entry
A dated, balanced record of a transaction, listing the accounts debited and credited, which posts to the general ledger.
L
Labor burden
The cost of employing a worker beyond base wage: payroll taxes, workers' comp, insurance and benefits, as a percent or per-hour add-on.
Project managementLayout (Schedule View)
A saved arrangement of a schedule view: its columns, filters, grouping, sort, Gantt settings and panes, reusable by one person, a project team or the whole company.
AnalyticsLead Conversion Rate
The share of incoming inquiries that become real pursuits: inquiries converted to an opportunity divided by inquiries received.
Project managementLessons Learned
What completed work shows about how long similar work really takes, recorded so the next plan starts from evidence rather than habit.
BillingLien Waiver
A document in which a contractor, sub or supplier gives up its right to file a mechanics lien for a stated amount or period, usually in exchange for payment.
ContractsLimited Notice to Proceed (LNTP)
An owner's written authorization for a contractor to start only named early work, often up to a dollar cap, before the full notice to proceed.
Project managementLine of Balance
A location-based schedule chart that plots locations against time, with one sloped line per trade, so you can see each crew moving through the building and where two trades collide.
ContractsLiquidated Damages (LDs)
A fixed amount per day, set in the contract, that the contractor owes the owner for finishing late.
Project managementLongest Path
The chain of driving relationships from the data date to the project finish; it can differ from the set of activities with zero total float.
Project managementLook-Ahead Schedule
A short-range schedule, usually two to six weeks, that breaks the master schedule into the specific tasks crews will perform next.
AccountingLoss provision
On a contract expected to lose money, the immediate recognition of the full anticipated loss, not just the share of it incurred so far.
ContractsLump Sum Contract
A contract where the contractor agrees to deliver a defined scope for one fixed price, keeping savings and absorbing overruns.
M
MACRS
The Modified Accelerated Cost Recovery System, the US tax depreciation method that assigns assets to recovery periods and depreciates them on IRS percentage tables.
ContractsMaintenance Bond
A surety bond that guarantees the contractor will correct defects in materials and workmanship that appear during a set period after the work is completed.
AnalyticsMargin fade
A decline in a job's projected gross profit margin over time, from bid to forecast to final.
BillingMechanics Lien
A legal claim against a property filed by an unpaid contractor, subcontractor or supplier who improved it.
Project managementMeeting Minutes
The written record of a project meeting: who attended, what was decided on each topic, who owns each open item and by when.
BillingMobilization
The work and cost of getting people, equipment, temporary facilities and permits in place on site so construction can start, often billed as its own line on the schedule of values.
TechnologyModel Context Protocol (MCP)
An open protocol that lets an AI application discover and call tools and read data from other systems through a standard connector.
Project managementMonte Carlo P80
The finish date that 80% of simulated schedule outcomes meet or beat in a Monte Carlo schedule risk analysis.
AccountingMonth-end close
The process of finishing a period's accounting: reconciling, accruing, reviewing and locking the month so its numbers stop changing.
N
No-Damages-for-Delay Clause
A contract clause that limits a contractor's remedy for owner-caused delay to a time extension, with no extra money.
ContractsNotice of Commencement (NOC)
A recorded public notice that identifies a private construction project, its owner, contractor and lender, and anchors lien deadlines and priority in states that use it.
ContractsNotice of Completion
A recorded notice that a private project is complete, which in many states shortens the deadline for contractors, subs and suppliers to record mechanics liens.
ContractsNotice of Nonpayment
A written notice an unpaid subcontractor or supplier sends to preserve a payment bond claim or warn the owner and GC that it hasn't been paid; deadlines are set by state law.
ContractsNotice to Proceed (NTP)
NTP stands for notice to proceed: the owner's written authorization for the contractor to start work. The NTP date usually starts contract time, the clock that runs to substantial completion.
O
O&M Manuals
Operation and maintenance manuals: the closeout documents that tell the owner how to run, maintain and repair the building's equipment and systems.
TechnologyOCR (Optical Character Recognition)
Technology that reads text from scanned documents, PDFs and photos and turns it into data software can use.
Project managementOpen-Ended Activity
An activity missing a predecessor or a successor, so the schedule logic leaves its start or finish free.
Project managementOut-of-Sequence Progress
Recorded work that started or progressed before the schedule relationships would normally allow it.
BillingOver billing
When billings to date exceed revenue earned to date on a job; recorded as a liability called billings in excess of costs and estimated earnings.
AccountingOverhead
Company-level costs not tied to any one job, such as office rent, executives, accounting and IT, paid for out of jobs' gross profit.
AccountingOverhead allocation
Spreading indirect costs, such as shop, yard or equipment overhead, to jobs on a base like labor hours, labor cost or direct cost.
P
Pacing
A deliberate slowing of non-critical work in response to a delay on another path, so it isn't counted as concurrent delay.
BillingPay Application (Pay App)
A contractor's periodic, itemized request for payment based on work completed and materials stored against the schedule of values.
ContractsPay-When-Paid
A subcontract clause that sets the timing of sub payment to follow the GC's receipt of payment from the owner.
ContractsPayment Bond
A surety bond that guarantees the contractor will pay its subcontractors, laborers and suppliers on the project.
AccountingPayment run
A batch process that selects approved bills due for payment, applies holds, gets release approval, and produces checks or electronic payments.
AnalyticsPercent complete (cost-to-cost)
A job's progress measured as cost incurred to date divided by total estimated cost; the most common basis for recognizing contract revenue.
Project managementPercent Plan Complete (PPC)
The share of a week's commitments that were finished as promised, used in the Last Planner System to measure how reliable short-term planning is.
ContractsPerformance Bond
A surety bond that guarantees the contractor will complete the work according to the contract, or the surety will step in.
Project managementPerformance Factor
A multiplier applied to the budget of remaining work to estimate what it will actually cost: 1, a custom value, 1/CPI or 1/(CPI × SPI).
AnalyticsPipeline Value
The total estimated value of every open pursuit: work you're chasing that hasn't been won or lost yet.
AccountingPositive pay
A fraud control in which you send your bank a list of issued checks, and the bank pays only checks that match it.
Project managementPotential Change Order (PCO)
A priced proposal for a change, submitted to the owner for approval before it becomes an executed change order.
Project managementPreconstruction
The planning phase before construction starts, when the builder estimates, prices, sequences and buys out the work so the project can be built for the budget and schedule the owner expects.
BillingPreliminary Notice
A notice a sub or supplier sends early in a job to preserve its lien rights, telling the owner and GC it is furnishing labor or materials.
Project managementPrequalification
Screening contractors or subcontractors on safety, finances, experience and capacity before they're allowed to bid.
AccountingPrevailing wage
The minimum hourly wage and fringe benefits that must be paid to each labor classification on covered public construction projects.
Project managementProgram (Schedule)
A group of related projects whose schedules are linked and managed together, so a delay on one project can be traced into the others.
Project managementProgress Line
A line drawn down a Gantt chart through the data date that bends out to each activity's progress point, showing at a glance which work is ahead of plan and which is behind.
Project managementProgress Override
A progress setting that releases the logic into an out-of-sequence activity, so its remaining work continues from the data date.
Project managementProgress Spotlight
A P6 view feature that highlights the activities that should have progressed between the current data date and a new one, as a guide for statusing.
Project managementProspective Time Impact Analysis
A forward-looking time impact analysis, done near the time of a delay event, that inserts an agreed fragnet into the current schedule update to estimate its effect on completion.
FieldPunch List
The list of incomplete or defective items that must be fixed before the owner accepts the work and final payment is released.
AccountingPurchase order
A document issued to a supplier that authorizes a purchase of materials, equipment or services at agreed quantities and prices.
AccountingPurchase Requisition
An internal request to buy something, with what is needed, why, the cost code and an estimate, approved before a purchase order is issued.
Q
R
Regular rate of pay
Under the FLSA, the hourly rate used to calculate overtime, which includes most compensation for the workweek, not just the base rate.
Project managementRequest for Information (RFI)
A formal written question from the contractor to the design team asking them to clarify, fill a gap in, or resolve a conflict in the contract documents.
Project managementResource Usage Profile
A time-phased chart of a resource's planned and remaining units or cost per day, week or month, often with cumulative curves and the resource's limit, used to spot over-allocation.
BillingRetainage
A percentage of each progress payment that the owner (or GC) holds back until the work is substantially or finally complete.
AccountingRetainage payable
Retainage you have withheld from subcontractors' pay apps, owed to them once release conditions are met.
AccountingRetainage receivable
Retainage the owner has withheld from your pay applications: billed and earned, but not collectible until release.
BillingRetainage Release
Billing and paying out the retainage held on a contract, usually at substantial or final completion, once the contractual conditions are met.
AccountingRetained earnings
The cumulative profits a company has kept rather than distributed, increased each year by the closing entry that moves net income into equity.
Project managementRetained Logic
A progress setting where an out-of-sequence activity's remaining work still waits for its unfinished predecessors.
AccountingRevenue Recognition (ASC 606)
The accounting rules for when and how much revenue to record. Under ASC 606, most construction contracts recognize revenue over time as work progresses.
AccountingReversing entry
A journal entry that exactly mirrors an earlier one, swapping debits and credits, to cancel it or to undo an accrual in the next period.
ContractsRFP vs. RFQ
An RFQ asks contractors to submit qualifications so the owner can shortlist; an RFP asks for a proposal with approach and often price. In trade buying, RFQ can also mean request for quotation.
Project managementRisk Register
A list of identified project risk events, each with an owner, probability, impact and mitigation, that can feed a quantitative schedule risk analysis.
TechnologyRow-Level Security
Filtering data row by row so each person sees only the records they're allowed to see, in every report and query.
S
Sales Cycle
How long a pursuit takes from first entry to a win, averaged over won pursuits.
Project managementSchedule Baseline
A preserved reference plan used to compare later progress and forecast dates against the agreed planning basis.
Project managementSchedule Calendar
The working-time rules a scheduling calculation uses to place activity durations on actual dates.
BillingSchedule of Values (SOV)
The breakdown of the contract sum into line items with assigned values, used as the basis for progress billing.
ContractsScope of Work
The written description of the work a contractor or subcontractor must perform, including what is included, what is excluded and the standards it must meet.
AccountingSegregation of duties
Splitting key steps of a transaction, such as entering, approving, paying and reconciling, between different people so no one person can both commit and conceal an error or fraud.
TechnologySemantic Layer (Metric Catalog)
A governed list of business metrics, each defined once with its formula, unit and allowed groupings, that every dashboard and query reads from.
ContractsShared Savings (GMP Savings Split)
A cost-plus-fee with GMP provision that splits any amount by which final cost comes in under the guaranteed maximum price between owner and contractor.
TechnologySingle Source of Truth (Data Core)
One authoritative record for each piece of data, so every team and report reads the same number instead of copies.
Project managementSPI(t)
Earned Schedule's time-based Schedule Performance Index: earned schedule divided by actual time. Below 1.00 means the work is behind the baseline.
ContractsStop Payment Notice
A claim served on an owner or construction lender that requires them to withhold enough undisbursed project funds to cover an unpaid sub or supplier.
Project managementStore Period Performance
A P6 action that records a schedule's actual units and costs, and earned and planned value, into a financial period, so per-period figures survive later updates.
BillingStored Materials
Materials delivered and stored on site or in an approved off-site location but not yet installed, which may be billed if the contract allows.
ContractsSubcontract
A contract between the prime contractor and a trade contractor to perform a defined part of the prime contract's scope.
ContractsSubcontractor Default Insurance (SDI)
A policy bought by a general contractor that reimburses it for the costs when an enrolled subcontractor fails to perform.
AccountingSubledger
A detailed ledger, such as AP, AR, retainage or job cost, whose total ties to a control account in the general ledger.
Project managementSubmittal
Shop drawings, product data, samples or other documents a contractor sends to the design team for review before buying or installing materials.
Project managementSubmittal Register
The master list of every submittal a project requires, with spec section, responsible sub, required dates and review status.
ContractsSubstantial Completion
The point when the work is complete enough for the owner to occupy or use it for its intended purpose.
ContractsSurety
The company that issues construction bonds, guaranteeing to the owner that the contractor will perform and pay, and expecting the contractor to repay any loss.
Project managementSuspend and Resume
Dates that record a pause in started work: the suspend date when it stopped and the resume date when its remaining work restarts.
T
Takeoff
The process of measuring and counting quantities of materials and work from drawings to build an estimate.
Project managementTakt Time
The fixed time each trade gets in each zone in takt planning, so trades move through the building in a steady rhythm, like the carriages of a train.
Project managementTemporary Certificate of Occupancy (TCO)
A time-limited certificate from the building department that allows all or part of a building to be occupied before every item is finished, as long as occupied areas are safe.
Project managementThree-Point Estimate
An activity duration given as optimistic, most likely and pessimistic values, used to describe uncertainty for schedule risk analysis.
AccountingThree-way match
An AP control that checks an invoice against its purchase order and the receiving record before payment is approved.
ContractsTime and Materials Contract
A contract where the owner pays for labor at agreed hourly rates plus materials at cost with a markup, usually capped by a not-to-exceed amount.
FieldTime and Materials Ticket (T&M Ticket)
A daily field record of labor hours, materials and equipment used on extra work, signed by the other party as backup for payment.
Project managementTime Impact Analysis
A schedule modeling method that inserts an event into a selected schedule and compares the calculated milestone dates.
Project managementTrace Logic
A small network diagram of one activity's predecessors and successors, a chosen number of levels deep, used to follow logic through a schedule.
Project managementTransmittal
A cover record that lists exactly which documents, drawings or samples were sent, to whom, when, how and for what purpose.
AccountingTrial balance
A list of every account's debit or credit balance at a date; total debits equal total credits.
U
Unconditional Lien Waiver
A lien waiver that takes effect immediately on signing, confirming payment has already been received for the stated amount.
BillingUnder billing
When revenue earned to date exceeds billings to date; recorded as an asset called costs and estimated earnings in excess of billings.
AccountingUninstalled materials
Materials delivered to or stored for a job but not yet installed; under ASC 606 they can be excluded from cost-to-cost progress and recognized at zero margin.
AccountingUnion fringe
Per-hour contributions a union contractor pays into health, pension, annuity and training funds, as set by the collective bargaining agreement.
ContractsUnit Price Contract
A contract where the owner pays a fixed price per unit of work (per cubic yard, linear foot, ton) times the actual quantity installed.
Project managementUnits Percent Complete
Progress measured as actual resource units over the units expected at completion, across an activity's labor and nonlabor assignments.
Project managementUpdate Period (Schedule Update)
The interval between two schedule data dates, usually a month, for which progress is recorded, checked, explained in a narrative and submitted for review.
AccountingUse tax
Tax you owe your state on taxable purchases when the seller didn't charge sales tax, commonly on out-of-state material purchases.
Project managementUser-Defined Field (UDF)
A custom field added to schedule activities, such as text, a number, a cost, a date or an indicator, for information the standard fields don't hold.
V
Value Engineering (VE)
A structured review of a design to lower cost or improve value without reducing required function, quality or performance.
AccountingVariable consideration
Parts of a contract price that can change, such as unapproved change orders, claims, incentives, shared savings and liquidated damages, included in revenue only when a significant reversal is not probable.
W
Wage garnishment
A legal order requiring an employer to withhold part of an employee's earnings and send it to a creditor, a child support agency or a taxing authority.
ContractsWaiver of Subrogation
An agreement that an insurer, after paying a claim, won't sue the other contracting party to recover what it paid.
Project managementWarranty Period
The time after completion during which the contractor must correct defective work, typically one year from substantial completion plus any longer manufacturer or specified warranties.
Project managementWeather Allowance
Working days a schedule sets aside for normal bad weather, usually by month and applied only to weather-sensitive work.
TechnologyWebhook
An automatic message one system sends to a URL you choose the moment a specific event happens, like a change order being approved.
Project managementWeekly Work Plan
The set of commitments each trade makes for the coming week in the Last Planner System, drawn from make-ready work in the lookahead and assessed at the end of the week.
AnalyticsWeighted Pipeline
The sum of each open pursuit's estimated value multiplied by its probability of winning: a probability-weighted forecast of new work.
AccountingWH-347
The US Department of Labor's optional form for the weekly certified payroll that contractors on Davis-Bacon covered projects submit.
AnalyticsWin Rate
Pursuits won divided by pursuits decided (won plus lost). Open pursuits are left out.
Project managementWindows Analysis
A retrospective delay analysis that measures how the forecast completion moved in each period between consecutive schedule updates, and why.
AnalyticsWIP schedule
A monthly report that compares each open job's earned revenue to its billings to show over billing, under billing and projected profit.
Project managementWork Breakdown Structure
A hierarchy that breaks the whole scope of a project into smaller, manageable pieces of work, used to organize the schedule, the budget and progress reporting.
ContractsWrap-Up Insurance (OCIP / CCIP)
A single insurance program that covers the owner, GC and enrolled subcontractors for a project, bought by the owner (OCIP) or the contractor (CCIP).
No terms match that search.