The building and the books, one model.
A sample digital twin. In the app today, Models opens your 3D model (GLB) and links coordination issues to it. Pinning RFIs, change orders and cost to the model, as shown here, is planned.
Riverside Medical Center · fictional sample job · concept on sample data
Pick a floor. Pull a thread.
Six floors, a roof and the site of one sample hospital job. Switch overlays to see progress, cost, RFIs, change orders and inspections where they happen. Open CO #14 and press Trace to follow it from the L3 corridor into the books.
Keys: arrows left and right rotate, up and down pick a floor, plus and minus zoom, Escape clears.
Every floor, zone and record in the model (accessible list)
Floors and zones
RFIs
Change orders
Inspections & punch
Ledger lines
Why one model matters.
Field
The super logs missing fire dampers at the L3 corridor. That log becomes RFI-212, pinned to the zone where it happened.
Change
The answer becomes CO #14 at $86,400. Same record, same place: no retyping, no second system.
Ledger
Budget 23-330, the Summit Mechanical commitment and Pay App #9 move with it. The building's 72.6% and the budget's 72.6% are the same number.
Keep going: build your own job, the platform, the interactive demo, change order management, or the explainer life of a change order.
In the app today: Models
Upload a GLB model to a project, view it in the browser and link coordination issues to it. Cost and change overlays on the model, as in the concept above, are Planned.
Build the model with us.
The 3D model viewer is live. Cost and change overlays are planned, and founding contractors help shape them.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →