Esc

↑↓ move↵ openIndex · Pagefind
Simulation · sample data

Watch the overnight close.

A 60-second replay of the job-level close for one sample job, overnight. Agents clear the last invoice, chase lien waivers, accrue change-order cost, cut off cost, draft the pay app and lock the WIP. You approve three things. Then print the packet.

One job's books, one night. Closing a whole company still takes days (every job, the general ledger, a person's review).

Simulation · sample data · agents are planned, not in the product yet

The night shift, fast-forwarded.

Agents work the close overnight on the sample job. Three items need a person. Approve them and the packet is built.

Simulated clock5:40 AM
Your approvals0/3
  1. 6:12 PM
    AP agentDone

    Matched INV-4471 to PO-118 at cutoff, flagged over

    Volt Electric's invoice landed at the period cutoff: $48,200 billed. PO-118 has $42,050 left, so it is over by $6,150. Held for a decision instead of paid.

    Needs a person. Approve the exception: pay $42,050 within PO-118, hold $6,150 until a change order covers it

  2. 7:40 PM
    Compliance agentDone

    Chased missing lien waivers

    Conditional waivers for the Pay App #9 period are missing from Apex Steel and CoreDry. Requests went to both; the pay app is flagged until they come back.

  3. 9:05 PM
    AP agentDone

    Accrued CO #14 cost to 23-330 for the period

    CO #14 (fire dampers, RFI-212) hit the budget when the owner approved it: $86,400 on the contract, $78,100 of cost on 23-330, $68,000 on the Summit Mechanical commitment. Summit hasn't invoiced the damper work done this month, so its cost is accrued to 23-330 for the period. Cost and billing land in the same month.

    Needs a person. Approve the CO #14 cost accrual to 23-330 for this period

  4. 11:30 PM
    Risk agentDone

    Cut off cost for the period: $31,700,000 to date

    Cost posted live all month; tonight it is locked for the period, accrual included. Against an estimated total cost of $43,679,800: $11,979,800 left to spend. Projected margin 11.4% (13.2% at bid).

  5. 2:15 AM
    Billing agentDone

    Drafted Pay App #9

    $2,310,400 this period, less 10% retainage of $231,040: $2,079,360 due. G702 and G703 built from SOV progress, with CO #14 billed on line 10.

    Needs a person. Approve Pay App #9 for owner review

    Approve the CO #14 accrual first: line 10 of this pay app bills that work, so its cost belongs in the same period.

  6. 3:50 AM
    Reporting agentDone

    Locked the period WIP: 72.6% complete

    The WIP updated as costs and billings posted all month; tonight it is frozen as the period-end schedule. Cost-to-cost. Earned $35,778,781, billed $33,000,000: under billed $2,778,781.

  7. 5:40 AM
    Reporting agentDone

    Close packet assembled

    Cover sheet, G702, G703 and a one-job WIP summary. It is released when your three approvals are in.

What's real here, and what isn't.

Sample data

Riverside Medical Center and every number on this page are illustrative. No real company, job or person.

A simulation

This is a scripted replay of where we are headed, not the product running. Nothing here is live.

Runs in your browser

The packet is built on this page. Nothing you click or print is sent anywhere.

The numbers tie out the same way everywhere on the site. See them built step by step in the anatomy of a pay app, make a WIP from your own jobs with the WIP report generator, or meet the agents.

Want your close to look like this?

Agents and month-end close are planned. The project-financial tools they'll run on (budgets, commitments, change orders, pay apps) are live today. Get an email when agents ship.

Your role (optional)

Email gets you product updates: what shipped and what's next. Start a free trial → Founding program →

Open file