Run your first project in os.construction.
Seven hands-on lessons on the sample project in your own trial: an RFI, a daily log, a meeting and its follow-ups, an inspection that ends as a punch item, a change event in the budget, and a pay app. No email course, no signup wall for the lessons.
14-day free trial. Pricing for paid plans isn't set yet.
Your progress
0 of 28 checks done · 0 of 7 lessons complete. Saved in this browser only.
- 01Start a trial and tour the sample projectGet into your own workspace and be able to reach any tool or record on the sample project in two clicks.0/4 checks done
- 02Write, open and track an RFIWrite one clear RFI, open it, and know who has to act next at every stage.0/4 checks done
- 03Record a day in the daily logRecord one complete day on site, the way a superintendent would before leaving.0/4 checks done
- 04Run a meeting and track its follow-upsTurn one meeting topic into a tracked task with an owner, and carry the open topic into next week’s meeting.0/4 checks done
- 05Inspect, observe and punchFollow one failed inspection item all the way to a closed punch item.0/4 checks done
- 06Log a change and read the budgetLog a possible change the day you find it, and see where approved and pending changes land in the budget.0/4 checks done
- 07Bill a pay app, then bring your teamRead and draft a G702/G703 pay app, and leave with a plan for your own first project.0/4 checks done
How it works
Learn it on a real-looking job
- A goal and a 10-minute exercise. Each lesson runs on Riverside Medical Center #24-118, the sample project in every trial workspace.
- Watch, then do. Video walkthroughs where they are published, screenshots recorded in the app, and a diagram of the workflow.
- Check your work. Tick the checklist as you go, then test yourself with a few quick questions.
- Take it to your job. Every lesson links to the free template or calculator for the same work.