From the jobsite to the ledger.
How construction money and data really move, why it breaks between systems, and what we're building to fix it. Written for supers, PMs, controllers and CFOs.
All articles
Cash flow on a construction job: why profitable jobs run out of money
A job can earn a healthy margin and still drain your bank account for months. Profit is an accounting result; cash is timing. Here's how the pay app cycle, retainage and payment terms open a cash gap on every job, and how to see it coming.
Connecting an AI assistant to your construction data: a permissions-first checklist
AI assistants can now read and act on project records through connectors such as the Model Context Protocol. Before you connect one to RFIs, commitments or AP, decide whose credential it uses, what it can see, whether it can write, who approves, and how you'll know what it did.
How to track construction permits, conditions and inspections so nothing lapses
A permit number on a spreadsheet isn't permit tracking. Here is how to keep a permit register, turn every permit condition into an owned task with a date, tie inspections to the schedule, watch the expiration rules that actually apply, and close permits out cleanly, with a worked register.
How to track subcontractor certificates of insurance: collect, review, renew, hold
Collecting a COI once at award isn't tracking. Here is a routine for subcontractor insurance: set the requirements in the subcontract, review certificates and endorsements against them, log every policy's dates, chase renewals before they lapse, and connect it all to payment, with a worked renewal calendar.
AIA A201 vs ConsensusDocs 200: how the two standard contract families differ
AIA A201 is the architect-centered general conditions document used with a separate owner-contractor agreement. ConsensusDocs 200 combines the agreement and general conditions in one form drafted by a coalition of industry groups. Here is how they differ on structure, the architect's role, changes and disputes, plus what to check whichever one you sign.
Builder's risk vs general liability: which policy pays when something goes wrong on site
Builder's risk is property insurance on the project itself while it's being built. General liability covers the contractor's legal liability to other people for injury and damage. Here is how the two differ, who usually buys each, how one fire can involve both, and the gaps contractors find too late.
Certified payroll and the WH-347: a contractor's guide
On Davis-Bacon work, every contractor and subcontractor submits a certified payroll for each week covered work is performed, signed under a Statement of Compliance. Here's who has to file, what changed on the revised WH-347, how to fill in each column, a worked example with fringe credit and overtime that ties, and the mistakes that get payments withheld.
Direct vs indirect costs in construction: job cost, general conditions and overhead
Direct costs can be traced to a specific job or piece of work. Indirect costs support the work without belonging to one item: the job's general conditions and the company's overhead. Here is how to draw the line, how each gets recovered, a worked estimate and the coding mistakes that distort margins.
Earned value vs percent complete: one measures progress, the other tells you what it means
Percent complete says how much of the work is done. Earned value turns that progress into the budgeted value of the work done, so it can be compared with the plan and with what was spent. Here is how the two relate, when to use each, a worked example and the mistakes that make every job look on budget.
Hard costs vs soft costs in construction: what goes where, and why it matters
Hard costs pay for the physical work of building. Soft costs pay for everything that makes the building possible but isn't built: design, permits, financing, legal and insurance. Here is how to tell them apart, the gray areas, a worked owner budget and the mistakes that leave a project short of money.
How to bill stored materials on a pay application, and move them to installed
Stored materials let you bill for equipment and material that is bought and delivered but not yet installed. Check the contract first, get off-site storage approved in advance, send the backup with the bill, put the amount in the stored materials column, and move it to work completed when it goes in so it is never billed twice. Here is each step with a two-month worked example.
How to build a 13-week cash flow forecast for a construction company
A 13-week cash forecast lists every receipt and payment the company expects, week by week, starting from the cash actually in the bank. Date receipts by when each owner really pays, date payments by payroll, terms and pay-when-paid, set a minimum balance, and roll it forward every week against what happened. Here is each step and a worked 13-week example with a low week.
How to build a construction cash flow projection: from the cost curve to the month you're lowest
A job's cash flow projection moves every dollar of billing and cost to the month it's actually paid. Spread cost by month, bill it, delay the receipts by the owner's payment terms and retainage, time each kind of cost by its own terms, then run the cumulative total to find the peak cash need. Here is each step and a worked eight-month example.
How to build a construction estimate from scratch: from takeoff to bid price
A construction estimate is built in layers: quantities from the drawings, direct cost for labor, material, equipment and subcontracts, general conditions from the schedule, then contingency, overhead and profit, insurance and bond. Here is each layer in order, with a full worked example for a 6,000 square foot tenant improvement.
How to build a three-week look-ahead schedule the field will actually use
The master schedule says what has to happen. The three-week look-ahead says who does it, where, and what has to be cleared first. Here is how to pull it from the master, break it down to crew level, screen every activity for constraints, get commitments from the trades, and roll it forward each week, with a worked example.
How to calculate general conditions costs: build them from the schedule, not a percentage
General conditions are mostly the cost of time on site: staff, the field office, temporary facilities and cleanup. Estimate them from the schedule by pricing staff and site costs per month, adding one-time and quantity-driven items, and checking the contract for what belongs in the fee. Here is each step and a worked 12-month example.
How to calculate liquidated damages exposure and carry it in your forecast
Liquidated damages exposure is the days between your forecast finish and the adjusted contract date, times the daily rate, for each milestone that carries LDs, limited by any cap. The hard part is using honest inputs: approved extensions only, a forecast from the current schedule, pending requests and risk shown as separate scenarios. Here is the method and a worked example with two milestones.
How to calculate construction overhead and markup for a bid
Your markup has one job: recover company overhead and leave the profit you planned. To set it, you need an annual overhead budget, a realistic revenue volume, a profit target, and the margin-to-markup conversion most estimators get wrong. Here's the method step by step, with a worked bid and what happens to the number when volume drops.
How to calculate retainage, and how to get it released
Retainage is a percentage of each progress payment held back until the job is done. The math is simple until a reduction kicks in, stored materials carry a different rate, or the owner releases it less a punch list holdback. Here is the formula, a six-month worked example, the release billing, and how it flows down to subcontractors.
How to close the month in construction accounting: a step list from cutoff to lock
A construction month-end close gets every cost and every billing into the right month, proves cash and the subledgers against the ledger, updates the WIP schedule from current cost-to-complete, has someone else review it, and then locks the period. Here is the step list, an example close calendar and a worked example of what one late invoice does to WIP.
How to create a work breakdown structure for a construction project
A work breakdown structure splits the whole scope of a job into pieces you can schedule, budget and measure. Choose the split that matches how the job will be built, decompose to work packages one party can own, check the 100% rule, write a WBS dictionary, then tie the WBS to cost codes and schedule activities. Here is the method and a worked example for a three-story office building.
How to document weather delays so a time extension holds up
Rain, wind, cold and heat stop work on every job, but a weather day only becomes extra time if you can show the weather was unusual, that it stopped critical work, and that you gave notice. Here is what to record each day, how to tally lost days against the contract's allowance, and a worked example for one month.
How to fill out a G702/G703 pay application, line by line
A G702/G703-style pay application is two pages that have to agree: a continuation sheet that bills each schedule of values line, and a summary that turns those totals into the payment due. Here is how to fill in every column and line, a worked example that ties, and the checks that stop it coming back.
How to handle a differing site condition: the first 48 hours
When the excavator hits rock the borings didn't show, or demolition opens a wall full of rot, what the field does in the next day or two decides whether the cost is recoverable. Here is how to make it safe, stop disturbing it, give written notice, document it, get direction, track cost and time separately, and a worked example.
How to level subcontractor bids: building a bid tab that compares the same scope
The low bid is often low because it left something out. Leveling puts every bidder on the same scope before you compare price: break the package into scope lines, tab each bid line by line, price every exclusion with a plug, then rank the leveled totals and check the non-price items. Here is each step and a worked three-bidder example.
How to prepare a WIP schedule, step by step
A work-in-progress schedule turns four numbers per job into earned revenue, gross profit and over or under billing. Here's the month-end procedure in order, from cost cutoff to the journal entry, with a three-job percentage-of-completion example that ties out and the review questions that catch a bad forecast.
How to prequalify subcontractors: a questionnaire, a financial review and a dollar limit
Prequalification decides who is allowed to bid before price enters the picture. Set your criteria first, send one questionnaire, verify what comes back, read the financials, set single-project and aggregate limits, and re-check before every award. Here is each step and a worked example of setting a sub's limits.
How to price a change order: labor, material, subs and markup, worked line by line
Owners review change order proposals line by line, so price them that way: define the scope, read the changes clause, cost labor at burdened rates, add material, equipment and sub quotes, then apply the contract's markups in order. Here is each step and a full worked example from direct cost to the final number.
How to read a contractor's financial statements: the lines a surety, lender or owner's rep checks first
A contractor's financial statements are read for one thing: can this company finish its work and pay its bills? Check the CPA's report level and date, then working capital, the over and under billings, retainage, the gross margin trend, leverage and the notes, and tie the balance sheet to the WIP schedule. Here is the order, with a worked balance sheet.
How to read the payment terms in a construction contract: a clause-by-clause checklist
Payment terms decide when your work turns into cash, and they're spread across the agreement, the general conditions and the supplementary conditions. Find the billing cycle, the review period, the due date, retainage, the conditions to payment, the grounds to withhold and what happens when payment is late. Here is a checklist and a worked timeline.
How to review a subcontractor pay application before you approve it
A general contractor's review of a subcontractor pay application checks the contract and change orders, verifies progress with the field, tests stored materials and retainage, confirms insurance, lien waivers and other compliance, and checks the math, before approving an amount AP can pay. Here is each step with a worked review that cuts a $384,000 request to $307,000.
How to run a construction buyout: buy-by dates, a buyout log and where the savings go
Buyout turns the estimate into signed subcontracts and purchase orders. Run it as a schedule, not a to-do list: work back from each package's need-on-site date to a buy-by date, bid and level, write the scope into the contract, record every variance against the budget, and track the log weekly. Here is each step with a worked buyout log.
How to run a cost-to-complete review: forecast what's left, line by line, before the job fades
A cost-to-complete review is where a job's margin is actually forecast. Cut off cost, refresh commitments, forecast each cost code from what is physically left, compare the estimate at completion with budget, and roll it up into projected margin. Here is each step, a weekly labor check, and a worked four-code example.
How to run a preconstruction meeting, with a sample agenda
The preconstruction meeting is the last chance to agree how the job will run before anyone is on site under pressure. Here is who should attend, a sample agenda covering scope, schedule, submittals, RFIs, changes, payment, safety and site logistics, how to write it up, and a worked example of a subcontractor precon.
How to run a pull planning session: from milestone back to Monday
Pull planning has the trades plan a phase backwards from a milestone, one handoff at a time, so the sequence comes from the people doing the work. Here is how to prepare, who to invite, how to run the wall, how to turn it into a look-ahead, and a worked example for a floor of interior build-out.
How to run a punch walk that closes the list instead of growing it
A punch walk is where the owner, architect and contractor agree what is left before the building is accepted. Here is how to prepare for it, who should walk, how to write items a trade can fix without a phone call, how to close them, and a worked example from one floor.
How to run a toolbox talk crews actually listen to
A toolbox talk is a short safety meeting at the start of a shift. Here is how to pick a topic tied to this week's work, run it as a conversation in ten to fifteen minutes, record who attended, follow up on what crews raise, and a complete example talk for a delivery day.
How to run an OAC meeting: agenda, minutes and follow-up
The weekly owner-architect-contractor meeting is where RFIs get pushed, submittals get chased and owner decisions get made, or don't. Here is how to set it up, a sample agenda, how to write minutes people can act on, and how to carry open items forward so nothing quietly drops off.
How to set up a construction project budget: from the awarded estimate to a locked original
A project budget is the awarded estimate restated as cost lines you will actually track. Reconcile the estimate to the signed contract, take out the fee, load each cost code and cost type, give general conditions and contingency their own lines, lock the original, and from then on change it only through recorded budget changes and transfers. Here is each step with a worked $4.85 million example.
Construction job costing: how to set up cost codes
A cost code list decides what your job cost report can tell you. Too coarse and overruns hide; too fine and the field codes everything to the first line on the list. Here's how to structure codes and cost types, when to follow CSI MasterFormat and when to build your own, a worked tenant improvement budget, and the rules that keep coding clean.
How to track labor productivity: units installed against hours spent
Hours spent only tell you how much labor budget is gone. To know whether the crew is keeping up, compare the hours with the quantity installed: earned hours from the budget unit rate, a productivity index, and a forecast of hours to finish. Here is the method by cost code, with a six-week conduit example and three ways to forecast the rest.
How to track submittals so long-lead items arrive on time
A submittal log only helps if someone works it every week. Here is how to set submit-by dates from the schedule, what to check each week, how to handle revise-and-resubmit, and how to spot the long-lead item that is about to make the job late, with a worked register snapshot.
How to write a daily construction report that holds up later
A daily report takes fifteen minutes to write and is the record everyone reaches for when a delay, change or dispute comes up months later. Here is what to capture, section by section, how to write a delay entry that is actually useful, and a complete sample report for a rain day.
How to write a scope of work for subcontractors that leaves no gaps between trades
A subcontract scope of work decides who pays when something turns out to be missing. Write it from the leveled bid, name the documents it's based on, spell out the items trades argue about, and check every interface item against the neighboring trades with a responsibility matrix. Here is the method, a scope outline and a worked example that finds two gaps and an overlap.
How to write an RFI that gets answered the first time
Most slow RFI answers start with a vague question. Here is how to decide whether you need an RFI at all, how to write the subject, the question and the proposed fix, how to set a needed-by date the designer will respect, and what to do when the answer comes back. With a before-and-after example.
Pay-when-paid vs pay-if-paid: who carries the risk when the owner doesn't pay
Pay-when-paid sets when a subcontractor gets paid; pay-if-paid tries to decide whether it gets paid at all. Here is how the two clauses differ, what the wording looks like, how courts tend to read them, a worked example and the mistakes both GCs and subs make.
Schedule of values vs budget: billing lines and cost codes are not the same thing
The schedule of values splits the contract price into lines the owner pays against. The budget splits expected cost into cost codes the contractor manages against. Here is how they differ, why they shouldn't be the same list, how to map one to the other, a worked example and the mistakes that hide over-billing.
Substantial completion vs final completion: what each one triggers
Substantial completion is when the owner can use the building; final completion is when every last item, document and payment obligation is done. Here is what each milestone triggers, how they differ, a worked retainage example and the mistakes that keep jobs open for months.
AIA G710 vs G714 vs G701: which form for which change
G710 is the architect's no-cost instruction. G714 directs changed work before the price is agreed. G701 records an agreed change in sum and time. Here is who signs each, what each one does to the contract, and the mistakes that turn a G710 into free work.
Back charges: how to issue, dispute and document them
A back charge is a deduction a contractor takes from a subcontractor or supplier for cost they caused. It sticks when the subcontract allows it, notice and a chance to cure came first, and the cost is documented. Here is how to issue one, how to dispute one, and the paper trail both sides need.
Commissioning (Cx) for general contractors: who does what, when
Commissioning checks that building systems are installed, tested and able to run the way the owner needs. What ASHRAE Standard 202, Guideline 0 and LEED's commissioning prerequisite expect, and what the GC, the trades, the CxA and the design team each own from design to the warranty year.
Holdback vs retainage: Canadian prompt payment for US contractors
Holdback is Canada's statutory cousin of retainage. In Ontario every payer holds back 10 percent by law, invoices run on a 28-day clock, and since January 2026 holdback comes out every year. What US contractors need to change before billing their first Ontario job.
Labor burden: the number behind every bid
A carpenter who earns $36 an hour costs you a lot more than $36 an hour. Labor burden is the gap, and if your estimate, your job cost and your T&M rates each use a different version of it, you're losing money in at least one of them. Here's how to build the number.
Notice of non-payment vs stop payment notice vs mechanics lien
A notice of non-payment warns people, a stop payment notice freezes the money and a mechanics lien attaches to the property. What each one does, who sends it, the deadlines in California, Florida and Texas, and what a GC should do when one lands.
Submittal vs RFI: which one to send, and why it matters
A submittal shows the design team what you plan to furnish and install; an RFI asks them what the documents mean. Here is how the two differ, when to use each, how they connect, a worked example and the mistakes that cost time and money.
TCO vs certificate of occupancy: what you need before turnover
A TCO lets an owner occupy safe parts of a building before everything is finished; a certificate of occupancy is the final, permanent approval. What the IBC says, how NYC and Philadelphia handle TCO permits, and what a GC needs in hand before turnover.
Snagging, variations, retention: a US-UK construction term map
A snagging list is a punch list, a variation order is a change order and retention is retainage. A full US-UK crosswalk of construction terms, with the contract differences that matter: JCT and NEC vs AIA, practical vs substantial completion, and Canadian holdback.
Will you lose your bid bond if you withdraw your bid?
Usually not before bid opening, and usually yes after it, unless you made a provable clerical mistake and act fast. Here is how withdrawal, the mistake-in-bid doctrine, FAR 14.407 and state statutes decide it.
Percentage of completion vs completed contract method: how contractors recognize revenue
The percentage of completion method recognizes contract revenue as the work progresses; the completed contract method waits until the job is done. Here is how each one works, where each is allowed for books and for tax, a worked example on one job and the mistakes that distort a contractor's results.
Performance bond vs payment bond: who each one protects
A performance bond protects the owner if the contractor doesn't finish the work; a payment bond protects subcontractors, laborers and suppliers if the contractor doesn't pay them. Here is how they differ, how a claim works under each, a worked example and the mistakes contractors make with both.
General contractor vs construction manager: roles, risk and how each gets paid
A general contractor holds the construction contract and the trade subcontracts, usually after design is done. A construction manager joins during design, either as the owner's adviser or at risk under a guaranteed maximum price. Here is how the roles differ, when each fits, a worked example and the mistakes owners and builders make.
What sureties look for in your WIP
Your surety reads the WIP schedule to answer one question: will this contractor finish its work and pay its bills? Here's what an underwriter checks, the patterns that cost you bonding capacity, and how to hand over a WIP that answers the questions before they're asked.
Review native schedule publication through the API
Use an authorized inventory, explicit decisions and a verified preview to publish supported native activities without confusing planning with field updates.
Publish a native field schedule from Planner
Choose task policies, review field changes, and preserve exact identities when removing or restoring native activities.
Review schedule changes before moving field dates
A practical workflow for checking calendars, activity matches and linked records before applying calculated dates to an adopted schedule.
Acceleration and disruption: track time recovery and production separately
Distinguish earlier completion efforts from productivity effects and organize the records needed to evaluate changed working methods.
Activity durations and logic: build a schedule the field can update
Choose useful activity detail, support durations with production assumptions and test whether dependency logic represents real construction handoffs.
AI in schedule analysis: separate helpful drafting from verified calculation
Distinguish schedule calculation, risk simulation, prediction and AI drafting, then use an evidence-based review process for generated findings.
A construction schedule audit you can actually act on
Review schedule logic, contract requirements and field evidence separately, then turn findings into specific actions with owners and due dates.
Build a baseline schedule submission the reviewer can follow
Prepare the schedule file, narrative, assumptions and transmittal as one traceable baseline package, using the actual project requirements.
Schedule calendars: why five working days can mean different finish dates
Learn how shifts, weekends, holidays and calendar changes affect a construction forecast, with a worked example and practical review checks.
Concurrent delay: establish the facts before labeling the overlap
Distinguish overlapping events from effects on completion, document independent paths and prepare the evidence needed for concurrent-delay review.
Schedule constraints: explain the date before changing the logic
Review imposed dates, understand negative float and document constraints without confusing a calculation result with responsibility for delay.
Choose a delay-analysis method by the question and the records
Compare prospective impact models, period reviews and as-built comparisons by their evidence needs, assumptions and the questions they can answer.
Extension-of-time preparation: build the evidence trail as the event develops
Organize event records, notices, schedule versions and mitigation evidence for a project-specific extension-of-time review.
GAO and DCMA schedule reviews: use metrics to investigate the plan
Understand the role of schedule-quality metrics, check their populations and thresholds, and connect results to a broader reliability review.
Lags and leads: make hidden waiting time visible
Review relationship lags, negative lag and waiting periods with clear units, calendars and ownership before relying on the construction forecast.
Write a monthly schedule narrative that explains what changed
Turn a schedule update into a clear account of progress, forecast movement, logic changes, risks and decisions with a practical narrative structure.
P6 scheduling settings: the assumptions behind the finish date
Review retained logic, progress override, criticality and lag calendars before comparing Primavera P6 schedules or explaining forecast changes.
How to read a schedule analysis report before trusting the findings
Check source identity, method, assumptions, limitations and evidence before treating a schedule-analysis finding as a project decision.
A recovery schedule needs a construction plan behind every earlier date
Evaluate recovery options with crew, access and procurement evidence, then compare forecast benefit, constraints and implementation commitments.
Build a schedule standards crosswalk without inventing one universal rule
Map schedule requirements to the correct document, edition and clause while separating contract obligations, guidance and software definitions.
Time impact analysis: build a model another reviewer can follow
Prepare a traceable time impact analysis with a documented base schedule, event fragnet, controlled calculation and clear limits on the conclusion.
Total float and free float: explain the difference at the coordination meeting
Use a simple construction network to distinguish total float from free float and understand why an activity can affect a trade before completion.
Received a P6 XER file? Preserve the source before reviewing the schedule
Create a reliable intake record for Primavera P6 XER files, check imports and distinguish original schedule data from recalculated results.
Plan with working calendars, then review the result
Plan with working calendars, review retained-source adoption, and explicitly apply calculated dates to eligible linked tasks.
A weekly schedule review checklist for the project team
Confirm the selected schedule, review the next three weeks, check calculated coverage and assign follow-up before changing field dates.
Your first accounting cycle: setup, transactions and close
A practical learning path through the Accounting module's apps, with the people, evidence and review gates needed from opening balances to month-end.
Markup vs margin: the pricing mistake hiding in your change orders
Add 20% to cost and you don't make 20%. You make 16.7%. The gap between markup and margin is small on one change order and expensive across a year of them. Here's the math, where it bites, and how to price changes so the number you quote is the number you keep.
Field to ledger: why daily logs are financial documents
The daily log is usually treated as a field formality. It's actually the first record of almost every number accounting cares about: labor, equipment, deliveries, delays and changes. Here's what to capture, and how it flows to cost, billing and claims.
Close readiness and the weekly cash forecast
A practical handoff from cutoff evidence and job cost-to-complete to a cash forecast owners can review each week.
A second set of eyes on construction accounting
A practical approval handoff for contractor owners and controllers, from invoice review through payment and close.
Project Financials and company Accounting: where the records meet
Understand the difference between a project budget or commitment and the company books, and the handoffs that still need review.
A practical project-to-accounting reconciliation
A repeatable review of budget, commitments, posted costs and billing without assuming that project records automatically post to the ledger.
Retainage: a controller's monthly follow-up
Track retainage receivable and payable separately, reconcile changes, and make release dates visible in the cash plan.
Log a potential change as a change event
Capture a possible cost change early in os.construction: name it, mark its scope, add a rough line item, and check the saved change event.
Schedule a project meeting with a clear agenda
Create a project meeting in os.construction with a recognizable title, a location and an overview of what the team needs to decide.
Cost-to-cost percent complete: when it lies and how to catch it
Cost-to-cost is the most common way contractors measure progress, and it's only as honest as the cost to complete behind it. Five ways it misleads, a worked example of each, and the cross-checks that catch them early.
Why your CRM and your BI should share the job's data core
Most contractors run the pipeline in one system, the jobs in another and the dashboards in a third, then argue about whose number is right. When the pursuit, the project and the report read the same records, the arguments get shorter and the answers get better.
Win rate, weighted pipeline, sales cycle: the pipeline numbers a contractor should watch
A big pipeline number feels good and tells you little. Six pipeline metrics, how to calculate each one honestly, the mistakes that inflate them, and how they connect to backlog.
How to write and verify a useful daily field note
Record a specific observation in the os.construction Daily Log, save it, and return to the day to check the saved entry.
Create a project task and leave a useful progress update
Write a clear task in os.construction, check its saved detail page, change its status, and add a comment that explains the next check.
How to create and open a draft RFI in os.construction
Write a clear question, save an RFI as a draft, review the record, and confirm it has opened in os.construction.
What owners actually want in a monthly report
Most owner reports are long because nobody decided what they're for. Owners read them for four things: where the money is, where the schedule is, what's at risk, and what they need to decide. Here's a structure that answers those, and the numbers that have to tie out.
os.construction is open for trials
The app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
Change events vs change orders: tracking exposure before it's signed
By the time a change order is signed, the money is already spent or already lost. The change event is where exposure starts. Here's how to track it, what to put in the forecast, and why the gap between the two is where margin leaks.
The 3-way match, explained for construction AP
The textbook 3-way match is a purchase order, a receiving report and an invoice. Construction AP needs a version that works for subcontracts, progress billing, retainage and lien waivers. Here's what to match, and where it breaks.
Over billing vs under billing: what your WIP is telling you
Over and under billing aren't good or bad on their own. They're symptoms. Here's how to read each one, the questions that separate a billing problem from an estimate problem, and the checks a surety will run before you do.
Building in public: the founding contractor program
Construction has been sold a lot of software that demoed well and fell apart at the first month-end close. We'd rather build with contractors in the open. Here's what the founding program is, what we'll ask, and what we don't know yet.
Retainage, lien waivers and pay apps on one record
A pay app, the retainage it withholds and the lien waivers that release it are one transaction. Most contractors track them in three places. Here's how each piece works and why they belong together.
Agents with approvals: our approach to AI in the back office
AI in construction accounting goes wrong in two ways: chatbots that know nothing about your jobs, and autopilots that post entries nobody checked. Our model is an apprentice with a supervisor. Here are the rules.
WIP shouldn't be a month-end project
The work-in-progress schedule is the most important report a contractor produces, and most build it from four sources a week after the month closes. Here's the math, what over and under billing really tell you, and why WIP should be live.
The real cost of re-keying a change order
We followed one change order from a ceiling cavity to the pay app and counted every time someone retyped the same facts. The typing is the cheap part.
Why construction needs an operating system, not another app
Most contractors don't have a software problem. They have a seams problem: the same number lives in five systems and none of them agree. The fix is a shared record, not another tool.