Certified payroll and the WH-347: a contractor's guide

On Davis-Bacon work, every contractor and subcontractor submits a certified payroll for each week covered work is performed, signed under a Statement of Compliance. Here's who has to file, what changed on the revised WH-347, how to fill in each column, a worked example with fringe credit and overtime that ties, and the mistakes that get payments withheld.

Charley Forey7 min readPayrollComplianceAccounting
On this page
  1. Who has to file certified payroll
  2. The current WH-347
  3. How to prepare it, step by step
  4. Worked example: one electrician, one week
  5. Mistakes that get payments withheld
  6. Where certified payroll touches job cost and billing
  7. How os.construction handles it
  8. FAQ

Certified payroll is the weekly payroll report every contractor and subcontractor on a Davis-Bacon covered job submits, showing each worker’s classification, hours, rates, fringe benefits, deductions and net pay, with a signed Statement of Compliance. The Department of Labor’s Form WH-347 is the standard format but using it is optional; the weekly submission is not. Prime contractors are responsible for collecting and submitting their subcontractors’ payrolls too.

This is a working guide for the contractor and the payroll person doing it each week. For the definitions, see certified payroll, WH-347, Davis-Bacon and prevailing wage in the glossary.

Who has to file certified payroll

Federal certified payroll applies to laborers and mechanics on contracts in excess of $2,000 for construction, alteration or repair of public buildings or public works covered by the Davis-Bacon Act, and to federally assisted construction under the Related Acts (highway, housing, water and other programs that carry Davis-Bacon requirements). It applies to the prime and every subcontractor tier.

Under 29 CFR 5.5(a)(3)(ii), each covered contractor must submit certified payrolls weekly, for each week in which covered work is performed, to the federal agency if it’s a party to the contract, or otherwise to the applicant, sponsor or owner for transmission to the agency. The prime contractor is responsible for all its subcontractors’ payrolls.

State and city prevailing wage laws are separate. Many have their own forms or electronic portals (California’s DIR eCPR, for example), and a job can be covered by both federal and state rules. Check each.

The current WH-347

The Department of Labor revised Form WH-347 in 2025. The current form carries OMB Control No. 1235-0008 with an expiration of January 31, 2028, and DOL also publishes an online fillable version and an annotated guide. The main changes from the old form:

  • a worker entry number for each worker, numbered from 1, and a partial identifying number instead of a full SSN (full Social Security numbers must not be included)
  • a journeyworker / registered apprentice column (J or RA, with the apprentice’s progression level)
  • the wage determination number on page 1
  • separate columns for the total fringe benefit credit and payment in lieu of fringe benefits
  • a reworked page 2 with the Statement of Compliance checkboxes and an hourly fringe credit table listing each plan

If your payroll system or the agency’s portal still produces the old layout, confirm with the contracting agency what it accepts.

How to prepare it, step by step

Weekly certified payroll cycleSix steps each week: approved timecards by project and day; classify every hour using the wage determination; pay at least the base rate plus fringe, with overtime over 40 hours; fill in the WH-347 page 1 per project; sign the Statement of Compliance on page 2; the prime collects subcontractor payrolls and submits them all to the agency. Records are kept at least three years after the prime contract work is completed.1 TIMECARDSby project, by day2 CLASSIFYper wage determination3 PAYbase + fringe, OT4 WH-347 PAGE 1per project, per week5 STATEMENTof Compliance, signed6 SUBMITprime collects subsKEEP RECORDS AT LEAST 3 YEARS AFTER PRIME CONTRACT WORK IS COMPLETED
The same cycle every week, for every covered project and every subcontractor tier.
  1. Get the wage determination into the job setup. The applicable wage determination is incorporated in the contract; Davis-Bacon determinations are published on SAM.gov. Load each classification’s base rate and fringe, and note its number for the WH-347 header.
  2. Capture time by project, day and classification. A worker who does two kinds of work is paid each classification’s rate for the hours actually spent on it, which only works if the timecard says so.
  3. Pay at least the determination. Each hour needs at least the base rate plus the fringe rate. Fringe can be paid into bona fide plans, in cash, or a mix. Contributions to plans are generally annualized: divide the plan cost by all hours worked, covered and private, to get the hourly credit (29 CFR 5.25(c)). On contracts over $100,000, the Contract Work Hours and Safety Standards Act requires time and a half for hours over 40 in a workweek; fringe contributions and cash paid in lieu of fringe can be left out of the rate the overtime premium is calculated on (29 CFR 5.32).
  4. Fill in page 1, one payroll per project per week. Header: project name and number, payroll number (starting at 1), your business name and the project location, the wage determination number, the week ending date, and whether you’re the prime or a subcontractor. Then a row per worker: entry number, name, partial ID, J or RA, classification, hours each day split straight time and overtime, total hours, hourly rate paid, total fringe credit, cash in lieu of fringe, gross earned on this project, gross for all work that week, deductions and net pay.
  5. Complete and sign page 2. The Statement of Compliance certifies that the payroll is correct and complete, that each worker was paid the full weekly wages earned without improper deductions, and that every worker was paid at least the required wage and fringe for their classification. The apprentice box applies if registered apprentices worked, and the fringe credit box applies if you claim a credit for plan contributions, with the plan table filled in. The signature can be a legally valid electronic signature, not a scan.
  6. Collect subs’ payrolls and submit. Set a weekly deadline for subcontractors that leaves time to review theirs before your own goes in. Check the obvious: classifications match the determination, rates at or above it, hours plausible against the daily logs.

Worked example: one electrician, one week

Illustrative numbersA made-up wage determination of $48.50 base and $24.10 fringe for Electrician. The employer contributes $20.00 an hour (annualized) to bona fide health and pension plans and pays the remaining $4.10 in cash.

The electrician works 8, 8, 8, 10 and 10 hours Monday to Friday on this project: 44 hours, 40 straight time and 4 overtime.

Item Calculation Amount
Straight time 40 × $48.50 $1,940.00
Overtime 4 × $72.75 (1.5 × $48.50) $291.00
Cash in lieu of fringe (column 6C) 44 × $4.10 $180.40
Gross earned on this project (7A) $2,411.40
Fringe credit for plan contributions (6B) 44 × $20.00 $880.00
Total wage and fringe paid $3,291.40

Now check it against what the determination requires: 40 straight-time hours × ($48.50 + $24.10) = $2,904.00, plus 4 overtime hours × ($72.75 + $24.10) = $387.40, a total of $3,291.40. It ties, so the week is compliant. Notice the overtime premium is on the base rate only; the fringe is owed at straight time for every hour, overtime included.

The $880 of plan contributions isn’t cash to the worker, so it isn’t in gross pay; it goes in the fringe credit column and the plan table on page 2. The $180.40 cash fringe is taxable wages and is in gross. Deductions (column 8) come from the payroll register as usual, and net pay (column 9) is what the worker was actually paid for all work that week.

Mistakes that get payments withheld

  • Wrong classification. Paying an electrician’s helper rate for electrician work, or a laborer rate for operator hours, is the most common violation and the most expensive to fix later.
  • Fringe credit taken for plans that aren’t bona fide or aren’t annualized. Credit can’t exceed what was actually contributed per hour.
  • Overtime calculated on base plus cash fringe, or not paid at all because the hours were split across projects.
  • One payroll for two projects. Each covered project gets its own weekly payroll showing only its hours.
  • Gaps in the payroll numbers, missing final payroll flags, or no submission for weeks the agency expects one.
  • Not reconciling to the payroll register. The certified payroll has to match what was actually paid.

The signature matters. Falsifying the Statement of Compliance can lead to civil or criminal prosecution under 18 U.S.C. §1001 and the False Claims Act, 31 U.S.C. §3729, and violations can lead to withheld contract payments, back wages and debarment.

Where certified payroll touches job cost and billing

Prevailing wage rates flow straight into job cost, so the labor burden on a covered job is different from your private work, and fringe paid in cash carries payroll taxes that plan contributions don’t. Many owners won’t release a pay application until the period’s certified payrolls are in, so it belongs in the same monthly package as the pay application. For bidding a covered job, build the determination’s rates into the labor rate with the labor burden calculator.

How os.construction handles it

The Payroll app in Accounting models prevailing wage determinations (base plus fringe per classification, with the apprentice ratio), union locals and rates, and overtime rule sets. Certified payroll is produced per project and week from the same timecards and pay runs, with fringe credit annualized and weeks with no work covered, as the WH-347 data set in JSON, CSV or PDF showing only the last four SSN digits, plus a California DIR eCPR XML file. Wage determinations are entered by hand, other states’ certified payroll formats aren’t built, and generating a file doesn’t submit it. See the payroll guide and construction accounting software.

General information, not legal or payroll advice. Prevailing wage obligations depend on the contract, the funding source and state law; rules vary by state. Sources: U.S. DOL, Form WH-347 and instructions, DOL WHD: Davis-Bacon and Related Acts, 29 CFR 5.5 (contract clauses, payroll and records), 29 CFR 5.25 (fringe annualization), 29 CFR 5.32 (overtime and fringe), 2023 final rule, 88 FR 57526.

FAQ

Is the WH-347 form required?

The form itself is optional; the weekly certified payroll is not. The Department of Labor says use of Form WH-347 is optional, but covered contractors and subcontractors on federal or federally assisted construction must submit payroll information weekly with a signed Statement of Compliance. Any format that carries the same information and the certification works, and many agencies require their own electronic system.

What changed on the revised WH-347?

The Department of Labor released a revised WH-347 in 2025 (OMB No. 1235-0008, expiring January 31, 2028). It adds a worker entry number, a journeyworker or registered apprentice column, the wage determination number, separate columns for the total fringe benefit credit and for cash paid in lieu of fringe benefits, and a reworked second page with the Statement of Compliance and a fringe credit table by plan. Full Social Security numbers must not be included.

How often do you submit certified payroll?

Weekly, for each week in which covered work is performed (29 CFR 5.5(a)(3)(ii)). Payroll numbers start at 1 and run sequentially, and you mark the final payroll for the project. Many agencies also ask for a statement for weeks with no work so the sequence has no gaps; check your contract and the agency's instructions.

Can you sign certified payroll electronically?

Yes. The 2023 Davis-Bacon rule allows electronic submission, and the Department of Labor accepts legally valid electronic signatures, meaning a method that verifies the signer's identity. A photocopied or scanned signature does not meet the requirement.

How long do you keep certified payroll records?

At least three years after all the work on the prime contract is completed (29 CFR 5.5(a)(3)(i)), and longer if your contract, a state law or a pending investigation requires it.

Who is responsible for subcontractors' certified payrolls?

The prime contractor. The regulation makes the prime responsible for the submission of all certified payrolls by all subcontractors, and subcontract clauses flow the payroll requirements down every tier. A late or wrong sub payroll can hold up the prime's payment.

Share this article

Written by

Charley Forey

Founder of os.construction. We're building the operating system for construction. Project Financials follows job money, and company Accounting covers the books and controls. AI agents remain planned. We write about how money and data actually move on a job, and we build in public.

Apply to the founding program →Start a free trial →
Keep readingAll articles →
Job cost

Direct vs indirect costs in construction: job cost, general conditions and overhead

Direct costs can be traced to a specific job or piece of work. Indirect costs support the work without belonging to one item: the job's general conditions and the company's overhead. Here is how to draw the line, how each gets recovered, a worked estimate and the coding mistakes that distort margins.

5 min read

Cash flow

How to build a 13-week cash flow forecast for a construction company

A 13-week cash forecast lists every receipt and payment the company expects, week by week, starting from the cash actually in the bank. Date receipts by when each owner really pays, date payments by payroll, terms and pay-when-paid, set a minimum balance, and roll it forward every week against what happened. Here is each step and a worked 13-week example with a low week.

7 min read

Estimating

How to calculate construction overhead and markup for a bid

Your markup has one job: recover company overhead and leave the profit you planned. To set it, you need an annual overhead budget, a realistic revenue volume, a profit target, and the margin-to-markup conversion most estimators get wrong. Here's the method step by step, with a worked bid and what happens to the number when volume drops.

5 min read

Open file