Esc

↑↓ move↵ openIndex · Pagefind
Play · free · no sign-up

Stack the OS

Every app in os.construction is a floor. The crane swings it; you drop it square on the record below. Stack all 72 and you top out the tower.

Tap, click or press Space

Land it square for a plumb drop. Three plumb in a row regrows the floor, four switches on the laser level.

On the hookBudgetBudget by cost code and cost type, with transfers, forecasts and snapshots.

How to play

Drop the floor that hangs from the crane: tap the game, click it, press Space or Enter, or use the big Drop button. Whatever hangs past the floor below is cut off, so the tower gets narrower when you miss the edge. Land it square (a plumb drop) to keep the full width. Three in a row regrow the floor; four switch on the laser level, a red line that marks the perfect drop.

Every phase of the build swings the crane a little faster: Foundation, Podium, Core & shell, Curtain wall, MEP rough-in, High-rise, Topping out. From floor 20 the wind moves the hook. Miss the tower completely and the app gets re-keyed by hand: game over.

Keys: Space/Enter drop, P pause, M sound, F full screen. Sound is off until you turn it on. With reduced motion, the shake and flashes are off.

The daily challenge gives everyone the same seed, app order and site conditions for the day (UTC): calm morning, gusty afternoon, rush order, tight site, night pour. Scores are checked by replaying your drops on the server, so the leaderboard only shows runs that really happened.

What's in the tower

The floors are the 72 apps in os.construction today, read from the product catalog, so the game grows when the product does.

Financial Management 13
  • Budget Budget by cost code and cost type, with transfers, forecasts and snapshots.
  • Change Orders Follow a change from the first sign of it to an executed change order.
  • Payment Applications Pay apps on the G702 and G703, submitted and approved against the contract.
  • Commitments Subcontracts and purchase orders with schedules of values and retainage.
  • Prime Contracts The owner contract, its schedule of values and approved change orders.
  • Purchase Requests Request a purchase and turn the approved request into a purchase order.
  • Expense Reports Claim personal outlays on an expense report for review.
  • Direct Costs Record costs that don't run through a commitment.
  • T&M Tickets Time-and-material work recorded the day it happens, with a field sign-off.
  • RFQs Request and compare prices for changes from vendors.
  • Change Events Capture potential changes before they become change orders.
  • Owner Reports Monthly owner and GMP cost reports from live data, shared by expiring link.
  • Work Breakdown Structure The cost codes and structure every budget line and cost rolls up to.
Project Management 25
  • RFIs Ask, route and answer field questions, with ball in court and official responses.
  • Schedule A native critical path planner, or bring in P6 and Microsoft Project files.
  • Daily Log Record each day on site, copy yesterday's entries and export to PDF.
  • Submittals The submittal log, review queues and ordered approvers through close and distribute.
  • Drawings Drawing revisions and sets, markups, comparisons and recorded releases.
  • Punch List Punch items with assignees and final approvers, resolved and closed by trade.
  • Emails The project mailbox, with distributions from other tools on record.
  • Action Plans Ordered checklists with sign-offs and hold points, like a pre-pour plan.
  • Inspections Checklist templates run on site with pass, fail and N/A, then signed and closed.
  • Observations Safety, quality and warranty observations, escalated to an RFI or punch item.
  • Coordination Issues Clashes and design coordination problems between trades, pinned to models.
  • Correspondence Letters, notices and other formal items, with official responses.
  • Incidents Injuries and near misses, with corrective actions and the OSHA 300 log.
  • Conversations In-app messaging between the people on the project.
  • Equipment Dispatch, track and maintain equipment across jobs.
  • Workforce Planning Plan who works where each week.
  • Materials Track materials from delivery to stock and the accounting receipt.
  • Timesheets Crew hours by cost code, reviewed and approved.
  • Meetings Agendas, attendance and minutes by topic, with open items carried forward.
  • Models 3D models with revisions, saved viewpoints and pinned coordination issues.
  • Photos Site photos on a timeline or in albums, with tags, location and annotations.
  • Permits A permit register with authority status, conditions and follow-ups.
  • Specifications The project spec book by section, kept with the drawings.
  • Forms Checklists and documents from templates, routed for approval.
  • Transmittals Formal cover sheets pinned to exact versions, with recorded receipt.
Accounting 19
  • General Ledger Trace every balance back to the source record that posted it.
  • Payroll Review pay runs and post labor cost to the job.
  • Work in Progress Compute, review and post WIP schedules with supporting evidence.
  • Chart of Accounts The accounts used by every accounting app.
  • Journal Entries Prepare, approve, post and reverse journals, recurring entries and allocations.
  • Approvals Approval rules and delegated authority for accounting work.
  • Accounts Payable Code bills, resolve holds and release approved payment runs.
  • Accounts Receivable Invoice owners, manage retainage, apply receipts and follow collections.
  • Banking Reconcile statements, forecast cash and review payment exceptions.
  • Job Cost Forecast Inspect job costs and approve cost-to-complete forecasts.
  • Fixed Assets Capitalize, depreciate, transfer and dispose of assets.
  • Leases Lessee schedules, monthly postings and disclosures.
  • Trial Balance Account balances with a drill-down to the entries behind them.
  • Financial Reports Statements, aging and job profitability from the same ledger.
  • Fiscal Periods Resolve close blockers and close eligible periods.
  • Foreign Currency Exchange rates, revaluation and translation for consolidation.
  • Accounting Imports Stage and validate imports before cutover.
  • Accounting Settings Entities, account mappings, terms and tax settings.
  • Accounting Access Accounting roles, entity scope and access reviews.
Preconstruction 3
  • CRM Pipeline, contacts and follow-ups, then the handoff that turns a win into a job.
  • Bidding Bid packages, leveled quotes and an approved award that becomes a commitment.
  • Prequalification Record vendor prequalification before you invite them to bid.
Core Tools 12
  • Analytics Live metrics, shared dashboards and the Project Story, read from the same records.
  • Documents Project files with folders, versions, check-out and folder permissions.
  • Directory Who is on the project: people, companies and distribution groups.
  • Tasks Assign work and move it from Initiated to Closed on a list or board.
  • Admin Project settings, tool access and permission templates.
  • Automations No-code rules: when a record changes, notify people, create tasks or call a webhook.
  • Project Archive Snapshot project records into a downloadable archive.
  • Activity One feed of who created, changed or closed what, across every tool.
  • API Docs The REST API reference for every module, with scopes and examples.
  • Notifications Your inbox for assignments, mentions and records you follow.
  • Webhooks Signed event deliveries to your own systems when records change.
  • Jobs Background work such as imports, exports and archives, with status.

See the platform · What's live

Open file