Esc

↑↓ move↵ openIndex · Pagefind

Agents draft the work. You sign off.

Planned. We’re designing agents that know cost codes, commitments, retainage and AIA billing. They will read the live job, propose what to do, and wait. Nothing will post or send without a person approving it, and every action will be on the audit trail.

Planned · building with founding contractors
PlannedHuman approvalAudit trail
Interactive preview · sample data

Clear the queue. Check the trail.

A simulation on sample data: five proposals from five planned agents on Riverside Medical. Approve or reject each one. Every decision is written to the audit trail with who, what and when.

Approval queue

5 awaiting you
  • AP agent$48,200
    Hold Volt Electric INV-4471

    $48,200 invoice exceeds PO-118 remaining commitment by $6,150. Proposal: hold pending CO #14.

    Sources: INV-4471 · PO-118 · 26-050 Electrical
  • Billing agent$2,310,400
    Send Pay App #9 draft for review

    G702/G703 built from SOV progress and approved COs. $2,310,400 this period, 10% retainage $231,040.

    Sources: SOV · CO #14 · PM % complete
  • Compliance agent2 subs
    Request lien waivers

    Conditional waivers missing from Apex Steel and CoreDry for the Pay App #9 period.

    Sources: Lien waiver log · Pay App #9
  • RFI agentRFI-212
    Send RFI-212 to the architect

    Drafted from the super's daily log: missing fire dampers at the rated L3 corridor. 3 photos, spec 23 33 00.

    Sources: Daily log · IMG_0412 · Spec 23 33 00
  • Risk agent+4.0%
    Escalate 26 Electrical to ops review

    Volt Electric running 4% over budget on Riverside Medical. Projected margin 11.4%, down 1.8 pts from bid.

    Sources: Job cost 26-050 · WIP history

Audit trail

Recording
  1. RFI agent drafted RFI-212 from the daily log
  2. AP agent coded 10 invoices to Job 24-118, matched to commitments
  3. Risk agent ran nightly scan · 14 active jobs

Agents propose. A person approves. Every action, by a person or an agent, is recorded with who, what, when and the source records.

Now watch them close a monthA simulated overnight close on sample data: approve three items, then print the G702/G703 and WIP packet.

Sample data · Riverside Medical Center, Job #24-118. An in-browser sketch on sample data. Agents are planned and not in the product yet.

Capabilities

What Agents covers

1 of 9 are live in the app today. Preview items work with limits noted. Planned items are not built yet, and the founding cohort helps set the order.

  • Planned

    AP agent

    Reads invoices, codes them to job and cost code, matches the commitment and flags overbilling.

  • Planned

    Billing agent

    Drafts the pay app from SOV progress and approved COs, with retainage and waivers listed.

  • Planned

    Risk agent

    Watches cost, schedule and RFIs every night for early signs of fade.

  • Planned

    RFI agent

    Turns field notes into RFIs with photos, spec section and drawing references.

  • Planned

    Compliance agent

    Chases missing lien waivers and COIs before they hold up payment. Insurance policies with expirations are tracked in the app today.

  • Planned

    Reporting agent

    Drafts owner reports and WIP notes from live data.

  • Planned

    Human approval on every action

    Agents will propose. Nothing will post, send or pay until a person with the right role approves. Approval workflows for people are live today.

  • Live

    Audit trail

    Who did what, when and to which record: an item history and project activity feed on supported tools. Agents will write to the same trail.

  • Planned

    Ask anything

    Plain-English questions answered from your own jobs, with the records behind the answer.

Go deeperDocs, glossary and use cases

Help decide what ships next.

This is planned, not in the product yet. Founding contractors get a direct line to the team and a say in the order. The project tools are live today with a 14-day free trial.

Open file