Duct clash at grid D-6
From the super’s phone to the pay app.
RFIs, submittals, drawings, daily logs and photos captured once in the field. On the sample job, a hidden condition logged at 7:42 AM becomes RFI-212, a priced change order and a line on the next pay app without anyone retyping it. Trace it step by step.
- Daily log · 7:42 AMNo fire dampers at grid C-4
Duct crosses the rated L3 corridor wall. 3 photos from the super’s phone.
- RFI-212 · Same morningDrafted from the log, sent to the architect
Photos, spec 23 33 00 and grid C-4 attached. Nobody retyped the note.
- CO #14 · Priced$86,400 change order
Summit Mechanical $68,000 + supervision $6,500 + firestop $3,600 + markup $8,300.
- Job cost · On approval23-330 budget +$78,100
Summit Mechanical subcontract, CCO-03 +$68,000. Same approval, no export.
- Pay App #9 · Same dayNew SOV line, $69,120 billed
80% of CO #14 this period, $6,912 retainage held.
Move the work. Watch the counts.
Drag a card by its grip, or tap Move, to push RFIs and submittals through review. Then turn the super's daily log into RFI-212 and take it all the way to answered.
Open 0
Embed plate size, L2 slab edge
In review 0
Rated wall type, stair 2
Sprinkler head layout, L3 east
Answered 0
Roof drain location
Submitted 0
Fire dampers, product data
Steel shop drawings, L4
In review 0
Panelboards
Door hardware
Approved 0
Gypsum board assemblies
Drag a card by its grip, or tap Move
Missing fire dampers, rated corridor L3
CO #14 drafted · $86,400 →Sample data · Riverside Medical Center, Job #24-118. An in-browser sketch on sample data. The real tools are in the app: start a trial to use them on your own project.
What Projects covers
14 of 17 are live in the app today. Preview items work with limits noted. Planned items are not built yet, and the founding cohort helps set the order.
- Live
RFIs
Ask, route and answer in one thread, with ball-in-court, due dates, distribution and the cost and schedule impact attached.
- Live
Submittals
From spec section to approved, with packages, reviewers, approval routing and revisions that stay current.
- Live
Daily logs
Crew, weather, deliveries, delays and notes, with copy-from-yesterday. Works in any phone browser.
- Live
Photos
Dated, located, in albums with markup, and attached to the log, RFI or punch item they prove.
- Live
Change events
Catch potential changes early and carry them into a priced change order without retyping.
- Live
Three-week look-ahead
Three-week look-ahead and Gantt with dependencies, tied to the master schedule. Import MS Project XML.
- Live
Punch lists
Link items to drawings, assign the sub, close them out with a photo.
- Live
Drawings and markups
Current set, every revision, compare and markups linked to RFIs and punch items.
- Live
Inspections
Templates, signatures and recurring inspections, pass or fail straight into the record.
- Live
Specifications
The spec book by section, linked to the submittals and RFIs that cite it.
- Live
Meetings
Minutes, follow-ups and recurring series, with action items that stay on the record.
- Live
Observations and incidents
Safety and quality observations, incident records and the OSHA 300 log.
- Preview
Forms
Project forms from templates. Filled-PDF output is still to come.
- Live
Models and coordination issues
3D GLB model viewer with coordination issues linked to models and drawings. Cost overlays on the model are planned.
- Live
Documents
Versioning, check-in and check-out, and folder permissions, plus transmittals, correspondence and emails.
- Planned
RFI agent
Drafts RFIs from daily logs and chases overdue answers, for your approval.
- Planned
Native app and offline capture
Today it runs in the phone browser. A native app with offline capture is planned.
What's live today
35 tools on one project record. Turn on the tools you use per project and set access per tool: none, read only, standard or admin.
Project management
- LiveRFIs
- LiveSubmittals
- LiveDaily Log
- LivePhotos
- LiveDrawings
- LiveSpecifications
- LiveSchedule
- LivePunch List
- LiveInspections
- LiveObservations
- LiveMeetings
- LiveIncidents
- LiveForms
- LiveCoordination Issues
- LiveModels
- LiveAction Plans
- LiveCorrespondence
- LiveEmails
- LiveConversations
- LiveTransmittals
- LiveEquipment
- LiveMaterials
- LiveTimesheets
- LiveWorkforce Planning
Core tools
- LiveDocuments
- LiveDirectory
- LiveTasks
- LiveAnalytics
- LiveAdmin
- LiveProject Archive
- LiveActivity
- LiveNotifications
- LiveAPI Docs
Preconstruction
- LiveBidding
- LivePrequalification
Forms render from templates; filled-PDF output is still to come. Webhooks are in preview: subscriptions and signed test deliveries, with tool events rolling out.
How it connects to the rest of the OS
Projects doesn't sync with the other modules. It shares the same records, so a change here is already there.
Go deeperDocs, glossary and use cases
Read how it works
- Projects and the record modelHow a job is structured in os.construction, what a record is, which record types the app has, and how links between RFIs, change events, change orders and pay apps keep the story connected.Preview
- Field tools on phonesDaily logs, photos, observations, RFIs and punch items entered from a phone browser land directly in the job record, so the office sees what the field sees. Native apps are Planned.Preview
- Commitments and change ordersSubcontracts, purchase orders, owner change orders and commitment change orders, and how one change flows from the field to the contract, the commitment and the budget.Preview
- Key concepts: one data coreWhy os.construction keeps project records, project financials and reporting on a single record model, and what that changes day to day.Preview
Terms on this page
- Request for Information (RFI)
- Submittal
- Daily Log
- Change Event
- Potential Change Order (PCO)
- Punch List
- Look-Ahead Schedule
- As-Built Drawings
See it in a workflow
Run your next job on it.
Start a 14-day free trial with a sample project already set up. Want a say in what ships next? Join the founding program.