RFIs that follow the money.

Live · 14-day free trial

An RFI is rarely just a question. The answer often changes scope, cost or schedule. Ask it from the field with the photo and the daily log attached, track who owes the answer, and when the answer costs money, open the change from the RFI itself.

The problem today

How it gets done now

Spreadsheets and disconnected tools, each holding part of the same number.

  1. 01

    The super emails a photo to the PM, who rewrites it as an RFI in a log spreadsheet or a PM tool.

  2. 02

    Due dates and ball-in-court live in that log, chased by memory.

  3. 03

    When the answer adds scope, the PM starts a new PCO and re-types the context.

  4. 04

    Months later, nobody can easily show which RFI caused which change order.

How it works on one record

One entry. Everything downstream already knows.

On os.construction the record is shared, not synced. Here is everything RFI-212 touches, the moment it changes.

One recordRFI-212Missing fire dampers · L3 corridorFrom the daily log
  1. Design teamRouted with photos, due date, ball-in-courtOpen
  2. Change eventOpened from the answer, scope attachedPCO
  3. CO #14Priced and approved, linked back to the RFI$86,400
  4. RFI logEvery open RFI on the job23 open · 4 late

Sample data · Riverside Medical Center, Job #24-118. An in-browser sketch on sample data, not a screenshot of the app.

What you get

What's live and what's planned

4 of 5 are live in the app today. Planned items are not built yet, and the founding cohort helps set the order. See the platform →

  • Live

    RFIs from the field

    Ask from the browser on any device, with photos, location and drawing reference attached.

  • Live

    Due dates and ball-in-court

    Who owes the answer and by when, visible to everyone on the job.

  • Live

    RFI to change event

    When the answer changes scope, open the change from the RFI with context intact.

  • Planned

    RFI agent

    Drafts the question from field notes and flags overdue answers. A person sends it.

  • Live

    Drawing markups

    Link RFIs to the drawing sheet they reference.

FAQ

Straight answers.

Can the architect answer without an account?

Today the design team answers inside the app: invite them to the project with access limited to what they need. Answering without an account is something we're looking at.

How does an RFI become a change order?

If the answer adds or changes scope, you open a change event from the RFI. The question, photos and answer come with it, so the PCO and later the CO always point back to the RFI that caused them.

Can I import my existing RFI log?

If your RFIs live in another project management system, the importer can bring them across (preview, run with our team). Otherwise our free RFI log template is a clean starting point.

Can I use it today?

Yes. RFIs are live in the app. Start a 14-day free trial. The RFI agent is planned.

Try it on a real project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.