Esc

↑↓ move↵ openIndex · Pagefind
About os.construction

Construction runs on disconnected software.
We're building the operating system.

Today a single change order gets typed into the field app, the project tool, the accounting system, a spreadsheet and an email thread. We think it should exist once, and every part of the business should read from it.

Projects, project Financials, company Accounting, Analytics and CRM are live. AI agents are planned.

The mission

From six places to one record.

Project Financials brings budgets, commitments, change orders and pay apps together with project management. Company Accounting provides separate tools for the company books. Analytics is live; AI agents are planned.

Company Accounting includes AR reconciliation, WIP snapshot approval and posting, and close checks. Validate opening balances and historical source coverage before cutover; review the accounting workflows.

6 systems · re-keyed1 record · illustrative
ONE RECORDField appDaily logsProject mgmtRFIs · COsAccountingJob cost · APSpreadsheetsWIP · SOVEmailApprovalsBI reportsMonthly
Today, one change order lives in six places and gets re-keyed into each. In the OS design, every tool reads and writes the same record.
Principles

What we won't compromise on.

  1. 01

    One record

    An RFI, a change order, a commitment and a pay app are one connected record, not four copies in four systems. Enter it once in the field; the office, the books and the forecast see it.

  2. 02

    Humans approve, agents work

    Planned: AI agents that do the repetitive work, like coding invoices, drafting COs and chasing lien waivers. A person approves every action that matters. Approvals already work this way for people on COs and submittals, and tracked changes are logged.

  3. 03

    Construction-literate

    Built around SOVs, cost codes, commitments, change orders and retainage, not bent from generic project software. If it doesn’t speak construction, it doesn’t ship.

  4. 04

    Your data is yours

    You own what you put in. Export lists to CSV and key records to PDF, or read it all through the REST API. We don’t sell it, and we don’t train models on your company’s data without your permission.

  5. 05

    Build with the field

    We design next to the supers, PMs and controllers who will use it. Founding contractors set the roadmap with real jobs, not slide decks.

Why now

Three things changed.

AI can finally do the paperwork

Language models can read an invoice, match it to a commitment and draft a change order. They need clean, connected data to do it well.

Integrations hit their ceiling

Most stacks are stitched together with nightly syncs and exports. Every sync is a place for numbers to drift and for a fade to hide.

Margins leave no slack

When a few points of fade can wipe out a job’s profit, waiting for month-end to see it is no longer good enough.

Team

Built in the open, by people you can reach.

Want to talk to us directly? Ask about the product, the roadmap or the founding cohort.

A note from the founder

Construction deserves software built the way the work actually happens.

I've spent about ten years connecting construction software. I built integrations between construction ERPs and project systems at Viewpoint, worked with Top 100 contractors at Nearmap, and set the standards for AI agents on Trimble's Agentic AI Platform. Through Build Flows, I build data platforms for contractors that pull numbers out of their project, accounting and scheduling systems so leadership can finally trust them.

The pattern is always the same. Project tools are expensive and live in their own silo. Construction ERPs are powerful but painful to implement and harder to change. AI gets bolted on top of all of it without the clean data or the guardrails it needs to be trusted. So people become the integration: re-keying change orders, rebuilding WIP in spreadsheets, reconciling numbers that should never have disagreed.

os.construction is how I think it should work. Projects, project Financials and company Accounting with connected data. Analytics is live and AI agents are planned, with human review envisioned for agent actions. Built with the contractors who will use it every day.

Charley Forey, Founder

Open file