Accounting / Accounting workflow playbook

Accounting workflow playbook

Follow billing to cash, bill to payment, time to job cost, assets and leases, and forecast to close with clear review checkpoints.

On this page

Use this playbook to understand how the Accounting module and its apps work together. Each workflow starts with a business event, produces an accounting result and ends with evidence you can review. Complete company setup first and use the same company, entity and reporting date when comparing results.

Choose a starting point

Your responsibility Start here Finish by checking
Bookkeeper or AP team Bill to payment Open bills, payments and bank reconciliation agree.
Billing or collections team Billing to cash Open invoices, retained balances, receipts and deposits agree.
Payroll team Time to job cost Approved pay, cash and liabilities reconcile to the posted run.
Project manager Forecast to close Actuals and approved estimates explain the job’s forecast. Project-scoped access does not grant AP, AR or payroll access.
Controller Forecast to close and reporting Reconciliations, WIP, checklist evidence and statements cover the same period and entity scope.
Implementation team Imports to reconciled opening books Source balances, open documents and the trial balance agree.

Bill to payment

Business result: know what you owe, why it is payable and which payment settled it.

  1. In Accounts payable, enter a bill or use Ready to bill for eligible approved requisitions and direct costs. Check vendor, entity, dates, project and cost-code coding, retainage and source evidence.
  2. Submit the bill. Resolve matching, compliance, lien waiver, banking and other holds shown in the bill’s Payment holds panel: record or accept the missing waiver or certificate, or have an approver override the hold with a reason. The default strict policy requires an independent approver. Editing a submitted bill resets its approval progress.
  3. Prepare a payment run from eligible bills. Choose the entity and pay-from bank, enter any partial amounts, and review cash remaining and ACH readiness.
  4. Have an authorized releaser review and release the run. Download the supported checks, positive pay or NACHA file as needed. File generation does not send funds; follow your bank’s process and confirm its outcome.
  5. In Banking, match the resulting statement activity and complete reconciliation with independent review. Compare AP aging and the bill’s payment history with the ledger.

If something changes: correct a posted bill or payment through its supported void, reversal or source correction. Do not fix the subledger by editing posted journal lines. A bank return or unresolved hold requires its own review before payment is attempted again.

Billing to cash

Business result: follow an amount from work billed to the customer’s remaining balance and the bank deposit.

  1. Review the source in project Financials. A certified owner pay app does not itself post an accounting invoice or receipt. Use the supported billing bridge to draft the AR invoice; supported non-progress methods use the documented API workflow.
  2. In Accounts receivable, check the customer, entity, revenue, current amount, retainage and applicable tax. Submit, independently approve and post the invoice. Download the PDF or send a posted invoice to its configured billing contact.
  3. Record a draft customer receipt and allocate it to eligible current or retainage balances. Leave a prepayment or excess amount as unapplied cash when appropriate. A different authorized reviewer must approve the receipt before an authorized user posts it; only then does it affect the books and become eligible for deposit. A later authorized cash application is a separate accounting action.
  4. If the receipt posts to undeposited funds, group it into a deposit. The receipt preparer cannot deposit it. Match the deposit or direct bank receipt to the statement, then reconcile and obtain review.
  5. Compare AR aging, retained balances, unapplied cash and the AR control balances at the same as-of date. Effective posting dates preserve the historical effect of supported reversals and applications.

Example: an invoice with $10,000 of revenue and $1,000 of retainage, with no tax, records $9,000 current AR and $1,000 retainage receivable. A $9,000 receipt allocated to current AR clears the current amount; it does not clear the retained $1,000. Review and release retainage through the supported workflow when it becomes billable.

If something changes: cancel eligible unposted invoices with a reason. Use credit memos, retainage releases or source reversals for posted documents. A corrected pay app must follow the documented rebilling path rather than creating an unrelated duplicate invoice. See Progress billing.

Time to job cost

Business result: turn reviewed labor inputs into pay, job costs and liabilities you can explain.

  1. Configure employees, pay groups, approved bank instructions, tax data and account mappings in Payroll. Payroll permissions are separate from general accounting access.
  2. Import eligible approved time for linked employees or enter permitted run time. Check job, cost code, earnings, rates, deductions and exceptions, then calculate the run.
  3. An independent authorized reviewer approves the calculated inputs. Recalculate when relevant inputs or year-to-date wages change; approval cannot stand in for reviewing a changed calculation.
  4. Post the approved run and review the resulting journal, labor and burden job-cost entries, checks and liabilities. With a standard burden rate, post the monthly burden true-up from payroll setup. Prepare supported payment files and verify the bank outcome separately.
  5. Review payroll liabilities and remittances, reconcile bank activity, and use the resulting posted labor costs in job-cost inquiry and forecasting.

Before filing: read the payroll guide’s coverage and setup limits. A generated tax report or payment file is not confirmation of agency acceptance, payment or complete jurisdiction coverage.

Equipment and leases to the books

Business result: explain equipment cost, depreciation and lease obligations without double-counting acquisitions.

  1. In Fixed assets, create the asset or capitalize a supported posted AP line. Capitalizing the bill line reuses its acquisition posting; it does not book another purchase.
  2. Review the register, accounts and depreciation schedule. Preview and post the depreciation run; use the supported adjustment or disposal workflow when the asset changes.
  3. Preview eligible approved equipment logs before posting equipment charges to jobs. Resolve missing codes or rates instead of assuming every field log produces a cost.
  4. For a supported lessee lease, review classification, term, rate and payment assumptions. Review monthly runs and the balance-sheet and disclosure results. Record the lessor’s bill or payment against the selected clearing account, and record term or payment changes as lease modifications.
  5. Compare the asset register and lease schedules with their ledger accounts and close evidence. Correct errors through the originating app’s supported workflow.

Forecast to close and reporting

Business result: connect what jobs have cost and are expected to cost with earned revenue and period financial statements.

  1. In Job cost inquiry and forecast, review posted actuals, remaining commitments, approved contract changes and the project’s entity assignment. Unposted project records are not posted job-cost actuals.
  2. Save dated PM cost-to-complete inputs and obtain controller approval. Review missing budgets, source warnings and changes since the last estimate.
  3. Compute a period-end WIP snapshot. Review each job’s calculation trace, exceptions, overrides, earned revenue, billings, underbillings, overbillings and loss provisions. An independent controller approves the revision.
  4. Post the approved snapshot. It books the WIP amounts at period end and reverses the next day. If relevant costs or billings change, recompute and review the new revision; stale evidence cannot support approval or posting.
  5. In Periods and close, finish required operational work, bank reviews and subledger tie-outs. Work the close cockpit tasks, explain flux variances above threshold and get account reconciliations reviewed by someone else. Revalue foreign-currency balances and, for a group, match and settle intercompany balances. Prepare evidence, obtain independent checklist approval and resolve blockers. Required missing or failed evidence is not a pass.
  6. Review financial reports, including the consolidated statements for a group, trial balance, ledger detail and supporting schedules for the closed period and intended entity selection. Save exports with their reporting dates and filters so reviewers know the scope.

If a late adjustment arrives: use an eligible correction date or the authorized reopening process. Reopening a hard-closed scope requires two people. Review changed evidence and close again after the correction.

Imports to reconciled opening books

Business result: start with a ledger and open documents that reconcile to the source system.

  1. Agree the cut-over date, entity, account mappings and source control totals. Retain source exports before loading data.
  2. In Accounting Imports, load master data, then open AP and AR, then the opening trial balance for the same date. Import supported payroll YTD and asset registers through their documented workflows when needed.
  3. Review the preview and resolve mappings and errors. A different authorized user approves and applies the import. The trial balance cannot bypass a control-account difference against imported open documents.
  4. Run the Cut-over reconciliation report and resolve every failing check: it compares the opening entries, open AP/AR documents and retainage, subledger tie-outs, fixed assets, opening job cost and payroll YTD with the stored source files. The go-live checklist waits until it passes. Keep the import history, control totals and report as evidence.

QuickBooks Online can pull supported records into reviewed imports; other documented source systems use supported files. Check connection and import limits before planning a cut-over. External sync does not automatically post or write back to the source system.

Follow the same handoffs through the API

Use the Accounting API guide and the operation’s published contract. Integration code should preserve entity scope, document revisions, approval separation, idempotency behavior and correction paths. Creating a draft, posting a document and generating a file are distinct actions with distinct results; do not treat one successful response as completion of the whole business workflow.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file