Accounting Access
Role presets, entity scope, a configurable segregation-of-duties library, access review campaigns and a control register for company books.
Accounting Access decides who can see and do what in company books, and records the evidence that someone checked. Access is granted separately from project access: a project role never grants accounting rights. Its tabs are Members, Access reviews, Segregation of duties and Control register. Open it from the company app launcher under Accounting > Accounting Access; it appears when your accounting access includes it.
- Who uses it
- Accounting owners and company admins; designated access reviewers; control owners; auditors with a read-only grant read the control register.
- When
- Onboarding and offboarding; quarterly or ad hoc access review campaigns; whenever a control objective falls due.
- What it holds
- Each member’s role preset, permission flags and entity scope; frozen access review snapshots and their decisions; the segregation-of-duties rules; control owners and evidence.
- Connects to
- ApprovalsAccounting SettingsFiscal Periods
Key workflow
- Grant a role. Choose a preset: owner, controller, accountant, AP clerk, AR clerk, payroll admin, project manager view or read-only auditor. Individual flags override the preset.
- Limit the scope. Restrict a grant to some entities. A project manager view grant only sees its own projects and is refused entity-wide views.
- Check separation of duties. Every grant change is checked against the company’s rules on the person’s effective duties: their own flags plus any approval right a delegation lets them use. A warn conflict saves only with an audited reason; a block conflict is refused, reason or not. The default library includes construction pairs: creating vendors and entering bills with releasing payments, posting with approving journals, payroll setup with releasing payments, and changing vendor bank details with releasing payments. Administering access together with releasing payments is blocked by default.
- Tune the library. Change a default rule’s severity, wording or on/off (never its duties), or add your own rules of two to four duties. Each change needs step-up and a reason, and weakening a rule is flagged in the audit log. Raising a rule never strips anyone’s access: the save lists who already holds the combination, and they appear in the conflict report and the next review.
- Open an access review campaign. Run it quarterly or ad hoc, for the company or one entity, with a due date, a dormancy threshold (90 days by default) and one or more designated reviewers. Opening it freezes one item per person: role, flags, entity and project scope, expiry, MFA, accounting API tokens (never the token itself), delegations, last accounting activity, a dormant flag and their conflicts. Company administrators and expired grants are listed too.
- Decide every item. Keep, modify or revoke each item with a reason, after step-up. Modify and revoke go through the same grant-change path as the Members tab, so entity limits, segregation of duties and the audit trail all apply. Keep records a certification only when the live grant still matches the snapshot. The campaign completes only when every item is decided, and stores its counts.
- Record qualified reviews. On Qualified reviews (in the Accounting Admin group), a user who manages access with no entity or project limit registers CPAs, payroll specialists and tax advisors for the policy areas they may sign. A registered reviewer records a sign-off per area, jurisdiction and policy version, which expires after the area’s maximum validity or when its version changes. The page shows which pairs are covered and which are not reviewed.
- Keep the control register. The register lists ten control objectives, each with an owner, a frequency (monthly, quarterly, semiannual or annual), a procedure and its evidence. Some evidence is read live, such as completed access review campaigns, close reviews and integrity runs; owners append the rest, such as a recovery rehearsal report. Each objective shows as current, overdue (with days late), no evidence or no owner.
Controls
- Nobody certifies their own access. The service and a database constraint both refuse it. If a reviewer’s own access is in scope, the campaign needs a second reviewer or cannot be opened.
- An access review snapshot cannot change after it is taken, and each item is decided once: a database trigger refuses edits, second decisions and deletions. Recorded control evidence is append-only.
- A delegation that would hand someone a blocked combination of duties is refused.
- MFA can be required for payment release, vendor banking, payroll PII and grant changes, with an authenticator step-up for sensitive actions.
- API tokens need the explicit accounting step-up scope for sensitive actions; an unscoped token is not enough.
- Every grant change, review step, rule change, owner change and evidence record is audited.
Current boundaries
For the full procedure, exceptions and examples, read the Security and controls workflow guide.
API operations
26 operations · 12 read · 14 write · base path /rest/v1.0/companies/{company_id}/accounting
- GET
/access_reviewsList access review campaigns - POST
/access_reviewsOpen an access review campaign - GET
/access_reviews/{id}Get an access review campaign with its snapshot - POST
/access_reviews/{id}/cancelCancel an access review campaign - POST
/access_reviews/{id}/completeComplete an access review campaign - POST
/access_reviews/{id}/items/{item_id}/decisionDecide one access review item - GET
/compliance/policy_areasPolicy areas and their qualified sign-off status - GET
/compliance/reviewersList registered qualified reviewers - POST
/compliance/reviewersRegister a qualified reviewer - POST
/compliance/reviewers/{id}/revokeRevoke a qualified reviewer registration - GET
/compliance/signoffsList qualified sign-offs - POST
/compliance/signoffsRecord a qualified sign-off - GET
/compliance/signoffs/{id}Show a qualified sign-off - GET
/compliance/signoffs/{id}/attachmentsList evidence on a qualified sign-off - POST
/compliance/signoffs/{id}/attachmentsAttach evidence to a qualified sign-off - POST
/compliance/signoffs/{id}/revokeRevoke a qualified sign-off - GET
/control_objectivesSOC 1 control register - GET
/control_objectives/{objective_key}Get a control objective with its evidence - PUT
/control_objectives/{objective_key}Assign a control objective's owner and frequency - POST
/control_objectives/{objective_key}/evidenceRecord control evidence - GET
/grantsList accounting access - PATCH
/grants/{id}Set a member's accounting access - POST
/grants/access_reviewCertify an access review - GET
/sod_conflictsSegregation of duties conflict report - GET
/sod_rulesList segregation of duties rules - PUT
/sod_rules/{rule_key}Create or change a segregation of duties rule
Parameters, request and response fields, errors and a generated example for each operation are in the REST reference for this app. Read scopes, step-up and permissions in the Accounting API guide.
Keep exploring
Related across os.construction
- GlossarySegregation of dutiesSplitting key steps of a transaction, such as entering, approving, paying and reconciling, between different people so no one person can both commit and conceal an error or fraud.
- GlossaryAudit TrailA permanent, time-stamped record of who created, changed or approved each piece of data, and what it was before.
- BlogConnecting an AI assistant to your construction data: a permissions-first checklistAI assistants can now read and act on project records through connectors such as the Model Context Protocol. Before you connect one to RFIs, commitments or AP, decide whose credential it uses, what it can see, whether it can write, who approves, and how you'll know what it did.
- DocsFinancial ReportsA 48-report library: statements, consolidated statements with NCI, cash flow, aging, job profitability, WIP, retainage, payroll, flux and control reports, exportable to CSV, XLSX and PDF.
- DocsJournal EntriesPrepare, approve, post and reverse journals, recurring entries and job cost allocations with maker-checker controls.
- Blogos.construction is open for trialsThe app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →