Prime contracts
Set up the owner contract with its parties, dates and schedule of values, see approved owner change orders roll into the revised contract, and record owner billing periods against it.
On this page
The prime contract is your agreement with the owner. The Prime Contracts tool holds it: who the parties are, the key dates, the schedule of values (SOV) you bill against, the owner change orders that have been approved against it, and the owner billings. The Budget reads approved owner change orders from here, and Payment Applications bills against its SOV. For the ideas behind owner billing, see Pay apps, SOV and retainage.
Open it from the project’s Project Tools menu: Prime Contracts (/companies/{company}/projects/{project}/tools/prime_contracts).
The contract list
The tiles at the top total Original, Approved COs, Revised, Billed, Received and Remaining across the project’s prime contracts. The list shows #, Title, Owner/Client, Status, Executed, Original Contract Amount, Approved COs, Revised Contract Amount, Invoiced/Billed, % Paid and Remaining.
Create a prime contract
-
Create
Click + Create. Under General Information, enter a Title. Leave Number blank to auto-number. Set the Status, Retainage %, and check Executed if it’s already signed. Check Private to limit who can see the contract’s details.
-
Parties
Pick the Owner/Client and the Contractor from the directory, and the Architect/Engineer from your users.
-
Contract dates
Fill in the dates you have: Contract Date, Start Date, Estimated Completion Date, Substantial Completion Date, Actual Completion Date, Signed Contract Received Date and Execution Date.
-
Scope
Use Description, Inclusions and Exclusions for what the contract covers and doesn’t. Click Create.
Prime contract statuses are Draft, Out For Bid, Out For Signature, Approved, Complete and Terminated. On the contract, pick a status and click Update Status. Mark Executed and Mark Not Executed set whether it’s signed. Edit changes the rest, and Delete removes it.
Build the schedule of values
On the contract’s Schedule of Values tab, add one line per billable part of the work: Cost Code, Description, Qty, UOM, Unit Cost and Amount, then click Add Line. Enter either an amount or quantity × unit cost. Each line shows what has been Billed, % Billed and what is Remaining, with a Grand Total at the bottom. Edit a line in place and click Update.
The SOV total is the Original Contract Amount. Keep it tied to the signed agreement: the pay app’s G703 lines come from these lines.
Someone who can see the contract but not its SOV sees the general information only, with a note that Schedule of Values details are restricted.
Owner change orders
You don’t type owner change orders into the prime contract. You create them in Change Orders as potential change orders against the prime contract, usually from a change event. Once approved, they appear on the contract’s Change Orders tab with their title, status, amount and approval, and the Approved Change Orders Total.
The Revised Contract card adds them up: Original Contract Amount plus Approved Change Orders gives the Revised Contract Amount. The Budget shows the same approved owner changes in its Approved Budget Changes column.
Record an owner billing period
The Billings/Payments tab lists Payment Applications (Owner Billings) for this contract, with each one’s period, status, this-period amount, retainage and payment due.
-
New Billing Period
Under New Billing Period, enter the Invoice #, Period Start, Period End and Billing Date, and click Create Billing Period. The billing gets a G703 continuation sheet with a line for each SOV line.
-
Enter progress
On each line, enter Work completed this period and Materials presently stored. The line shows scheduled value, previous, this period, materials, completed to date, % done, balance and retainage.
-
Check the G702 Summary
The summary and the tiles show Scheduled value, Completed to date, Retainage withheld to date at the contract’s retainage rate, Previous payments and Payment due.
-
Move it through status
Pick a Billing status (Draft, Under Review, Revise and Resubmit, Approved or Paid) and click Update Status. A Paid billing is locked.
Paid records the workflow status only after the billing is fully funded by cash allocations; it doesn’t transfer money. The billing page links to the project Cash Ledger and Reconciliation, which live in Payment Applications.
For the full G702/G703 workflow (separate work and materials retainage, retainage released, submit and approve buttons, and Bill in accounting to create the owner’s AR invoice), create the pay app in the Payment Applications tool and pick this prime contract as its Contract. If the contract bills by progress pay app and its approved billing terms in Accounting include a GMP, a billing here can’t be set to Approved; certify it through Payment Applications, which checks it against the GMP (see GMP owner pay apps).
Export
Export PDF on the contract downloads it as a PDF with its general information, parties, dates and schedule of values.
Attachments
The General tab lists the contract’s attachments. Click Add Attachment to add one.
GMP, retainage release and closeout
These steps happen in company Accounting, not in this tool:
- GMP and other billing methods. Each prime contract has a billing method in Accounting. A progress contract bills by certified pay app; when its approved billing terms include a GMP, Payment Applications checks each pay app against the GMP before it can be certified. A cost-plus contract with a GMP and fee bills by monthly cost-of-work applications from job cost in Accounting (Customer billing → GMP billing). Time and material, other cost-plus, unit price and milestone billing methods bill from approved billing terms through Accounting’s API. Billing terms are also proposed and approved through Accounting’s API. See Owner billing on GMP jobs and Accounts receivable.
- Retainage release. On a posted AR invoice that holds retainage, Release retainage drafts a retainage release invoice that follows the normal invoice approval and posting.
- Closeout documents. A final retainage release needs every required item on the contract’s closeout checklist complete. In Accounting, open Customer billing and select Contract closeout, pick the project and then the contract to see the Contract closeout checklist. Required items are either manual items an AR approver marks received or approved submittal revisions that the checklist verifies against the project record. See Closeout and retainage release.
Permissions
Viewing the tool needs view access to Prime Contracts. Creating a contract or a billing period needs create access; editing a billing needs edit access. Private contracts and restricted SOV details limit what an individual user sees. See Set up permission templates.
Keep exploring
Related across os.construction
- DocsOwner billing on GMP jobsContract-defined cost-of-work billing, GMP controls, how Accounting bills cost-plus and GMP contracts from approved billing terms, and how that differs from progress pay apps and AIA cost-of-work forms.
- DocsPayment applications: G702/G703 progress billingCreate a pay app against a prime contract, subcontract or purchase order. Enter this period's progress on the G703, check the G702, then submit and approve.
- GlossaryRetainageA percentage of each progress payment that the owner (or GC) holds back until the work is substantially or finally complete.
- ExplainerGetting Paid: Pay Apps, Lien Waivers, Stop Payment NoticesHow construction payment works: pay apps, retainage, the four lien waiver types, preliminary notices, notices of nonpayment, stop notices and liens.
- GlossarySchedule of Values (SOV)The breakdown of the contract sum into line items with assigned values, used as the basis for progress billing.
- BlogAIA A201 vs ConsensusDocs 200: how the two standard contract families differAIA A201 is the architect-centered general conditions document used with a separate owner-contractor agreement. ConsensusDocs 200 combines the agreement and general conditions in one form drafted by a coalition of industry groups. Here is how they differ on structure, the architect's role, changes and disputes, plus what to check whichever one you sign.
Was this helpful?