What is os.construction
Project management, project Financials and company Accounting, with reporting on shared records.
On this page
os.construction is an operating system for construction companies. It brings project management, project Financials, company Accounting and reporting together. The catalog contains 72 apps: 53 project tools, including Scheduling, and 19 Accounting apps. Accounting is live. Project tools and company books have separate scopes and permissions; supported workflows connect their records. AI agents remain planned.
Most contractors run the job in one system and the books in another, then rebuild the truth in a spreadsheet at month-end. os.construction is built to remove that gap.
The problem it solves
A typical mid-size contractor runs something like this:
- Project management in one tool: RFIs, submittals, daily logs, drawings, change events.
- Accounting in another: job cost, AP, AR, payroll, the general ledger.
- Reporting in Excel or a BI tool: WIP schedules, fade reports, cash forecasts.
- Glue made of exports, imports, sync jobs and people re-keying numbers.
Every hand-off is a chance for the numbers to drift. A change order gets approved in the PM tool but the budget in accounting is a week behind. The pay app is built from a spreadsheet that does not match the commitment log. The WIP schedule is right on the day it is finished and wrong the day after.
None of this is a people problem. It is an architecture problem: two databases will always disagree eventually.
What os.construction is
Six modules with distinct scopes. Projects and Financials work inside a project; Accounting is company-wide. CRM, Analytics in Insights and Accounting are live, and Agents are planned:
The areas use related records where a workflow supports the connection; a project record does not automatically create an accounting entry. When a superintendent logs an observation, it can raise an RFI; the RFI’s answer can open a change event; and a change event can post to the budget and be priced into change orders and commitment change orders without retyping.
A worked example
The docs use one sample project throughout: Riverside Medical Center, Job #24-118, Phase 2. Contract value $48.2M plus $1.1M in approved change orders. The same project is loaded into every free trial, so you can follow the chain in the app.
Here is the supported chain. Accounting adds explicit billing, posting and review steps before project activity appears in company books and WIP.
- The super finds missing fire dampers in the L3 corridor and records it.
- That becomes RFI-212, with photos and the spec reference attached.
- The architect’s answer leads to a change event and CO #14, priced at $86,400.
- The change event posts to the budget for the cost code, and the mechanical sub’s commitment change order covers their share.
- The approved change raises the prime contract and is billed on Pay App #9, with 10% retainage calculated.
- Bill the certified pay app in company AR, post the approved invoice and supported job costs, then compute, review, approve and post the period-end WIP snapshot.
In a disconnected stack, each of those steps is a re-key. In os.construction, each step works from records that already exist.
Who it is for
General contractors and specialty contractors who feel the gap between the field and the books: supers and PMs who want the office to see what they see, project accountants who are tired of reconciling two systems, and executives who want job numbers they can trust on any day of the month.
Where it stands today
os.construction is live at app.os.construction. Start a 14-day free trial: you get a workspace with the Riverside sample project to explore, then invite your team. Pages marked Planned in these docs describe work that is not built yet, such as AI agents. The Accounting module includes the ledger, AP, AR, payroll and controlled WIP workflows. Pages marked Preview describe available workflows with documented scope and limits. Pricing for paid plans isn’t set yet; talk to us.
Keep exploring
Related across os.construction
- BlogWhy construction needs an operating system, not another appMost contractors don't have a software problem. They have a seams problem: the same number lives in five systems and none of them agree. The fix is a shared record, not another tool.
- DocsProjects and the record modelHow a job is structured in os.construction, what a record is, which record types the app has, and how links between RFIs, change events, change orders and pay apps keep the story connected.
- ExplainerWhy one data core: the same record everywhereSee how RFIs, field records, change orders, budget, pay apps and CRM link on one data core in os.construction, and why links beat copies and syncs.
- Blogos.construction is open for trialsThe app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
- DocsKey concepts: one data coreWhy os.construction keeps project records, project financials and reporting on a single record model, and what that changes day to day.
- ExplainerChoosing what to put in the data core firstA migration plan for os.construction: which records go in first, what the import tool brings over today, and what is a file, a manual step or planned.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →