Getting started / Guides by role

Guides by role

Where to start in os.construction if you're a project manager, superintendent, project accountant or controller, owner's representative, or the company admin.

On this page

Each path below lists the pages to read first and what to try on the sample project, Riverside Medical Center #24-118. The tools you can open depend on your permission template on each project, and Accounting has its own access; see Roles and permissions.

Project manager

You run the job’s paperwork and money: questions, submittals, changes, contracts and billing. Your permission template is usually Project Manager, which gives admin rights on the project management and financial tools.

  1. Find your way around, then pin the tools you use daily to the dock.
  2. RFIs and Submittals: ball in court, due dates, workflows and revisions.
  3. Meetings and Tasks: agendas, minutes and follow-ups.
  4. Change orders and Commitments, with the concepts in Change events and PCOs.
  5. Budget, Prime contracts and Payment applications.
  6. Documents and drawings and Transmittals for issuing records to the team.
  7. Schedule and the update cycle.

Try it: open RFI-212 on Riverside and follow it to its change event and CO #14. The longer walkthrough is the project manager guide.

Superintendent

You run the site: the daily log, field issues, inspections, punch and the look-ahead. Most supers work on a phone or tablet in the browser.

  1. Field capture: what works on a phone today.
  2. Daily log: one page per day, copied forward from the day before.
  3. Observations, Inspections and Punch list.
  4. T&M tickets for extra work signed in the field.
  5. Labor, equipment and materials: timesheets, crews, equipment and deliveries.
  6. Schedule and Last Planner weekly work plans.

Try it: add today’s daily log entry on Riverside and raise an observation from it. The longer walkthrough is the superintendent guide.

Project accountant or controller

You own the company books: AP, AR, payroll, job cost, WIP and the close. Accounting is company-wide and has its own access, separate from project permission templates.

  1. Accounting overview and Accounting setup.
  2. End-to-end workflows: from a vendor bill or a pay app to the ledger.
  3. Accounts payable and Accounts receivable, including progress billing.
  4. Job cost and WIP and Payroll.
  5. Banking and reconciliation and Period close.
  6. Security and controls and Accounting access.
  7. Cash forecasting and Job cost reports.

Try it: open Accounting in the trial workspace and look at job cost and WIP for Riverside. For the finance view of the product, see CFOs and controllers.

Owner’s representative

You review what the contractor sends you: pay apps, change orders, meeting minutes and the schedule.

  1. Payment applications and Pay apps, SOV and retainage.
  2. Change orders and Owner billing on GMP jobs.
  3. Meetings, RFIs and Punch list.
  4. Analytics for dashboards across your projects.

The longer walkthrough is the owner’s representative guide.

Company admin

You set the company up: people, access, projects, integrations and the move off your old systems.

  1. Invite your team and Permission templates.
  2. Two-factor sign-in and account security and, if you use an identity provider, SCIM provisioning.
  3. Company settings: offices, departments, project stages, types and regions, trades, webhooks and sample data.
  4. Insurance and COIs and Connections to outside systems such as HubSpot and QuickBooks Online.
  5. Your first project and the Migration guide.
  6. Audit log and history and Data ownership and export.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file