Other project tools
A short guide to the rest of the project tools, from Photos, Forms and Correspondence to Coordination Issues, Incidents, Action Plans, Emails, Conversations, Models, Project Archive, Directory, Activity and Notifications.
On this page
Every tool on this page opens from the project’s Project Tools menu. Each section covers what the tool is for and the main things you do in it. What you can see and change depends on your permission level for that tool.
Photos
Photos holds the project’s site pictures, on a Timeline or in Albums.
- Upload Photos: pick the Image file, then optionally an Album, Description, Location, Taken At, Tags, GPS Latitude and GPS Longitude, and Private. On a phone, the file picker opens the camera or photo library.
- Find photos: search by filename or description, filter by Tags, location or date taken, and Group by date, month, album or location.
- Albums: type a New album name and click Add Album. Move a photo with Album and Move on the photo.
- On a photo: edit the description, add tags, set the location and GPS coordinates, leave comments, and add an Annotation note with Add Annotation. The full-screen viewer zooms, rotates and steps through photos.
Forms
Forms are filled-in checklists and documents built from a template. The tool has Forms, Templates, Workflow Templates and Recycle Bin tabs.
- Build a template: on Templates, click New Template, enter the Template name, Category and Description, add sections and fields (each with a Field label and Field type), and optionally attach a Template PDF. Click Create Template.
- Fill in a form: click + Create Form, pick the Template, enter Name, Form Date, Number and Description, then answer the template’s fields. If the template has a fillable PDF, its fields can be filled in on the form.
- Route it for approval: in the form’s Approval Workflow card, pick people under Choose approvers, set their order with Move up and Move down, leave Sequential (one group per approver) checked to have them approve one after another, and click Start Workflow. The current approver holds the ball in court and clicks Approve or Reject, with an optional comment.
The Workflow Templates tab keeps named approver sequences; add one with Add Workflow Template. A form can be marked Private.
Correspondence
Correspondence tracks letters, notices and other formal items that don’t fit RFIs or submittals. Each item belongs to a type you define. Tabs: Items, Types and Recycle Bin. Tiles count Open, In Review, Overdue and Closed items.
- Set up types: on Types, add a type with a name, Type abbreviation (used as the number prefix), description and Private by default, plus any Configurable Fields (text, long text, date, number, select or yes/no).
- Create an item: click + Create, pick the Type, and enter Title, Status, Assignee, Received From, Due Date, Distribution and Description.
- Work it: add replies under Responses with Add Response, ticking Mark as official for the formal answer. Move the item with Mark Open, Mark In Review, Close or Reopen. Status changes are recorded as responses.
Select items on the list to Mark Closed, Export CSV or Delete them.
Coordination Issues
Coordination issues track clashes and design coordination problems between trades, often found in a model. Tiles count Open, Blocked, Ready for review and Closed issues.
- Create an issue: click + Create and enter Title, Status, Priority (Low, Medium, High or Critical), Issue Type, Trade, Discipline, Assignee, Due Date, Location, Ball in Court and Description. Link it to a model with Linked Model and a sheet with Linked Drawing.
- Move it along: the status buttons follow the issue’s workflow: In Progress, Blocked, Unblocked, Ready for Review, Moved to Observation and Closed, with Close and Reopen.
- Follow up: discuss it under Comments, attach files, and use Create task to open a linked task, listed under Follow-up Tasks.
Issues can also be placed directly on a model; see Models below.
Incidents
Incidents records injuries, near misses and other safety events, and builds the project’s OSHA 300 log from the recordable ones. Tiles count Open, Recordable, Draft and Closed incidents.
- Record it: click + Create and fill in Event Information: Title, Status, Event Date (or Time Unknown), Location, Work Activity, Assignees and Description. For a recordable case, check Recordable and set the Case Classification, Days Away From Work and Days On Restriction.
- Add the details: record Injuries (Affected Person, Affliction Type, Body Part) and Corrective Actions (Action Type, Assignee, Due Date), on the form or later on the incident. Witness statements and attachments are added on the incident with Add Statement and Add Attachment.
- Close it: an incident moves from Draft to Open to Closed with Mark Open and Close, and can be reopened. Corrective actions have their own Open, In Progress and Closed status.
OSHA 300 Log on the incident list shows the recordable cases with totals for deaths, days-away cases, transfer or restriction cases and days. It reflects what you record; check it against your own recordkeeping obligations.
Action Plans
Action plans are ordered checklists that need sign-off, such as a pre-pour plan or a quality plan for a system. Tabs: Plans and Templates (create one with + Create Template). Tiles count In Progress, Draft, In Revision and Completed plans.
- Create a plan: click + Create, optionally pick a Template, and enter Title, Number, Type, Manager, Specification and Description.
- Add items: with Add Item, give each a Title, Section, Assignee, Due Date and an optional Required Record (submittal, inspection, form, observation, photo or document). Link the record on the item; it shows Requirement met or Requirement pending.
- Set sign-offs and hold points: Configure assignments and blocking adds the people who sign each item, each Required or optional, with a Verification method. A Blocking scope of Later items in this section or All later items in this plan makes the item a hold point: later items wait until its required signatures are in.
- Publish and work it: click Publish. Assignees sign with Sign assignment, and each item’s status is set to Open, In Progress, Delayed or Closed. Overall Progress tracks the plan. Click Revise to change a published plan.
Emails
Emails is the project’s mailbox, with Inbox, Archive, All, Spam and Recycle Bin folders. Distributions recorded by other tools, such as a submittal’s Close & Distribute, are recorded here.
- Send an email: click + Create Email, choose To and CC from project people, or add To (external addresses) and CC (external addresses), enter a Subject and Message, attach files, link project records under Related Items, and click Send.
- On a thread: Send Reply, Forward, Move to Inbox, Archive or Mark as Spam, and link more related items.
- Filter the list by Unread, From or Private.
Conversations
Conversations is in-app messaging between people on the project.
- Click New Message, choose Participants, add a Subject and Message, and click Start Conversation. A conversation with more than one other person is marked Group.
- In a conversation, type a message and click Send. Under Conversation settings you can Rename it and Add participant.
Models
Models holds 3D models as GLB files, and is where model-based coordination happens.
- Upload a model: enter the Model name and Discipline, pick the GLB model file, and click Upload Model. The file must be a self-contained GLB. Upload a new revision from the model with Upload Revision; switch between revisions with Model revision, and Download GLB to get the file.
- Place issues: click Add Coordination Issue, then click the model to pin it, and enter a title, description and assignee. Pinned issues appear in the model’s Clash register and in the Coordination Issues tool, and can be closed or reopened from the model.
- Save views: Save Viewpoint stores the current camera position under a name. Pins and viewpoints use model coordinates, so they stay in place across revisions.
Federated view combines up to eight models, one revision each, that share coordinates and units. Pick them and click View selected models; the page address keeps your selection, so you can share it.
Project Archive
Project Archive takes snapshots of project records to download. Click Create new archive, enter a Name, choose the Tools Included, and click Generate Archive. The list shows each archive’s Status; when it’s complete, Download it as JSON or ZIP. See Export to CSV and PDF for other exports.
Directory
The project Directory lists who is on the project, with Users, Companies and Distribution Groups tabs.
- Users: + Add Person with their name, Email Address, Job Title, phone numbers, Company, Project Role and Project Permissions Template. A person’s page shows their Project Permissions by Tool. Select people to Export CSV or Deactivate them.
- Companies: + Add Company with name, address, phones, Website, License Number and Trades. A company’s page lists its people and whether it’s prequalified.
- Distribution Groups: + Add Distribution Group with a Name, Description and Members, for reuse in distribution lists.
Filter users by company, permission template, project role and status. Permission templates are covered in Permission templates.
Activity
Activity is the project’s feed of changes: who created, updated, closed or deleted what, across tools. Filter by Item Type, Person or Action. For the change history of one record, use that record’s history panel; see Audit log and history.
Notifications
Notifications is your in-app inbox for the project: items assigned to you, mentions and changes to things you follow.
- Switch between All and Unread, open a notification to go to its record, and use Mark all as read.
- Preferences turns each event on or off for In-app and Email, and sets an Email Digest frequency. Click Save Preferences.
- Settings is for admins of the Notifications tool: for each tool’s events, add roles or users who should also be notified. These recipients are added to the default ones; they don’t replace them.
Keep exploring
Related across os.construction
- DocsProjects and the record modelHow a job is structured in os.construction, what a record is, which record types the app has, and how links between RFIs, change events, change orders and pay apps keep the story connected.
- Blogos.construction is open for trialsThe app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
- DocsWriting approval rulesPlanned. How approval rules would decide who approves agent proposals and records, by type, amount, job and role, with sequential and parallel steps.
- GlossaryAs-Built DrawingsDrawings marked up to show how the project was actually built, including every field change from the original design.
- GlossaryBuilding Information Modeling (BIM)A process of creating and managing a shared 3D model of a building that carries data about its parts, not just geometry.
- BlogHow to run an OAC meeting: agenda, minutes and follow-upThe weekly owner-architect-contractor meeting is where RFIs get pushed, submittals get chased and owner decisions get made, or don't. Here is how to set it up, a sample agenda, how to write minutes people can act on, and how to carry open items forward so nothing quietly drops off.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →