Every permit, every condition, and the proof behind it.
Keep each permit's authority reference, status, conditions and expiration on the project, with the document that backs every step, instead of a spreadsheet and a folder of emailed approvals.
14-day free trial. Pricing for paid plans isn't set yet.
From application to a closed permit.
The top lane is what the authority did, as your team records it. The bottom lane is the work the permit puts on the job: its conditions, the receipts that satisfy them and the renewal.
Where permits catch the job out.
- Failure 01
A status nobody can prove
The log says Issued, but the issued permit is in someone's inbox. When the inspector or the owner asks for it, the team goes looking.
- Failure 02
Conditions read once, then forgotten
The permit came with conditions to meet before framing inspection or before occupancy. They were read at issuance and live in a PDF nobody owns.
- Failure 03
Expirations found on site
A permit lapses between inspections and nobody noticed, because the expiration date sat in a spreadsheet column that was never sorted.
One permit record, every step with its evidence.
Each permit is a record on the project with its authority, its history and its conditions. Steps are appended, never overwritten, and each one says what backs it.
- 01
A register per project
Create a draft permit with the authority, jurisdiction, permit type and scope. Record the submission with the authority's reference number when you file it through the authority's own process.
Answers failure 01 - 02
Evidence on every step
Submission, corrections, approval, issuance, renewal and closure each cite an exact uploaded document version, an HTTPS link or a written reason the evidence is missing. Later uploads do not change what a recorded step cites.
Answers failure 01Documents guide → - 03
Conditions that gate the permit
Each condition has what it is required before, a due date and an assignee who is an active member of the project. Issuance cannot be recorded while a condition required before issuance is open, and the permit cannot close while any condition is open. A permit administrator can link an open condition to an existing inspection for follow-up.
Answers failure 02 - 04
Field receipts, office review
A field user submits a pinned document version as the receipt for a condition. A different permit administrator with access to that document accepts it and completes the condition in the same step, and each decision is kept.
Answers failure 02 - 05
Expiration and the permit queue
An issued permit past its recorded expiration shows as expired without rewriting its history, and a renewal must extend the recorded expiration. The permit queue lists the work you can see across projects, filtered by owner or deadline, and opens the exact condition.
Answers failure 03
Try it on your own project.
Start a 14-day free trial and turn on the Permits tool for a project to see the register, its conditions and the permit queue across projects.
Rather click than read? Open the interactive demo: open RFI-212, turn it into CO #14, approve it and watch the budget and Pay App #9 update, on sample data in your browser.
Exactly what ships today.
Status comes from the app's own export, not from this page's copy. Live is in the product now; Preview is in the product with limits we document; Planned is not built yet.
- LivePermitsPermit register, conditions, append-only authority history with evidence, field receipt review and a cross-project queue.
- LiveDocumentsThe exact document versions permit steps and condition receipts cite.
- LiveInspectionsAn open permit condition can link an existing inspection on the same project for follow-up.
Where we don't fit yet
- No filing with authorities. There is no connection to e-permitting portals. You file the way you do today and record the submission and the authority's reference in the app.
- No expiration reminders yet. Expired permits show as expired and the queue sorts by deadline, but the app does not send reminders before a permit or a condition comes due.
- Inspection links are for follow-up. Linking an inspection to a condition helps the team find it. Passing the inspection does not complete the condition or record the authority's approval; someone records that with its evidence.
- No insurance or license dependencies. Some authorities tie a permit to the contractor's insurance and license. That dependency is not tracked on the permit; insurance certificates are reviewed separately in Company Admin.
Permits, Documents and Inspections are live today. Connections to authority portals and reminders are not built. See the full list on the changelog and the platform overview.
Your books, your data.
Permissions per tool
Permission templates set each tool to none, read only, standard or admin, enforced the same way in the app and the API.
MFA and SCIM
Authenticator-app sign-in for every user, and SCIM 2.0 provisioning from your identity provider.
Change history
Tracked changes record who changed which fields and when, shown as item history and in the activity feed.
Your data, exportable
Export lists to CSV and key records to PDF. Leaving should never mean losing your history.
REST API · 2,549 endpoints
Project and accounting records are available through the documented REST API, with OAuth tokens and signed webhooks for the tools you keep.
We don't hold SOC 2 or any other security certification today, and we won't imply that we do. Read exactly what is in place, or go straight to the API documentation.
What to look for in permit tracking software.
Whatever you end up buying, these are the questions worth asking in a demo. They come from how permits slip on real jobs, not from any one product's feature list.
Who it's for
General contractors and construction managers who pull building, trade and right-of-way permits, and specialty contractors who pull their own. A project manager or project engineer usually owns the register, superintendents meet the conditions in the field and preconstruction starts the applications.
Evidence behind every status
Issued should mean there is an issued permit on file. Ask what the software keeps for each step, and whether a later upload can silently replace it.
Conditions as tracked work
Conditions are where permits bite. Check that each one gets an owner and a date, and that it stays visible until it is met.
History you cannot rewrite
When an inspector or an owner asks what happened, you need the sequence as it was recorded, not the latest edit.
Who can say it was issued
Recording an issuance or a closure is a bigger claim than drafting an application. Ask whether those steps need more access than ordinary edits.
A view across jobs
One permit lapsing on one job is the expensive one. Look for a list of permit work across projects, sorted by deadline.
What it does not do
Ask plainly whether the software files with your authorities or only records filing, and whether it sends reminders. Both answers change how your team works.
Common questions.
What is permit tracking software?
Software that keeps a contractor's record of every permit on a job: who issued it, its reference number, where the application stands, the conditions attached to it, who owns each condition and when the permit expires. It replaces the spreadsheet and the folder of emailed approvals.
Does os.construction file permits with the building department?
No. You submit to the authority the way you do today, through its portal or counter. os.construction records what happened: the submission with its authority reference, corrections, approval, issuance, renewal and closure. A status in the app never means something was filed.
What evidence does each step need?
Every recorded authority action cites an exact uploaded document version, an HTTPS link, or a written explanation that the evidence is missing. A later upload of the same file does not change the version a step already cites. A link is kept as a reference, not as a retained copy.
Who can record that a permit was issued?
Access follows the project's permission templates. Standard users draft and edit permits, record submission, corrections and withdrawal, and manage conditions. Recording approval, issuance, suspension, renewal or closure needs admin access to the Permits tool.
How are permit conditions handled?
Each condition has a description, what it is required before, a due date and an assignee from the project. Issuance cannot be recorded while a condition required before issuance is open, and the permit cannot close while any condition is open. A field user can submit a pinned document version as the receipt for a condition, and a different permit administrator with access to that document accepts it and completes the condition in one step. Conditions stay visible after the permit closes.
Can I see permit work across all my projects?
Yes. The permit queue lists the permit work you are allowed to see across projects, filtered by owner or deadline, and opens the exact condition on its permit.
What happens when a permit expires?
An issued permit past its recorded expiration date shows as expired, without rewriting its history. Renewal is recorded as its own step. The app does not send expiration reminders yet.
Read, calculate, then try it.
Free tools
Terms on this page: Certificate of occupancy · Temporary certificate of occupancy · Inspection checklist · Closeout · Audit trail
Track a permit on your own project.
Start a 14-day free trial and add the Permits tool to a project, or click through the interactive demo on sample data in your browser first.