Job cost report template
One line per cost code: budget, approved and pending changes, committed cost, cost to date, the PM’s cost to complete, EAC and variance.
37 working files for PMs, superintendents, estimators and project accountants. Excel workbooks and CSVs open in Excel or Google Sheets with the formulas live. Checklists and forms print cleanly or save as PDF. No email required.
Real .xlsx workbooks with live formulas, drop-downs, conditional formatting, frozen headers and an Instructions sheet. Each has a guide with a worked example.
One line per cost code: budget, approved and pending changes, committed cost, cost to date, the PM’s cost to complete, EAC and variance.
List activities, durations and predecessors.
One row per owner change order from the first request to the pay app it is billed on.
Enter every bidder’s price and scope per line.
Spread a job’s cost along an S-curve, then move every dollar to the month it is actually paid: owner payments lag and hold retainage, subs are paid when you are, suppliers on terms.
One row per bid package from budget to executed subcontract.
An architect’s supplemental instruction is not supposed to change the contract sum or time.
Each one prints, downloads as CSV or Markdown, and comes with how to use it and an FAQ.
Track every CO from change event to approval to the pay app it lands on. Requested vs approved amounts, schedule impact, linked RFI.
One row per RFI: question, spec section, ball-in-court, required vs answered dates, and whether it carries cost or schedule impact.
Know which subs and suppliers owe you a conditional or unconditional waiver before you release a dollar. Progress and final.
G703-style columns with live formulas: total completed and stored, % complete, balance to finish and retainage. Lines by CSI division.
TCO application to retainage release on one page: occupancy planning, TCO, substantial completion, Cx, final inspections and CO, turnover documents and final payment.
Cut off costs, update cost-to-complete, compute earned revenue and over/under billing, review, post. With the formulas.
One row per job with live formulas: % complete (cost-to-cost), earned revenue, over/under billing, gross profit to date, backlog and a loss-job flag.
By cost code: revised budget, committed, cost to date, the PM’s cost to complete, estimate at completion and variance. Flags a CTC below open commitments.
Per subcontract: billed, retained, released and the balance still held, with totals that tie to your retainage payable.
Cutoff, waivers, stored materials backup, % complete vs the field, executed COs only, retainage math and insurance, before a sub pay app rolls into yours.
A printable form to price a change: scope, reason, cost breakdown with markups, schedule impact and three signature blocks.
Required-on-site date minus lead time and review time gives a submit-by date. Flags submittals late to submit and reviews that are overdue.
Policy, limits vs required limits, additional insured, expiration date and a status formula that flags expired and expiring-in-30-days certificates.
One log per day: weather, manpower by company, work performed, equipment and deliveries, inspections, delays and safety, signed.
A one-page owner letter: full or limited NTP, commencement date, contract time, completion dates, early-work scope with a not-to-exceed cap, and the contractor’s acknowledgment.
Written notice to a sub before you back charge: what happened, the clause, the cure period, the cost if it isn’t cured and the sub’s response. Pairs with the back charge log.
One row per bid package: the budget carry, the low leveled bid, the award, excluded scope bought separately and net buyout savings, then approved commitment change orders and the savings left against the carry.
Notes Sample rows are illustrative (Riverside Medical Center is our sample job) and marked for deletion. Lien waiver forms, retainage rules and closeout requirements vary by state and contract; your contract documents and counsel govern. The SOV formulas assume 10% retainage: edit the rate to match your contract. The WIP schedule uses the cost-to-cost method; follow your revenue policy and your CPA. Status flags in the submittal and COI logs compare against today's date when the file is opened.
os.construction links the RFI, the CO, the commitment and the pay app on one record. The change order log, RFI log, submittal log and SOV live in the app. The Accounting module adds vendor waiver controls, retainage workflows and reviewed WIP snapshots. Use these templates as working aids alongside the posted accounting records.