A safety observation log that proves it got fixed.

Write down what was seen, who is fixing it and by when, and check it before you close it. A log like this turns a hallway conversation into a record.

  • Free
  • No signup
  • Print · CSV · Markdown
Download CSVDownload Markdown

Safety observation log

os.construction · free template
Project
Week of
Recorded by
Distribution

Observations

#DateLocationHazardBehavior or conditionPriorityAssigned toCorrective actionDueStatusClosed
1L2 stair 2 landingHousekeeping: debris and cords in path (SAMPLE · delete this row)ConditionMediumDrywallClear path; route cords overheadInitiated
2Roof, east edgeGuardrail section removed for material hoistConditionUrgentRoofingReinstall rail or set warning line before work resumesReady for review
3Site gateDelivery driver without hi-vis vestBehaviorLowGC superVests at gate; brief at next toolbox talkClosed

Sample rows are illustrative and marked for deletion. Your contract, drawings and specifications govern. Template from os.construction/resources/templates/safety-observation-log

How to use it

Using the safety observation log

  1. Record it when you see it: location, what the hazard is, and whether it is a behavior or a condition.
  2. Set the priority by what could happen, and stop the work on the spot when it can’t wait for a log.
  3. Assign one company or person to fix it, with a due date and the corrective action you expect.
  4. When they say it’s fixed, mark it ready for review and look before you close it. If it isn’t right, send it back.
  5. Review open observations weekly, at the toolbox talk or the coordination meeting, and look for repeats by trade or location.
How an observation moves to closedObserved and recorded, then Initiated, then Ready for review, then Closed. Not accepted: from Ready for review back to Initiated.Not acceptedObserved and recordedLocation, hazard, priorityInitiatedAssigned, awaiting correctionReady for reviewAssignee says it’s fixedClosedChecked and accepted
  1. Observed and recordedLocation, hazard, priority
  2. InitiatedAssigned, awaiting correction
  3. Ready for reviewAssignee says it’s fixedNot accepted: back to “Initiated”
  4. ClosedChecked and accepted
How an observation moves to closed
Text version
  1. Observed and recorded: Location, hazard, priority
  2. Initiated: Assigned, awaiting correction
  3. Ready for review: Assignee says it’s fixed
  4. Closed: Checked and accepted

Not accepted: from “Ready for review” back to “Initiated”.

In os.construction

Do this in os.construction instead of a spreadsheet

Observations in os.construction are typed under Safety, Quality, Commissioning or Warranty, with a priority from Low to Urgent, an assignee, a due date and a Safety panel for the hazard, contributing behavior and contributing condition. They move from Initiated to Ready For Review to Closed (or Not Accepted, back for rework), with a response log and photos, and can be converted to an RFI or a punch item. Save common observations as templates.

Try it on the sample project

Every trial workspace includes a sample project to run this workflow on. 14-day free trial. Pricing for paid plans isn't set yet.

FAQ

Questions about the safety observation log

What is a safety observation?

A recorded note of an unsafe behavior or condition seen on site, with who is responsible for correcting it and by when. Many safety programs also record positive observations.

Is this log a replacement for our safety program?

No. It is a tracking sheet. Your safety program, the competent person on site and the regulations that apply to your work decide what has to be done and documented.

What about injuries and incidents?

Report those through your incident procedure and any required recordkeeping. Use this log for the hazards you find and correct.

Who should close an observation?

Someone other than the person who fixed it: they mark it ready for review, and the person who raised it, or the safety lead, checks and closes it.

Can I export observations from os.construction?

Not from the Observations tool today. Use filters and saved views to share the current list in the app.