Inspection checklists for pre-pour, framing and MEP rough-in.
Three starter checklists for your own quality inspections before the authority or special inspector arrives. Answer each item Pass, Fail or N/A, and give every failure a follow-up.
Inspection checklist starter pack
os.construction · free template- Project
- Location / area
- Inspection date
- Inspector
- Responsible contractor
- Drawing / spec references
Pre-pour (slab or footing)
| Item | Pass | Fail | N/A | Comment / follow-up |
|---|---|---|---|---|
| Forms set to line, grade and dimensions on the drawings; braced and tight | ||||
| Subgrade or base prepared and approved; no standing water, mud or frost | ||||
| Vapor retarder lapped, taped and undamaged where required | ||||
| Reinforcing size, spacing, laps and cover match the drawings; chairs and supports in place | ||||
| Embeds, anchor bolts, sleeves and blockouts located and secured | ||||
| Under-slab MEP installed, tested where required and signed off by each trade | ||||
| Required authority and special inspections complete and documented | ||||
| Concrete mix, testing agency and pour sequence confirmed; weather plan in place | ||||
| Access, pump or chute location and cleanup area ready |
Framing
| Item | Pass | Fail | N/A | Comment / follow-up |
|---|---|---|---|---|
| Wall layout, openings and dimensions match the drawings | ||||
| Stud size, spacing and plates as specified; top plates lapped | ||||
| Headers and beams sized and supported as shown | ||||
| Hold-downs, straps and connectors installed as shown on the structural drawings | ||||
| Shear wall sheathing and nailing pattern as specified | ||||
| Fire blocking and draftstopping in place where required | ||||
| Backing and blocking installed for fixtures, grab bars, cabinets and equipment | ||||
| Framing ready for MEP rough-in: no conflicts at known duct and pipe routes |
MEP rough-in (before cover)
| Item | Pass | Fail | N/A | Comment / follow-up |
|---|---|---|---|---|
| Penetrations through rated assemblies fire-stopped with the listed system | ||||
| Pipe, duct and conduit supported at the specified spacing | ||||
| Drain and vent lines sloped as specified | ||||
| Piping pressure-tested and the test recorded | ||||
| Ductwork sealed; fire and smoke dampers installed at rated walls with access | ||||
| Electrical boxes secured at the heights shown; conductors protected at framing | ||||
| Clearances to ceiling heights and other trades checked before close-in | ||||
| Required authority rough-in inspections passed and documented |
Sample rows are illustrative and marked for deletion. Your contract, drawings and specifications govern. Template from os.construction/resources/templates/inspection-checklist
Using the inspection checklist starter pack
- Copy the checklist that matches the work and delete items that don’t apply. Add the items your specs, drawings and inspector care about.
- Inspect before you call for the official inspection, with the responsible trade present if you can.
- Answer every item: Pass, Fail or N/A. A blank is not a pass.
- For every failure, write what is wrong, take a photo and name who will fix it by when.
- Re-inspect the failed items only, then sign and date the sheet.
- Keep the signed sheet with the day’s log: it is part of the job’s quality record.
- Checklist templateBuilt once per type of work
- Inspection scheduledLocation, date, point of contact
- Each item answeredPass, Fail or N/A
- Failures followed upObservation and photo, then punch if needed
- In reviewChecklist complete
- Signed and closedResponses locked
Text version
- Checklist template: Built once per type of work
- Inspection scheduled: Location, date, point of contact
- Each item answered: Pass, Fail or N/A
- Failures followed up: Observation and photo, then punch if needed
- In review: Checklist complete
- Signed and closed: Responses locked
Do this in os.construction instead of a spreadsheet
The Inspections tool in os.construction runs this as a template: sections and items with Pass/Fail, Yes/No, text or number responses, and an option to require a photo or an observation when an item fails. Inspections can recur daily, weekly, monthly or quarterly. A failed item creates a linked observation, which converts to a punch item, and signing an inspection locks its responses.
Try it on the sample project
Every trial workspace includes a sample project to run this workflow on. 14-day free trial. Pricing for paid plans isn't set yet.
Questions about the inspection checklist starter pack
Is this checklist enough to pass an authority inspection?
No. It is a starter for your own quality checks. Your drawings, specifications, the adopted code and the authority having jurisdiction decide what is required; add their items to the list.
What is the difference between Fail and N/A?
Fail means the item applies and is not acceptable yet. N/A means the item does not apply to this location. Keeping them separate stops “not checked” from hiding as “fine”.
What happens to a failed item?
It needs a record with an owner and a date. In os.construction a failed item creates an observation, and an observation can be converted to a punch item that is tracked to closed.
Can I schedule repeat inspections?
On paper, add a date column. In os.construction an inspection can recur daily, weekly, bi-weekly, monthly or quarterly, and Generate next occurrence creates the next one.
Can I reuse a checklist across projects in os.construction?
Templates are per project today.
Keep going
- GlossaryAudit Trail
- GlossaryCommissioning (Cx)
- GlossaryDaily Log
- GlossaryPunch List
- TemplatePunch list template
- TemplateMeeting minutes template
- TemplateT&M ticket template
- TemplateRFI writing checklist
- TemplateDaily log checklist
- TemplateChange event log
- TemplateThree-week look-ahead template
- TemplateSafety observation log
- TemplateAction item tracker
Keep exploring
Related across os.construction
- Free toolSafety observation logFree construction safety observation log.
- DocsObservations: log safety and quality issuesLog a safety, quality, commissioning or warranty observation, assign it, move it through review, and escalate it to an RFI or punch item when it needs one.
- ExplainerPunch list to closeout, on one recordFollow a deficiency from a failed inspection item to an observation, a punch item, review and sign-off, and see what closing punch means for retainage.
- PlatformCourse: run your first projectSeven 10-minute lessons on the sample project: RFIs, daily log, meetings, punch, changes and pay apps.
- PlatformProjectsRFIs, submittals, change orders and daily logs on the same record as the money.
- Free toolPunch list closeout calculatorWeeks to clear the punch list at your close and add rates, and the rate a target needs.