Free tools for the numbers that matter.
Retainage, over/under billing, change order markup, cost-to-complete, earned value, general conditions, markup vs margin, labor burden, bonding capacity, bond premium, bid bond, back charges, contingency drawdown and cash flow, plus punch list closeout, RFI response time and a critical path (CPM) calculator for the field, and generators for delivery method decisions, notices to proceed and closeout packages. The math every contractor runs every month, done right, with the formulas shown. No signup. Runs in your browser. Share any result with a link.
Pay application builder
G702/G703-style pay app: SOV, stored materials, retainage reductions, change orders, error checks, roll-forward, print and Excel export.
Open tool →Retainage calculator and ledger
Retainage this period, a ledger over the life of the job with reductions and release, carrying cost, and state retainage rules.
Open calculator →Over/under billing (WIP) calculator
Single-job over/under billing: cost-to-cost, units or physical %, pending COs, uninstalled materials and loss provision.
Open calculator →Change order markup calculator
Price a CO with burdened labor, tax, OH&P, tiered sub markup, insurance and bond, then track it in a CO log with exposure and aging.
Open calculator →Estimate at completion calculator
Five EAC methods side by side (CPI, CPI×SPI, budget-rate, weighted, PM ETC) with TCPI, sensitivity and a monthly trend.
Open calculator →Markup vs margin calculator
Convert markup to margin and back, price from a target margin, and see why 20% markup is not 20% margin.
Open calculator →Labor burden calculator
Fully burdened hourly cost: payroll taxes with wage caps, workers' comp, GL, benefits, fringe and PTO.
Open calculator →Bonding capacity calculator
Underwriter-style adjusted working capital and net worth, single-job and aggregate ranges, backlog utilization and what-if levers.
Open calculator →Bond premium calculator
Performance, payment and bid bond cost from your own surety’s tiered rate per $1,000: gross the premium into a bid and price change orders.
Open calculator →Construction cash flow projection calculator
Job and portfolio cash curves: billing lag, retainage, pay-when-paid, peak financing need, interest cost and scenario compare.
Open calculator →Punch list tracker and closeout forecaster
Import your punch log: open items by trade and age, a burn-down forecast with a confidence band, close rates each milestone needs, closeout checklist and Excel export.
Open calculator →RFI log analyzer and response time tracker
Import your RFI log: median and P90 turnaround in calendar or business days, on-time rate by party, ball-in-court aging, late RFIs with impact and an OAC report.
Open calculator →Critical path calculator
Enter activities with FS, SS, FF and SF logic and lags: forward and backward pass, total and free float, the critical path, a Gantt and a network diagram, with the math shown.
Open calculator →Earned value calculator
PV, EV and AC from budget and percent complete: CV, SV, CPI, SPI, three EAC formulas side by side, ETC, VAC and TCPI, with the math shown.
Open calculator →General conditions calculator
Staff, trailer, temp utilities and dumpsters by week, month or lump sum: total, weekly burn, share of contract and cost per extra week of delay.
Open calculator →Project delivery method selector
Eleven questions, transparent scoring: design-bid-build, CM at risk, design-build or IPD, with the points behind every answer, a comparison table and a decision memo to download.
Open tool →Bid bond calculator
Penal sum from a percentage, a fixed amount or the federal 20% rule, what you owe if you win and walk, and a withdrawal-risk check by stage, mistake type and state.
Open calculator →Notice to proceed generator
Full or limited NTP letter: commencement, contract time in calendar or working days (federal holidays skipped), completion dates, early-work caps and an acknowledgment. Word, text or print.
Open tool →Back charge calculator
Burdened labor, material, equipment and other trades, markup only where the subcontract allows it, the notice and cure timeline, and how much comes off the next payment.
Open calculator →Contingency drawdown tracker
Owner and contractor contingency against percent complete: burn index, straight-line chart, projection to completion, pending exposure and an Excel tracker with live formulas.
Open calculator →Closeout package checklist generator
Pick the building’s systems and contract terms and get its closeout package: TCO and CO readiness, Cx, as-builts, O&M, warranties and final payment, with due dates and an Excel checklist.
Open tool →WIP schedule workbench
Multi-job WIP schedule: over/under billing, fade vs prior, loss provisions, pending COs and surety ratios. Printable report and Excel with formulas.
Open tool →Bring your own job
Five numbers from one of your jobs, or your whole pasted WIP schedule, rendered on the os.construction dashboard: over/under billing, margin, fade risk. Runs in your browser.
Open tool →Migration planner
Phased plan to move onto one system: cutover off year-end and peak season, risks and exports.
Open tool →How connected is your stack?
10 questions, 3 minutes. Score your systems across five dimensions and get concrete next steps.
Take the assessment →Standard industry formulas (G702 retainage, cost-to-cost percent complete). Every tool shows its math.
Nothing you type leaves your browser. Inputs live in the URL only when you choose to share it.
Print a clean one-page summary for a PM meeting, an owner, or your bonding agent.