Bond premium calculator

Estimate what your performance and payment bonds will cost from your own surety’s rate schedule. Apply tiered rates band by band, gross the premium into a bid price, and see the extra premium a change order adds.

  • Free
  • No signup
  • Runs in your browser
  • Shareable link

Inputs

I want to
$
The bonded contract amount. Bond premium is normally charged on the full contract price.
$
Optional. Additive changes usually raise the bond amount and earn more premium.
Your surety’s rate schedule

Example, replace with your surety’s schedule. These bands and rates are placeholders so the tool works on load. They are not a quote and not an industry rate.

Band up toRate per $1,000
$
$
$
$
$
$
$
$
$
$
$
$
Bands run in order. Each rate applies only to the dollars inside its band. Clear a row to remove it; a blank limit means “and above”.
$
If your schedule has one.
$
What your surety charges per bid bond, if anything.

Estimated premiumLive

Performance and payment bond premium
$0
Effective rate
$0
per $1,000
With change orders
$0
Premium by band for this contract
Contract dollars in the bandBand not reached
    Band-by-band breakdown
    BandDollars in bandRate / $1,000Premium

    Example inputs: a $2,500,000 contract on an editable EXAMPLE rate schedule. The example tiers are placeholders, not any surety’s or the industry’s rates. Replace them with your surety’s schedule.

    Method

    How this is calculated

    Contract bond premiums are commonly quoted as a rate per $1,000 of contract price, often in bands. Each band’s rate applies only to the dollars that fall inside it, the same way tax brackets work. Every rate here is yours to set.

    Dollars in band k   = min(contract, upper limit k) − lower limit k   (if positive)
    Premium              = max(minimum premium, Σ dollars in band k ÷ 1,000 × rate k)
    Effective rate       = premium ÷ contract × 1,000
    
    Bid mode (premium charged on the full bid, which includes the premium):
    Bid including bond   = base bid + premium(bid including bond)      solved by iteration
    
    Change orders:
    Additional premium   = premium(contract + change orders) − premium(contract)

    Worked example (illustrative)

    On the example schedule, a $2,500,000 contract pays $25 per $1,000 on the first $100,000 ($2,500), $15 on the next $400,000 ($6,000) and $10 on the next $2,000,000 ($20,000), for $28,500 in total. That is an effective $11.40 per $1,000, or 1.14% of the contract. A $300,000 additive change order falls in the next band, at $7.50 per $1,000, and adds $2,250. Your surety’s numbers will differ.

    Premium is not the penal sum

    The penal sum is the most the surety can owe under the bond: commonly 100% of the contract for performance and payment bonds on public work, and a percentage of the bid for a bid bond (at least 20% on US federal bids that require one). The premium is what you pay the surety to issue it. What moves your rate is underwriting: financial statements, working capital, bonding capacity, track record and the job. Our guide to construction bonds covers each bond, and withdrawing a bid and your bid bond covers what a bid bond actually puts at risk. To size the bid bond itself and what you would owe if you walked away, use the bid bond calculator.

    How to estimate bond premium with this calculator

    1. Get your surety’s rate schedule. Ask your surety or bond broker for the premium schedule that applies to you: the dollar bands and the rate per $1,000 of contract price in each band, plus any minimum premium.
    2. Replace the example tiers. Enter the upper limit of each band and its rate per $1,000. Leave the last band’s limit blank so it covers everything above. Delete rows you do not need by clearing them.
    3. Enter the contract. Enter the contract price, or switch to bid mode and enter your bid before bond cost to gross the premium into the price.
    4. Add change orders. Enter approved change orders to see the additional premium the surety may bill on the increase.
    5. Read and export. Read the premium, the effective rate and the band-by-band breakdown, then download the CSV or print the summary for the estimate file.

    Bond cost questions

    How much does a performance bond cost?

    It depends on your surety’s rate schedule and your underwriting. Performance and payment bond premiums are usually quoted as a rate per $1,000 of contract price, often in bands where the rate falls as the contract gets larger, and one premium commonly covers both bonds. Your financial statements, experience, backlog and the job itself all affect the rate, so the only reliable number is the schedule your surety quotes you. This calculator applies that schedule.

    How much does a bid bond cost?

    Many sureties issue bid bonds to contractors with an established bond program at little or no separate charge, because the premium is earned on the performance and payment bonds if the bid wins. Others charge a flat fee. Ask your surety. The bid bond’s penal sum, such as 5 or 10 percent of the bid, or at least 20 percent on US federal work, is the most the surety could owe the owner; it is not the price of the bond.

    What is the difference between the bond premium and the penal sum?

    The penal sum is the maximum the surety can be liable for under the bond, usually set by the contract or solicitation as a percentage of the bid or contract price. The premium is what the contractor pays the surety for issuing the bond. A $5 million performance bond has a $5 million penal sum; its premium is a small fraction of that, set by your rate schedule.

    How does a tiered bond rate work?

    Each band of contract value has its own rate per $1,000, and each rate applies only to the dollars inside its band, like income tax brackets. With an example schedule of $25 per $1,000 on the first $100,000 and $15 on the next $400,000, a $300,000 contract costs $2,500 plus $3,000, or $5,500. The effective rate is the total premium divided by the contract price.

    Do change orders increase the bond premium?

    Usually, yes. When change orders increase the contract price, the bond amount generally increases with it and the surety bills additional premium on the increase, at the rate for the band the new dollars fall into. Deductive changes may earn a return of premium under some schedules. Check your bond and your surety’s practice.

    Should the bond premium be included in my bid?

    If the bid has to include the cost of bonds, yes, and remember the premium is charged on the final contract price, which itself includes the premium. Bid mode in this calculator solves for that: it finds the bid price at which your base price plus the premium on that full price adds up.

    Is bond premium refundable if the job is cancelled?

    Practice varies by surety and by why the job ended. Some return part of the premium on a deductive change or early cancellation; others treat the premium as fully earned once the bond is issued. Ask before you assume a refund.

    Sources

    Checked Nov 17, 2026. Federal rules set penal sums, not premiums. Premium rates come only from your surety; this page does not publish or assume any market rate.

    1. FAR 28.101-2: Solicitation provision or contract clause (bid guarantees), Acquisition.gov (checked Nov 17, 2026).Used for: federal bid guarantee of at least 20% of the bid price, not to exceed $3 million (the penal sum, not the premium).
    2. FAR 28.102-2: Amount required (performance and payment bonds), Acquisition.gov (checked Nov 17, 2026).Used for: federal performance and payment bond penal amounts of 100% of the original contract price unless the contracting officer sets otherwise.
    3. FAR 52.228-1: Bid Guarantee, Acquisition.gov (checked Nov 17, 2026).Used for: what the bid guarantee secures: executing the contract and furnishing bonds after award.
    4. Surety bonds (Surety Bond Guarantee program), U.S. Small Business Administration (checked Nov 12, 2026).Used for: SBA guarantee for bid, performance and payment bonds for small businesses, with its own guarantee fee on top of the surety premium.
    5. The Surety & Fidelity Association of America, SFAA (checked Nov 17, 2026).Used for: how contract surety bonds work and how premium differs from insurance pricing.

    When the spreadsheet version stops scaling

    Bonds follow your balance sheet and your WIP.

    The rate you get depends on how your surety reads your financials and your work in progress. In os.construction Accounting, WIP is computed from posted job cost, billings and approved PM forecasts and reviewed before it posts, so the schedule you send your surety ties to your books.

    • WIP snapshots with a calculation trace on every job, reviewed and posted (live).
    • Prime contracts and approved change orders on the same record as the budget (live).
    • Vendor bonding capacity recorded in prequalification (live).

    Stop re-keying the numbers behind this math.

    Project Financials tracks job costs and billing. The Accounting module includes reviewed WIP snapshots, posting and close. Learn the apps and review historical source coverage before a cutover.

    Your role (optional)

    Email gets you product updates: what shipped and what's next. Start a free trial → Founding program →

    More free tools

    Pay app builderG702/G703-style pay app: SOV, stored materials, retainage reductions, change orders, error checks, roll-forward, print and Excel export.RetainageRetainage this period, a ledger over the life of the job with reductions and release, carrying cost, and state retainage rules.Over/under billingSingle-job over/under billing: cost-to-cost, units or physical %, pending COs, uninstalled materials and loss provision.Change order markupPrice a CO with burdened labor, tax, OH&P, tiered sub markup, insurance and bond, then track it in a CO log with exposure and aging.Estimate at completionFive EAC methods side by side (CPI, CPI×SPI, budget-rate, weighted, PM ETC) with TCPI, sensitivity and a monthly trend.Markup vs marginConvert markup to margin and back, price from a target margin, and see why 20% markup is not 20% margin.Labor burdenFully burdened hourly cost: payroll taxes with wage caps, workers' comp, GL, benefits, fringe and PTO.Bonding capacityUnderwriter-style adjusted working capital and net worth, single-job and aggregate ranges, backlog utilization and what-if levers.Cash flow curveJob and portfolio cash curves: billing lag, retainage, pay-when-paid, peak financing need, interest cost and scenario compare.Punch list closeoutImport your punch log: open items by trade and age, a burn-down forecast with a confidence band, close rates each milestone needs, closeout checklist and Excel export.RFI response timeImport your RFI log: median and P90 turnaround in calendar or business days, on-time rate by party, ball-in-court aging, late RFIs with impact and an OAC report.Critical pathEnter activities with FS, SS, FF and SF logic and lags: forward and backward pass, total and free float, the critical path, a Gantt and a network diagram, with the math shown.Earned valuePV, EV and AC from budget and percent complete: CV, SV, CPI, SPI, three EAC formulas side by side, ETC, VAC and TCPI, with the math shown.General conditionsStaff, trailer, temp utilities and dumpsters by week, month or lump sum: total, weekly burn, share of contract and cost per extra week of delay.Delivery methodEleven questions, transparent scoring: design-bid-build, CM at risk, design-build or IPD, with the points behind every answer, a comparison table and a decision memo to download.Bid bondPenal sum from a percentage, a fixed amount or the federal 20% rule, what you owe if you win and walk, and a withdrawal-risk check by stage, mistake type and state.NTP generatorFull or limited NTP letter: commencement, contract time in calendar or working days (federal holidays skipped), completion dates, early-work caps and an acknowledgment. Word, text or print.Back chargeBurdened labor, material, equipment and other trades, markup only where the subcontract allows it, the notice and cure timeline, and how much comes off the next payment.ContingencyOwner and contractor contingency against percent complete: burn index, straight-line chart, projection to completion, pending exposure and an Excel tracker with live formulas.Closeout packagePick the building’s systems and contract terms and get its closeout package: TCO and CO readiness, Cx, as-builts, O&M, warranties and final payment, with due dates and an Excel checklist.WIP schedule workbenchMulti-job WIP schedule: over/under billing, fade vs prior, loss provisions, pending COs and surety ratios. Printable report and Excel with formulas.Bring your own jobFive numbers from one of your jobs, or your whole pasted WIP schedule, rendered on the os.construction dashboard: over/under billing, margin, fade risk. Runs in your browser.Migration plannerPhased plan to move onto one system: cutover off year-end and peak season, risks and exports.Stack assessment10 questions, 3 minutes. Score your systems across five dimensions and get concrete next steps.

    Ask the OS

    Reading this page

    Ask anything about this page. Answers use what you're reading as context.

    Suggested

      AI · may be imperfect · sample data where shown

      Open file