Bonding capacity estimator

A rough read on how much work a surety might support, from the two numbers they look at first: working capital and net worth. A starting point for the conversation with your agent, not an answer.

  • Free
  • No signup
  • Runs in your browser
  • Shareable link

Inputs

From your balance sheet
$
Current assets − current liabilities, from your year-end statement.
$
Total assets − total liabilities.
$
Receivables over 90 days, related-party or officer loans, prepaids, inventory of doubtful value. Taken off both.
$
Contract value left to earn on bonded and unbonded work, from your WIP schedule.
Rule-of-thumb multiples
×
×
Common heuristics run about 10× working capital and 10× net worth, stretching toward 15–20× for strong, CPA-audited accounts with a long track record, and lower for new or thinly capitalized ones.
%
Sureties often cap one job well below the aggregate program and compare it to the largest job you've completed.

Rough estimateLive

Aggregate program
$0
Single job
$0
Room for new work
$0
Capacity by working capital and by net worth, with current backlog marked
Lower test (sets the estimate)Higher testBacklog

Sample inputs (illustrative): $1.2M working capital, $2.5M net worth, $7.5M of uncompleted backlog, 10× multiples.

Method

How this is calculated

This is the back-of-envelope math contractors and agents use before underwriting starts. It is not how a surety decides.

Adjusted working capital = working capital − discounted assets
Adjusted net worth       = net worth − discounted assets

By working capital = adjusted working capital × WC multiple
By net worth       = adjusted net worth × NW multiple
Aggregate program  = the lower of the two
Single job         = aggregate × single-job %
Room for new work  = aggregate − uncompleted backlog
Next job, roughly  = the lower of single job and room for new work

What sureties actually underwrite

Underwriters talk about the three Cs: character (integrity, references, claims and payment history), capacity (experience with this size and type of work, key people, equipment, a continuity plan) and capital (working capital, net worth, bank line, profitability). On top of that they read:

  • Quality of financial statements. CPA-reviewed statements at minimum for larger programs, audited for the largest. Compiled statements usually mean a smaller program.
  • Your WIP schedule. Margin fade, underbillings and jobs that lose money between statements weigh heavily.
  • Banking and credit. An unsecured or lightly secured line of credit, its usage and covenants.
  • Indemnity. Personal and corporate indemnity, and the owners' outside net worth.
  • Job specifics. Contract terms, owner, duration, location, scope outside your normal work, and the largest job you've completed successfully.

Ways contractors grow capacity

Retain earnings instead of distributing them, collect old receivables, move officer loans off the balance sheet, keep a clean WIP with honest percent-complete, and upgrade statements from compiled to reviewed. Talk to a surety agent who specializes in construction before you bid a job near your limit.

Multiples vary by surety, market cycle and account. Treat every number on this page as a rough estimate only.

Stop re-keying the numbers behind this math.

Project Financials tracks job costs and billing. Company Accounting is available for evaluation; certified WIP posting and close are not yet available.

Your role (optional)

Email gets you product updates: what shipped and what's next. Start a free trial → Founding program →

More free tools

RetainageRetainage held, payment due this period and balance to finish, G702 style.Over/under billingCost-to-cost % complete, earned revenue and over/under billing. Single job or a mini WIP schedule.Change order markupPrice a CO: OH&P, tiered sub markup, insurance and bond, with a waterfall.Estimate at completionEAC, cost-to-complete, budget variance and margin fade from where the job is today.Markup vs marginConvert markup to margin and back, price from a target margin, and see why 20% markup is not 20% margin.Labor burdenFully burdened hourly cost: payroll taxes with wage caps, workers' comp, GL, benefits, fringe and PTO.Cash flow curveS-curve billings, retainage and pay-when-paid lag to monthly cash in, cash out and peak cash need.Punch list closeoutWeeks to clear the punch list at your real close and add rates, and the weekly close rate a target date needs.RFI response timePaste your RFI log: median and average turnaround, share answered within the contract period, and open RFIs already late.WIP report generatorDrop in a CSV of jobs, get a print-ready WIP report: over/under billing, margin, backlog, loss jobs. Runs in your browser.Bring your own jobFive numbers from one of your jobs, or your whole pasted WIP schedule, rendered on the os.construction dashboard: over/under billing, margin, fade risk. Runs in your browser.Migration plannerPhased plan to move onto one system: cutover off year-end and peak season, risks and exports.Stack assessment10 questions, 3 minutes. Score your systems across five dimensions and get concrete next steps.

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file