Bid bond calculator

Work out the bid bond penal sum the bid documents require, what the owner could recover if you won and walked away, and how risky it is to withdraw your bid at each stage. For the premium on your performance and payment bonds, use the bond premium calculator.

  • Free
  • No signup
  • Runs in your browser
  • Shareable link

Bid and bond

$
Bond requirement
%
From the instructions to bidders.
$
0 = no cap.
Bond form
Read the bond and the bid documents. Many private and local forms pay the difference to the next bidder; some statutes and solicitations forfeit the whole bid security.
If you won and walked away
$
$
Rebid, delay, admin.

Bid bondLive

Penal sum
$0
Gap to next bid
$0
Surety would pay
$0
Owner’s loss if you walk
$0
gap + re-procurement
Your total exposure
$0
Owner’s loss compared with the penal sum
Paid by the surety (then recovered from you)Above the bond: may be owed directlyPenal sum not used

    Withdrawal check: will you lose your bid bond?Live

    When would you withdraw?
    Why?
    Clerical: a dropped line, an addition error, a transposed figure. Judgment: underestimated productivity, misread plans, a price that went up.
    Notice

      General information, not legal advice. The solicitation, the bond form and the law where the project is decide. The full explanation, with the federal rule and state statutes, is in Will you lose your bid bond if you withdraw your bid?

      Example inputs: a $4,200,000 bid with a 10% bid bond, a difference-type bond form, and a next-lowest bid of $4,515,000.

      Method

      How this is calculated

      The penal sum comes from the bid documents. What you could owe if you walk away after award depends on the bond form and on how far your bid was below the next one.

      Penal sum            = bid × required %   (capped if the documents set a cap)
                           = fixed amount        (if the documents state one)
                           = min(20% × bid, $3,000,000)   (US federal, FAR 28.101-2)
      
      Owner's loss         = max(0, next-lowest bid − your bid) + re-procurement cost
      Surety pays          = min(penal sum, owner's loss)        difference bond
                           = penal sum                            forfeiture bond
      Above the bond       = owner's loss − penal sum             difference bond, if positive
      Your exposure        = surety payment (recovered from you under the indemnity agreement) + above the bond

      Worked example

      A $4,200,000 bid with a 10% bid bond has a $420,000 penal sum. The next bid is $4,515,000, so the gap is $315,000 (7.5% of your bid). With $15,000 to re-procure, the owner’s loss is $330,000, under the penal sum: the surety pays $330,000 and looks to you to repay it. Under a forfeiture form the whole $420,000 would be at stake. On a federal job the same bid needs a guarantee of at least $840,000.

      A big gap is a warning

      If your bid is well below the next one, check your recap for a dropped line or an extension error before you do anything else. That is exactly the kind of mistake the bid bond rules give relief for, and only if you report it quickly. Our guide to construction bonds covers bid, performance and payment bonds, and the bonding capacity calculator shows whether the job fits your program.

      How to calculate a bid bond and the risk of withdrawing

      1. Enter your bid. Type the total bid price the bond secures.
      2. Set the bond requirement. Pick a percentage of the bid (5% and 10% are common on public work), a fixed dollar amount from the bid documents, or the US federal rule of at least 20% capped at $3 million.
      3. Pick the bond form. A difference bond pays the owner’s actual loss up to the penal sum; a forfeiture bond pays the whole penal sum. Read your bond and the instructions to bidders.
      4. Add the next-lowest bid. Enter the second bid and any re-procurement cost to see what the owner could claim if you walked away after award.
      5. Check the withdrawal risk. Answer four questions about when and why you might withdraw to see the risk level, the deadline that applies and what to do first.

      Bid bond questions

      What is a bid bond penal sum?

      The most the surety can owe the owner under the bid bond. It is set by the bid documents, usually as a percentage of the bid (5% or 10% is common on state and local work) or a fixed amount. On US federal contracts the bid guarantee must be at least 20% of the bid price, but not more than $3 million (FAR 28.101-2).

      How much does a bid bond cost?

      Often little or nothing separately for a contractor with an established bond program, because the surety earns its premium on the performance and payment bonds if the bid wins. Some sureties charge a flat fee per bid bond. The penal sum is not the cost. For premium on the final bonds, use the bond premium calculator.

      What happens if you win and refuse to sign?

      The owner can claim on the bid bond. Under a difference bond the surety pays the extra cost of awarding to the next bidder, up to the penal sum. On federal work the bidder is liable for any cost of acquiring the work above its bid, and the bid guarantee offsets that (FAR 52.228-1). Either way your surety will look to you to repay it under your indemnity agreement.

      Will I lose my bid bond if I withdraw my bid?

      Usually not before the bid opening deadline, if you withdraw by the method the solicitation allows. After opening, the bid is usually firm for the acceptance period; withdrawal is generally allowed only for a provable clerical mistake reported quickly. The withdrawal check on this page walks through it, and our full article covers the federal rule and state statutes.

      Is the surety’s payment the end of it?

      No. Contractors sign a general indemnity agreement with their surety, so what the surety pays the owner is normally recovered from the contractor, and the claim can affect your bonding program. Under a difference bond the owner may also pursue losses above the penal sum directly.

      Sources

      Checked Nov 21, 2026. State deadlines shown are examples summarized from the statute text; other states, cities and owners set their own rules. Re-check the current statute and your solicitation before relying on them.

      1. FAR 28.101-2: Solicitation provision or contract clause (bid guarantees), Acquisition.gov (checked Nov 21, 2026).Used for: federal bid guarantee: at least 20% of the bid price, not to exceed $3 million.
      2. FAR 52.228-1: Bid Guarantee, Acquisition.gov (checked Nov 17, 2026).Used for: failure to sign or furnish bonds; liability for excess cost of acquiring the work, offset by the guarantee.
      3. FAR Part 14 (14.303 modification or withdrawal of bids; 14.407 mistakes in bids), Acquisition.gov (checked Nov 17, 2026).Used for: withdrawal before opening; correction or withdrawal for mistakes after opening.
      4. Cal. Public Contract Code § 5103, California Legislature (via public.law) (checked Nov 17, 2026).Used for: relief for a mistake in a bid: written notice within 5 working days after opening.
      5. N.Y. General Municipal Law § 103, New York State Senate (checked Nov 17, 2026).Used for: withdrawal for an arithmetic error or omission: before award or within 3 days after opening.
      6. 73 P.S. § 1602, Pennsylvania (via FindLaw) (checked Nov 17, 2026).Used for: withdrawal for a clerical error: written claim within 2 business days after opening.

      When the spreadsheet version stops scaling

      Bonding follows your WIP and your balance sheet.

      Your surety prices and sizes your program from your financial statements and work in progress. In os.construction Accounting, WIP is computed from posted job cost, billings and approved forecasts and reviewed before it posts, and vendor bonding capacity is recorded in prequalification.

      • WIP snapshots with a calculation trace on every job (live).
      • Vendor prequalification questionnaires, including bonding capacity (live).
      • Bid packages with award review and a draft commitment from the winning quote (live).

      Stop re-keying the numbers behind this math.

      Project Financials tracks job costs and billing. The Accounting module includes reviewed WIP snapshots, posting and close. Learn the apps and review historical source coverage before a cutover.

      Your role (optional)

      Email gets you product updates: what shipped and what's next. Start a free trial → Founding program →

      More free tools

      Pay app builderG702/G703-style pay app: SOV, stored materials, retainage reductions, change orders, error checks, roll-forward, print and Excel export.RetainageRetainage this period, a ledger over the life of the job with reductions and release, carrying cost, and state retainage rules.Over/under billingSingle-job over/under billing: cost-to-cost, units or physical %, pending COs, uninstalled materials and loss provision.Change order markupPrice a CO with burdened labor, tax, OH&P, tiered sub markup, insurance and bond, then track it in a CO log with exposure and aging.Estimate at completionFive EAC methods side by side (CPI, CPI×SPI, budget-rate, weighted, PM ETC) with TCPI, sensitivity and a monthly trend.Markup vs marginConvert markup to margin and back, price from a target margin, and see why 20% markup is not 20% margin.Labor burdenFully burdened hourly cost: payroll taxes with wage caps, workers' comp, GL, benefits, fringe and PTO.Bonding capacityUnderwriter-style adjusted working capital and net worth, single-job and aggregate ranges, backlog utilization and what-if levers.Bond premiumPerformance, payment and bid bond cost from your own surety’s tiered rate per $1,000: gross the premium into a bid and price change orders.Cash flow curveJob and portfolio cash curves: billing lag, retainage, pay-when-paid, peak financing need, interest cost and scenario compare.Punch list closeoutImport your punch log: open items by trade and age, a burn-down forecast with a confidence band, close rates each milestone needs, closeout checklist and Excel export.RFI response timeImport your RFI log: median and P90 turnaround in calendar or business days, on-time rate by party, ball-in-court aging, late RFIs with impact and an OAC report.Critical pathEnter activities with FS, SS, FF and SF logic and lags: forward and backward pass, total and free float, the critical path, a Gantt and a network diagram, with the math shown.Earned valuePV, EV and AC from budget and percent complete: CV, SV, CPI, SPI, three EAC formulas side by side, ETC, VAC and TCPI, with the math shown.General conditionsStaff, trailer, temp utilities and dumpsters by week, month or lump sum: total, weekly burn, share of contract and cost per extra week of delay.Delivery methodEleven questions, transparent scoring: design-bid-build, CM at risk, design-build or IPD, with the points behind every answer, a comparison table and a decision memo to download.NTP generatorFull or limited NTP letter: commencement, contract time in calendar or working days (federal holidays skipped), completion dates, early-work caps and an acknowledgment. Word, text or print.Back chargeBurdened labor, material, equipment and other trades, markup only where the subcontract allows it, the notice and cure timeline, and how much comes off the next payment.ContingencyOwner and contractor contingency against percent complete: burn index, straight-line chart, projection to completion, pending exposure and an Excel tracker with live formulas.Closeout packagePick the building’s systems and contract terms and get its closeout package: TCO and CO readiness, Cx, as-builts, O&M, warranties and final payment, with due dates and an Excel checklist.WIP schedule workbenchMulti-job WIP schedule: over/under billing, fade vs prior, loss provisions, pending COs and surety ratios. Printable report and Excel with formulas.Bring your own jobFive numbers from one of your jobs, or your whole pasted WIP schedule, rendered on the os.construction dashboard: over/under billing, margin, fade risk. Runs in your browser.Migration plannerPhased plan to move onto one system: cutover off year-end and peak season, risks and exports.Stack assessment10 questions, 3 minutes. Score your systems across five dimensions and get concrete next steps.

      Ask the OS

      Reading this page

      Ask anything about this page. Answers use what you're reading as context.

      Suggested

        AI · may be imperfect · sample data where shown

        Open file