Transmittals
Send a formal cover sheet listing what you're handing over and why, pin the exact document versions and drawing revisions it covers, and track which recipients have recorded receipt.
On this page
A transmittal is the project’s record of what was handed to whom, how it was sent and what they’re asked to do with it. The Transmittals tool keeps the log, the cover sheet for each one, and a receipt for each recipient. Open Transmittals from the project’s Project Tools menu.
The transmittal log
The log lists Number, Subject, Date, To, From, Submitted For and Sent Via. The counters across the top filter it: All, For approval, Attached and Sent by me. Filter by Sent Via or Submitted For, sort by number or date, and save a filter set as a view.
The buttons at the top are Receipt follow-up, Create from Documents & Drawings and + Create.
Create a transmittal
Use + Create for a transmittal you describe by hand, for example samples or prints sent by courier.
-
General Information
The Number is filled in with the next number in the log; you can change it. Enter the Subject and Date. Check Private to limit who can see it.
-
Recipients
Under To and CC, choose people from Select A Person…. Add All adds everyone on the list and Remove All clears it. The × next to a name removes that person.
-
How and why
Choose Sent Via (Attached or Under Separate Cover) and Submitted For (Approval, Your Use, As Requested, Review and Comment or Further Processing). Under Action As Noted, check any of the 12 actions, such as Approved as Noted or Returned for Corrections. Due By and Sent date each take a date.
-
Items
Pick a format from Select an Item: to add a row, then fill in its Description, Date and # Copies. Formats include Document, Plans, Prints, Shop Drawings, Samples, RFI, Submittal Package and more.
-
Comments and save
Add Comments, then click Create. Create and Record Email creates it and also records an email for it.
Send exact document versions and drawing revisions
When the transmittal covers files that live in the app, attach them so the record shows exactly which version went out.
-
Open the composer
Click Create from Documents & Drawings.
-
Choose the sources
Under Source Items, pick from Documents (Select a document…) and Drawings (Select a drawing…). Each option is one specific document version or drawing revision. Items marked “Metadata only” have no stored original file.
-
Add details
Enter a Subject (it’s generated for you if you leave it blank), choose Recipients, and add Comments.
-
Create it
Click Generate Transmittal, or Create and Record Email.
Each selected version is pinned to the transmittal. If someone uploads a newer version later, the transmittal still points at the one you sent.
You can also start from Documents. Click Select version N for transmittal on up to 20 files (one version each, current or from Version History), then Prepare transmittal. The composer opens with those versions already chosen. See Document review and markup.
Adding someone as a recipient doesn’t give them access to the files. They need their own access to Documents or Drawings to open the sources.
The cover sheet
Open a transmittal to see its cover sheet: company and project, number and date, Subject, To, From and CC, Sent Via, Submitted For, the Action As Noted checklist, Items and Remarks. For items that came from Documents or Drawings, the Source column links to the exact Document or Drawing version, with Download original when a file is stored.
Badges in the header show the status (or Email recorded locally), Private, and how many recipients have received it, for example 1/3 received. The side panels show Recipient Receipts, the Record (number, creator, created date, private) and Change History.
Record receipt
Each To recipient gets a row under Recipient Receipts. When the package arrives, the recipient opens the transmittal and clicks Mark Received next to their name; it changes to Received with the date. Clicking it again removes the receipt. A Transmittals admin can mark receipt for any recipient. CC recipients don’t get receipt rows.
Receipt in the app is a record that the person says they have it. It isn’t approval or acknowledgment, and it isn’t proof of delivery.
Follow up on receipts
Receipt follow-up shows transmittals still waiting on receipts, in two views:
- My pending receipt: transmittals where you’re a To recipient and haven’t recorded receipt.
- Sent by me awaiting receipts: transmittals you sent where at least one To recipient hasn’t, with their names.
Search by Number or subject. Each row shows who it’s From, the Pending receipt, the Transmittal due date (from Due By, flagged Past transmittal due date the day after it passes) and whether an email was recorded. This view doesn’t send reminders; open the transmittal or contact the person to follow up.
Edit, delete and restore
Edit opens the same form as + Create, with Save Changes. You can edit a transmittal you sent if you have Standard access, or any transmittal with Admin access. Delete (Admin) moves it to the Recycle Bin tab, where Restore brings it back. Admins can also select several rows in the log and delete them together.
Keep exploring
Related across os.construction
- GlossaryTransmittalA cover record that lists exactly which documents, drawings or samples were sent, to whom, when, how and for what purpose.
- GlossaryArchitect's Supplemental Instructions (ASI)AIA G710 Architect's Supplemental Instructions (ASI): the architect's written instruction that clarifies the contract documents or orders a minor change with no change in contract sum or time.
- DocsDocuments and drawingsStore project files in Documents with folders, versions, check-out and folder permissions. Manage drawing revisions and sets, mark up sheets, compare revisions, and keep the spec book in Specifications.
- DocsAnalytics BI guideGet started with Analytics, build a dashboard from the metric catalog, read the CRM & Pipeline pack, share and schedule results, and understand exactly which rows each person sees.
- Free toolASI log templateFree ASI log and ASI form template.
- Blogos.construction is open for trialsThe app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
Was this helpful?