Labor, equipment and materials
Record crew hours and approve timesheets, plan who works where each week, dispatch and maintain equipment, and track materials from delivery to stock and the accounting receipt.
On this page
Four project tools cover the people, machines and material on a job: Timesheets, Workforce Planning, Equipment and Materials. Open each from the project’s Project Tools menu. Hours on T&M work go on T&M tickets, and the day’s crew counts go in the Daily log.
Timesheets
Timesheets records hours by worker and cost code, and routes each timesheet for approval.
Pick the period
Switch between Day and Week, step with ← Previous Day / Next Day → (or Previous Week / Next Week), or jump to a date. The tiles total Total Hours, Overtime and Entries for the period, and show how many timesheets are Awaiting review and how many are approved (Timesheets Approved).
Enter hours
In Timecard Entries, pick the Worker and Cost Code, enter the Classification (for example Carpenter), Hours, OT hours and location, mark it Billable if it is, and click Add Entry. In week view, Crew × Day shows each worker’s hours across the week, and Hours by Cost Code totals the period by code.
Approve a timesheet
-
Submit
In Timesheet Approval, click Submit for Review. The ball in court moves to the reviewer.
-
Review
A reviewer with admin access to Timesheets clicks Approve, or enters a Reason and clicks Reject. A rejected timesheet goes back to the submitter, who fixes it and clicks Resubmit.
-
Change an approved timesheet
Approved entries are locked. Reopen the timesheet to add or change entries, then submit it again.
Filter the approval panel by approval status to see what’s waiting.
Workforce Planning
Workforce Planning shows who is assigned where, week by week. It has Allocation, People and Crews sections. People and crews belong to the company, so the same roster is used across projects.
Set up people and crews
- People: + Add Person with First Name, Last Name, Trade / Role, Status, Employee ID, Hourly Rate ($), Email and Phone. Open a person’s Daily availability to record which days they’re available.
- Crews: + Add Crew with a Crew Name, Description, Crew Lead and Members.
Plan the week
The Allocation view shows Who’s Where This Week, with tiles for Resources, Assignments, Confirmed and Pending. Move between weeks with Previous week and Next week.
-
Assign
Click + Assign, pick the Person or Crew, the Start Day and End Day, a Role / Category, Hours / Day and Notes.
-
Set the state
Choose the State: Pending (awaiting confirmation), Confirmed, Completed or Canceled.
Equipment
Equipment tracks the company’s machines and tools: where each one is, its rates, and its service and inspection history. Tabs: Company Catalog, Project Equipment and Recycle Bin. Tiles count Units, Available, In use and In the shop.
Add equipment
Click + Create and fill in:
- Identification: Name, Category, Make, Model, Type, Year, Serial Number and Asset / Identification Number.
- Status & Ownership: Status (Available, In Use or Under Maintenance), Ownership (Owned or Rented), Hourly Rate ($), Standby Rate ($), Location and Supplier (Vendor).
- Visible company-wide (across all projects), to show it in every project’s catalog.
Click Create Equipment.
Dispatch, service and inspect
On a piece of equipment:
- Dispatch to a Project: pick the Project, Start Date, End Date and notes, then Dispatch. Assignment History lists every dispatch; complete or edit an assignment there.
- Maintenance Log: Add Maintenance Record with the Date, Type, Hours at Service, Performed By, Cost ($), Next Service Date and Description.
- Inspections: Create Project Inspection starts an inspection in the Inspections tool for this equipment. Quick checks go under Local Equipment Checks with Add Inspection (Inspection Date, Inspector, Result and Inspection Notes).
- Mark Available and Send to Maintenance change its status. On the list, select units to Mark Available, Mark Under Maintenance or Delete.
Materials
Materials keeps a catalog of the project’s materials with on-hand stock, the deliveries that arrive, and the review that turns a delivery into an accounting receipt. Tabs: Catalog, Deliveries and Receipt reviews.
Build the catalog
Click + Create Material and enter Name, Description, Unit of Measure, Category, Cost Code, Unit Cost, Opening On-Hand Qty and Status. On a material, the Stock card shows on-hand quantity and stock value; use Adjust by with a note to correct the count. Delivery History lists every delivery of that material.
Record a delivery
-
Enter it
On Deliveries, click + Record Delivery and enter the Delivery Date, Delivery Status (Pending or Received), Supplier, Tracking Number, the Commitment (PO or subcontract) it was bought on, and the line items with material, quantity and unit cost. Add notes.
-
Receive it
When it’s on site, click Mark received on the delivery. Receiving adds the quantities to on-hand stock; Return to pending takes them back out.
Review a delivery for the AP receipt
When a delivery is tied to a purchase order, the delivery shows Review field quantities for AP receipt. This sends what the field received to accounting:
-
Submit field evidence
For every delivery line, enter the Accepted quantity in the purchase order’s unit, pick the Purchase order line, and give a Damage, rejection or exception reason for anything not accepted (choose No accepted quantity for a line with none). Click Submit receipt review.
-
A different person decides
Someone else with accounting receipt authority enters a Review reason and clicks Accept and record AP receipt or Return for correction. Acceptance records the receipt against the purchase order and rechecks invoice matching. It doesn’t pay a bill.
The Receipt reviews tab lists the reviews awaiting your decision. After acceptance, View accounting receipts opens the receipts in Accounting. See Purchase requests and expenses and Commitments.
Keep exploring
Related across os.construction
- DocsProjects and the record modelHow a job is structured in os.construction, what a record is, which record types the app has, and how links between RFIs, change events, change orders and pay apps keep the story connected.
- GlossaryCommitmentA contractual obligation to spend money, such as a subcontract or purchase order, tracked against the budget before any invoice arrives.
- GlossaryPurchase orderA document issued to a supplier that authorizes a purchase of materials, equipment or services at agreed quantities and prices.
- DocsAccounts PayableSubcontractor-ready AP: a bill capture inbox and vendor portal, retainage, lien waiver and COI payment holds, joint checks, NACHA, positive pay, virtual cards, remittance advice and 1099 outputs.
- ExplainerFind anything: search, open items and ball in courtHow os.construction finds records across tools: Spotlight and the search page, My Open Items, and the ball in court rules for each tool.
- BlogBack charges: how to issue, dispute and document themA back charge is a deduction a contractor takes from a subcontractor or supplier for cost they caused. It sticks when the subcontract allows it, notice and a chance to cure came first, and the cost is documented. Here is how to issue one, how to dispute one, and the paper trail both sides need.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →