General Ledger
Trace any balance to the posted lines and source records behind it, with opening and running balances.
General Ledger is the read view of everything that has posted. Pick an account and a date range to see each line in posting order, with the opening balance, a running balance and the closing balance, and follow any line back to the document that created it. Open it from the company app launcher under Accounting > General Ledger; it appears when your accounting access includes it.
- Who uses it
- Controllers, accountants, auditors and anyone with ledger view access.
- When
- Account analysis, tie-outs and audit requests; before signing off a close.
- What it holds
- Posted journal lines with account, entity, dimensions, journal, source type and the source record reference.
Key workflow
- Choose the account and range. The range defaults to the start of the fiscal year through today. Choosing an account adds the opening balance, a running balance on every line and the closing balance.
- Narrow it down. Filter by entity, project and other dimensions to answer a specific question, such as what was charged to one job on one account.
- Open the source. Every posted line records the journal and source that created it, so you can open the bill, receipt, pay run, depreciation run or manual entry behind the number.
- Export for review. Run the GL detail report from Financial Reports to export the same lines to CSV, XLSX or PDF.
Controls
- Read-only: the ledger changes only through posting workflows in the other apps.
- Entity scope applies. A user limited to some entities sees only their lines, and project-scoped grants are refused for entity-wide views.
- Large variances get explained. Flux analysis in Fiscal Periods compares each account’s posted balance or activity with the prior period, prior year and approved budget, and a second person reviews each explanation above threshold; a later posting makes that review stale.
- Measured at scale. On a synthetic ledger of 3.35 million lines, the GL close-integrity check (ledger checks and source digests) took about 1.4 s median and 1.5 s at the 95th percentile, under a 2-second gate. Posting with eight concurrent writers in one company held the 95th percentile under 200 ms at about 46 journals a second; postings within one company are serialized by design, and two companies post in parallel. These were measured on a shared development machine and are not a production capacity claim.
Current boundaries
For the full procedure, exceptions and examples, read the General ledger and journals workflow guide.
API operations
1 operations · 1 read · 0 write · base path /rest/v1.0/companies/{company_id}/accounting
Parameters, request and response fields, errors and a generated example for each operation are in the REST reference for this app. Read scopes, step-up and permissions in the Accounting API guide.
Keep exploring
Related across os.construction
- GlossaryMACRSThe Modified Accelerated Cost Recovery System, the US tax depreciation method that assigns assets to recovery periods and depreciates them on IRS percentage tables.
- GlossaryReversing entryA journal entry that exactly mirrors an earlier one, swapping debits and credits, to cancel it or to undo an accrual in the next period.
- DocsGeneral ledger and journal entriesEnter, approve, post and reverse company journal entries.
- DocsFixed assets and equipmentTrack company assets and review depreciation runs.
- BlogHow to close the month in construction accounting: a step list from cutoff to lockA construction month-end close gets every cost and every billing into the right month, proves cash and the subledgers against the ledger, updates the WIP schedule from current cost-to-complete, has someone else review it, and then locks the period. Here is the step list, an example close calendar and a worked example of what one late invoice does to WIP.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →