Closeout and retainage release

How closeout requirements are planned to attach to each subcontract at buyout, collect through the job, and gate retainage release on both the owner side and the sub side.

Planned

This is on the roadmap and not built yet.

On this page

Closeout is the last phase of a job: punch list finished, documents delivered, final payments and lien waivers exchanged, and the job closed financially. It’s also when retainage is released, which on many jobs is a large share of the profit. This page explains how we plan to treat closeout as a list that starts at buyout, so retainage isn’t waiting on a hunt at the end. Today the app has the Punch List, Project Archive, and retainage on pay apps and sub invoices (including retainage released on a pay app). Closeout requirements and release gating are Planned.

Closeout requirements

A closeout requirement is one deliverable owed by one party: an O&M manual from the mechanical sub, a roofing warranty, attic stock from the flooring supplier, a final lien waiver. Each requirement has:

Field Example
Owed by Summit Mechanical (subcontract)
Deliverable O&M manual, spec 23 05 00, digital and two printed copies
Source Prime contract Division 01, subcontract exhibit
Linked records Submittals for the equipment it covers
Due point With product submittal, at startup, or before final completion
Status Not started, requested, received, accepted, rejected

Requirements come from the prime contract and specs, and are pushed down into each subcontract at buyout. A sub’s own retainage release can be tied to their requirements being accepted.

How a requirement moves

  1. Created at buyout

    Planned: when a subcontract is written, its closeout requirements are generated from the spec sections in its scope and added to the subcontract exhibit. Equipment in the submittal register becomes O&M and warranty requirements automatically.

  2. Collected during the job

    O&M data is requested with the product submittal. Warranty letters are requested at system startup. As-builts are checked monthly before the pay app. Each upload is linked to its requirement.

  3. Reviewed and accepted

    The PM accepts or rejects each deliverable. Rejections go back to the sub with a reason.

  4. Rolled up for the owner

    At substantial completion, the closeout package is assembled from accepted requirements, in the order the specs ask for.

  5. Gates retainage

    The retainage release checklist shows which requirements are still open, by party.

Two milestones

The owner can use the building for its intended purpose, often documented on a certificate (for example AIA G704) with a punch list attached. Commonly starts warranties and, on many contracts, allows a partial retainage release. Planned: substantial completion as a dated event on the job, which sets warranty start dates on the related requirements and makes the partial release billable if the contract allows it.

Punch list complete and every closeout document delivered. Usually releases the remaining retainage and the final payment, against final lien waivers, contractor affidavits (for example AIA G706 and G706A) and, on bonded work, consent of surety (for example AIA G707). The final pay app checklist lists every open item before it can be submitted.

Retainage release in both directions

Retainage moves twice at closeout: the owner releases yours, and you release your subs’.

Sample data · Riverside Medical Center, Job #24-118
  • Owner side. A retainage release is billed as its own application or line, against the retainage receivable balance on the job. The balance is the sum of retainage on every approved pay app, less releases, so it always ties.
  • Sub side. Each subcontract carries its retainage payable, linked to the sub pay apps it came from. A sub’s release becomes eligible when their requirements are accepted and, if your subcontract says so, when the owner has released the matching retainage to you.
  • Early release. Trades that finish early can be released early where the contract allows. The release is recorded against that sub only.

Closing the job financially

The job is closed when every commitment is closed with final change orders and back-charges settled, every cost is in, the final WIP row shows actual margin, and warranty obligations are noted. Closing the job moves it to the completed-jobs schedule your surety reads. See WIP and over/under billing.

Related: Pay apps, SOV and retainage, Lien waiver tracking, Subcontracts and commitment changes. Glossary: closeout, retainage release. Try the retainage calculator.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file