Data / Importing from your current stack

Importing from your current stack

Bring project records into Migration and establish company books through reviewed Accounting imports for master data, open AP/AR, opening balances, journals and payroll YTD.

On this page

Want a dated plan for your own company? Try the free migration planner.

Nobody switches construction software by starting over. You have open jobs, a directory of subs and vendors, open RFIs and contracts half billed. This page covers the project import tool in the app today and the other ways data comes in: Accounting Imports, schedule files and CRM contacts. For the click-by-click steps, see Run an import; for the whole plan in order, see the Migration guide.

The import tool

Company admins open the Migration page (app.os.construction/companies/<your company>/migration), connect a source, choose a target project and pick what to bring over. A dry run counts what would be imported without writing anything. A live run writes the records into the project.

  • One project at a time. Each import job reads one source project into one os.construction project.

  • Safe to re-run. Each imported item remembers its source ID, so running the same job again updates the records it already created instead of duplicating them.

  • Failures don’t stop the run. A record that fails is counted and logged with the reason; the rest carry on.

  • Your source credentials aren’t stored. You paste an access token when you run the job; it is used for that run only.

  • Re-run the same job. The link between source and imported records belongs to the job, so a second job into the same project would create duplicates.

Today the tool connects to one project management system’s API. Tell us what you run and we’ll confirm whether it’s supported. There’s also a mock source (Use mock data), so you can try a dry run or a live run on a test project without any credentials.

What comes over

Scope Lands in os.construction as
Directory (users and vendors) People and companies in the project Directory
RFIs RFIs
Submittals Submittals
Punch List Punch items
Observations Observations
Daily Log (weather, manpower, notes) Daily log entries
Documents (folders and files) Folders and files in Documents
Prime Contracts Prime contracts
Commitments Subcontracts and purchase orders

The directory is imported first, so everything else can point at the right people and companies.

Project import boundaries and accounting imports

Source data Status
Project cost codes and budgets Not in the import tool. Set up cost codes in the project’s Admin tool → Cost Codes, or start the project from a template project, and enter budgets in the Budget tool.
Change events and owner change orders Not in the import tool (Planned). Enter open items in the project.
Drawings, specifications, photos Not in the import tool. Upload them in the project’s Drawings, Specifications and Photos tools.
Schedules Import Primavera P6 XER, P6 XML or Microsoft Project XML in the project’s Schedule tool. See Import from P6 and Microsoft Project.
CRM contacts Import company contacts in the CRM: a reviewed CSV import of up to 200 contacts per file. See CRM.
Open AP and AR, chart of accounts, trial balance Use Accounting Imports. Review master data first, open documents second, then the opening trial balance for the same cut-over date. Control accounts must reconcile to imported open documents.
Imports from accounting systems Accounting accepts documented CSV/XLSX layouts and supports a QuickBooks Online pull into reviewed imports. Viewpoint Spectrum, Sage 300 CRE, Sage Intacct and Foundation come in as file exports; there is no write-back. Check the supported types and limits.

How a cutover works

  1. Choose a cutover date

    Usually a month-end, after that month’s billing and cost are final in the old system.

  2. Set up the structure

    Create the project, its cost codes and your permission templates before importing.

  3. Dry run, then a live run into a test project

    The dry run shows counts per scope. A live run into a test project lets your team check the records before they touch a real job.

  4. Reconcile

    Compare open RFIs, submittals, punch items and contract values against reports from the old system, job by job.

  5. Go live

    Run the import into the real project. New work starts in os.construction; keep the old system read-only for history.

Running side by side

Some teams run os.construction on new jobs while existing jobs finish in their current systems. That avoids migrating jobs mid-stream, at the cost of two systems for a while. Both approaches work; pick the one that fits your backlog.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file