Esc

↑↓ move↵ openIndex · Pagefind
Accounting apps / Chart of Accounts

Chart of Accounts

Maintain the accounts every Accounting app posts to, starting from a numbered construction template.

On this page

Chart of Accounts holds the company’s general ledger accounts: their numbers, types, normal balances and the header accounts that group them. Every other Accounting app posts to these accounts, so this is where the books start. Open it from the company app launcher under Accounting > Chart of Accounts; it appears when your accounting access includes it.

Who uses it
Controllers and accountants with the chart-of-accounts permission. Everyone with accounting access can read it.
When
At setup, then whenever a new account, cost type or reporting line is needed.
What it holds
Account number, name, type, normal balance, cash-flow category, parent header, postable flag and job cost type.

Key workflow

  1. Apply the construction template. One action adds a numbered construction chart: cash, retainage receivable and payable, contract assets and liabilities for under- and over-billings, job cost by cost type, payroll liabilities, accumulated depreciation, equity and the system-role accounts. Only missing account numbers are added, so it is safe to run on a chart you have already started.
  2. Shape the tree. Add or rename accounts and group them under header accounts. Header accounts are not postable: they organize the tree and statements and never take postings.
  3. Mark job cost accounts. Give cost accounts a job cost type (labor, burden, material, subcontract, equipment or other). A posted line on such an account with a project also writes the job cost subledger.
  4. Map the system roles. In Accounting Settings, point each control role (AP control, retained earnings, undeposited funds and so on) at a postable account so the subledgers know where to post.

Controls

  • Once an account has journal activity, its type, normal balance and postable flag are locked. Reclassify balances with a journal entry instead of retyping the account.
  • Creating and editing accounts needs the chart-of-accounts permission; changes are audited.
  • Normal balance and cash-flow category default from the account type, so statements classify new accounts consistently.

Current boundaries

For the full procedure, exceptions and examples, read the General ledger and journals workflow guide.

API operations

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file