Analytics / Set goals and read the scorecard

Set goals and read the scorecard

Turn a KPI into a goal with a target, owner and due date, read Met, At risk and Behind, post check-ins, and compare every project on the goal scorecard.

Preview

Partly in the app today. Items marked Planned are not built yet.

On this page

A goal is a KPI with a target, an owner and a date: “Daily log compliance at least 95%”, “TRIR at or below 1.0”, “Win rate at least 30% this year”. Analytics computes each goal’s value live from your records, gives it a status, and lays every goal out by project on the scorecard.

Open Analytics → Goals at /companies/{company}/analytics/goals. A project has its own Goals tab under Tools → Analytics.

How status is worked out

Every goal is “Met when” ≥ At least or ≤ At most a target. The status comes from the live value:

Status Rule
Met The value meets the target
At risk It misses, but by no more than 10% of the target
Behind It misses by more than 10% of the target
Unavailable The value can’t be read for you. It is never shown as zero
On track Only set by hand, in a check-in

Worked example (illustrative): target Daily log compliance ≥ 95%. The band is 10% of 95, so 9.5 points. At 96% the goal is Met, at 88% At risk (88 is within 85.5–95), and at 82% Behind.

For an “at most” goal the band sits above the target: TRIR ≤ 1.0 is At risk from just over 1.0 up to 1.1, and Behind above 1.1.

A check-in can set the status by hand (On track, At risk or Behind) with a note. That manual status wins until the next check-in and is labeled manual, so everyone can tell judgment from math.

Create a goal

  1. Choose New goal

    On the Goals board choose New goal. On an empty board, a Turn … into a goal button starts one from a suggested KPI.

  2. Pick the KPI and name it

    Choose the metric under KPI. A goal keeps its KPI for life; to track another metric, create another goal. Give it a Name that reads as the target (“TRIR at or below 1.0”).

    If Analytics settings already hold a target for that KPI (TRIR, daily log compliance and inspection pass rate have defaults), Use this target links the goal to the setting. The target is then locked and follows the setting.

  3. Set the target and window

    Choose Met when (≥ At least or ≤ At most), the Target, and Measured over: Now (no window) or a period such as last 30 days or year to date. Add a Due date if the goal has a deadline.

  4. Owner and visibility

    Pick the Owner, the person accountable, who needs analytics access. Under Who can see it, choose Everyone with analytics in the company or Private (you, the owner and people you share it with).

  5. Optional: alert the owner

    Tick Alert the owner when it falls behind. That creates a linked alert that fires when the value passes the Behind line. It is checked every 15 minutes and deleted with the goal.

Company analytics admins also see Create goals from targets, which makes goals from the targets already set in Analytics settings.

Keep goals honest with check-ins

Open a goal and post a check-in: a Note (required), an As of date and a status (Automatic to leave the computed status alone, or On track, At risk, Behind). The goal keeps Weekly snapshots, a History of check-ins and a Conversation thread.

A good check-in says what changed and what happens next: “Two jobs missed logs during the holiday shutdown; supers back Monday, expect recovery by the 15th.”

Read the scorecard

Choose Scorecard on the Goals board (company Analytics only). Each goal is a row. There is an Overall column and one column per project you can read, and each cell shows the value and status word, colored by status.

  • A blank cell means you can’t read that number for that project. It is not zero.
  • Manual marks a status set by the latest check-in.
  • When there are more projects than fit, the scorecard says how many aren’t shown.
  • Save as CSV downloads the grid as goal-scorecard-YYYY-MM-DD.csv for a board pack or an ops meeting.

Use the board in a meeting

Filter the board with Behind, At risk, Met, Due in 30 days or Mine. The summary line (“X of N on target”) is the one-number answer for a leadership meeting. Then walk the Behind goals and ask each owner for a check-in.

Common mistakes

  • Mistake: Goals with no owner who looks at them

    In the app: Every goal has an Owner field. Tick "Alert the owner when it falls behind" so slipping goals reach that person.

  • Mistake: Setting a target on a metric nobody trusts yet

    In the app: Open the KPI in Explore and drill to its records first. Fix the data, then set the goal.

  • Mistake: Leaving a manual status in place for months

    In the app: A check-in status wins until the next check-in. Post an Automatic check-in to hand control back to the math.

  • Mistake: Reading a blank scorecard cell as zero

    In the app: Blank means you can't read that project's number. Analytics never fills hidden values with zero.

A goal worth keeping

  • The KPI matches how you already talk about the number
  • The target is reachable and has a due date
  • One named owner, with analytics access
  • Alert on falling behind is ticked
  • Shared with the people who will be asked about it

Terms on this page

Semantic layer · Row-level security · Win rate · Daily log

Next steps

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file