Using the app / Drawing distribution and release

Drawing distribution and release

Mark up sheets on shared or personal layers, release drawing sets, send a released revision or a saved markup to named people with a recorded receipt, and link a revision to an RFI.

On this page

Once drawings are uploaded, the Drawings tool handles what happens next: marking them up, releasing a set to the team, telling specific people about a revision, and handing a question off to an RFI. Open Drawings from the project’s Project Tools menu. For uploading, the sheet index, revisions and compare, see Documents and drawings.

Most of this happens on a drawing’s detail page, for the revision you’re looking at. Click a revision in Revision History to work on an older one; the page heading changes to Historical Revision.

Mark up a sheet

The markup editor sits at the top of the drawing page, on the selected revision’s original PDF.

  1. Pick a layer

    Layer: switches between Published, which everyone who can see the drawing sees, and Personal, which only you see.

  2. Pick a tool

    Select, Pin, Rectangle, Cloud, Ellipse, Line, Arrow, Freehand, Text, Measure or Calibrate Scale. Set the color and Width.

  3. Measure, if you need to

    Use Calibrate Scale on a known dimension first. After that, Measure lines show lengths.

  4. Undo, redo, delete

    Undo and Redo step through your changes on the current page and layer. Delete Selected removes the selected markup.

  5. Save

    Save writes the layer. The status line confirms how many markups were saved and to which layer.

Use the controls above the sheet to step to the Previous sheet or Next sheet in the same discipline, change PDF pages, zoom, Rotate clockwise, or go Full screen.

If someone else saved the same layer while you were editing, the editor shows Reload and review. It reloads the latest layers and discards your unsaved drafts, so note what you changed first. Without Drawings edit access the editor is read-only.

Release a drawing set

Revisions uploaded into a set wait there until the set is released. Open the set from the Drawing Sets tab.

The set page lists each sheet’s Number, Title, Revision, Discipline, Status and Current sheet before release. A revision’s status is Awaiting release until it’s released, then Published while current or Superseded once a newer revision replaces it. The Details card shows the set’s status, Set Date, Received date and the date it was first Published.

  1. Review the set (optional)

    Submit for Review moves a Draft set to In Review. Return to Draft sends it back.

  2. Release it

    Click Publish & Distribute. Only revisions awaiting release become current, and only those trigger a notification attempt. Earlier history is kept.

  3. Add to it later

    If you add revisions to a set that’s already been published, it shows Partially released with a count of revisions awaiting release. Click Publish & Distribute again to release just the new ones. Revisions released earlier are not released or announced again.

If the set changed after you opened it, release stops with “This set or its current revisions changed. Review the refreshed list before releasing.” Check the list and try again. Releasing a set needs Drawings edit access.

Distribute a released revision

To tell specific people about a released revision, use Distribute released revision on the drawing page. The panel appears for released revisions only, and the form needs Drawings edit access.

  1. Open the revision

    Open the drawing and pick the revision. If it’s an older revision, the panel warns you; recipients’ links will open that exact revision, not whatever is current.

  2. Find recipients

    Type in Find recipients by name and click Find recipients (or More results). Only active project members who can see this revision are listed. Check each person under To. Your picks stay selected across searches.

  3. Add a message

    Message (optional) is up to 2,000 characters.

  4. Send

    Click Record distribution and notify.

The panel then shows a receipt: “Distribution recorded · receipt #”, the communication number and time, who it went to, and how many in-app notifications were recorded. Notifications go out according to each recipient’s preferences. The PDF and your Personal markup are not attached.

The message is stored as a private communication that the selected recipients and authorized Emails administrators can read.

Your record of what was sent

Your latest 20 recorded distributions for this revision lists your receipts on that revision. Each one is the app’s record that you sent it, to whom, and when. Read it for what it says:

  • “Notification attempt finished. Email delivery is not confirmed.” means the app tried to notify; it doesn’t know whether the email arrived.
  • “Notification completion is not confirmed. This request will not automatically send again.” means the attempt was interrupted. Nothing resends on its own; click Start a new distribution if you want to send again.

Resubmitting the same form returns the same receipt and doesn’t notify anyone a second time.

Distribute a saved markup

You can point recipients at one specific markup on the sheet.

  1. Save it on the Published layer

    Personal markup can’t be distributed, and neither can unsaved changes.

  2. Select it

    With Select, click the markup. Distribute selected saved annotation appears below the sheet.

  3. Send it

    Click it. The distribution form opens with “Saved Published annotation on page N”. Choose recipients and record the distribution as above.

On the receipt, Open distributed annotation opens the sheet at that page with the markup selected. If the markup was changed or deleted afterwards, the sheet says so and the distribution record stays.

Linked review RFIs on the drawing page lists RFIs linked to the revision you’re viewing. To hand a question off to an RFI:

  1. Find the RFI

    Enter the Exact RFI number and click Find RFI.

  2. Link it

    Check the subject and status, then click Link RFI to this revision.

The link stays on that revision, including older ones; on the RFI, its Linked Drawings card opens the same revision. The RFI’s status and your markup don’t change, and Personal markup isn’t shared. Assign, answer and close the question in the RFI itself. Linking needs edit access to RFIs, and the RFI must already exist; create it first in RFIs.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file