Data ownership and export
Your data stays yours. What that means in practice, what you can export today, and what's Planned.
On this page
Your project data is the record of your business: every job, every cost, every change. It belongs to you. This page explains what that means in os.construction and how to get it out.
The principle
Your data stays yours, and you can export it whenever you want. Not at contract end, not through a support ticket, not as a paid add-on. A system that holds your job history hostage is a system you cannot trust with it.
- Everything you put in can come out. Records, files and history.
- In formats other tools can read. CSV, PDF, original files and a documented REST API, not a proprietary dump.
- Without asking us. Export is in the product, available to the people you authorize.
What you can export today
Everything else is available through the REST API, with the same permissions as the app. The step-by-step list is in Export to CSV and PDF.
Ownership in practice
- You own your data. We hold and process it to run the service for you.
- Agents (Planned). When agents ship, they’ll work under your permissions and every action will be approved by a person.
- Leaving is allowed. If you leave, you take your data with you.
The formal terms are in the Terms and the Privacy policy.
Why links and history matter in an export
Many systems let you export tables. Fewer let you export the context. If you export a list of change orders and a list of pay app lines, you have lost which change order became which line, which RFI justified it, and who approved it. That context is what you need for a claim, an audit or a dispute two years after closeout.
Because os.construction keeps those links in the data core, the API returns them with the records. A packaged export that carries them is Planned.
Exports for everyday work
Export is not only for leaving. Teams export all the time:
- To your CPA and surety: budget and cost reports.
- To owners and lenders: pay app backup, change order logs, RFI and daily log PDFs.
- To your own analysts: structured data for tools like Excel or Power BI.
Those everyday exports respect permissions. Someone who can’t open a tool can’t export it either. See Roles and permissions.
Security
See Security for how we host and protect your data. If your company has requirements around data residency, retention or security reviews, tell us at hello@os.construction.
Keep exploring
Related across os.construction
- DocsGlossary of os.construction termsThe product words used across these docs, defined plainly. Record, tool, permission template, approval, snapshot, dock, Spotlight and more.
- BlogWhy construction needs an operating system, not another appMost contractors don't have a software problem. They have a seams problem: the same number lives in five systems and none of them agree. The fix is a shared record, not another tool.
- DocsPlanned agentsAP, Billing, Risk, RFI, Compliance and Reporting. The six agents we plan to build first, what each would do and read, and what it would ask you to approve.
- ExplainerWhy one data core: the same record everywhereSee how RFIs, field records, change orders, budget, pay apps and CRM link on one data core in os.construction, and why links beat copies and syncs.
- ExplainerA day as a project managerOne PM's day on a sample project: the desktop, an RFI answer, submittals, the daily log, an OAC meeting, tasks and a change event, all on one record.
- BlogSnagging, variations, retention: a US-UK construction term mapA snagging list is a punch list, a variation order is a change order and retention is retainage. A full US-UK crosswalk of construction terms, with the contract differences that matter: JCT and NEC vs AIA, practical vs substantial completion, and Canadian holdback.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →