Insurance and compliance tracking (COIs)

How certificates of insurance, endorsements, licenses and other vendor compliance items work, what the app tracks today (an insurance register and prequalification), and what is planned.

Preview

Partly in the app today. Items marked Planned are not built yet.

On this page

Before a sub sets foot on your job, your contract with them requires insurance, and usually more: licenses, W-9s, signed safety programs, sometimes bonds. Once they’re working, those documents expire. A sub working with a lapsed policy is a risk you may not find out about until there’s a claim. This page explains how compliance tracking works in the app today and what’s planned.

In the app today

  • Insurance register. Company admins keep insurance policies in Company admin → Insurance: insurance type (for example General Liability or Workers Compensation), carrier, policy number, coverage amount, effective and expiration dates, status (Active, Expiring, Expired, Pending) and notes, optionally tied to a vendor or a project.
  • Prequalification. The Prequalification tool sends questionnaires to vendors and tracks each submission (Invited, Submitted, Under Review, Approved, Rejected, Expired) with a score, EMR, bonding capacity, trade scope, the reviewer’s decision and an expiry date.

Everything below this section, from requirement templates to payment gates, is Planned.

Compliance requirements

A compliance requirement is one item a vendor must provide and keep current. Planned: requirements set by templates (by vendor type, trade or job) and attached to each subcontract or PO.

Item What’s checked
Certificate of insurance (often ACORD 25) Coverage types, limits, policy dates, insurer
General liability Per-occurrence and aggregate limits
Auto liability Combined single limit
Workers’ compensation Statutory coverage, employer’s liability limits
Umbrella / excess Limit, and which policies it sits over
Additional insured endorsement You (and often the owner) named, on the right form
Waiver of subrogation Endorsement provided where required
Primary and non-contributory Endorsement provided where required
Item What’s checked
W-9 On file before first payment
Contractor license Number, classification, expiration, by state
Bonds Performance and payment bond, when the subcontract requires one
Safety Signed safety program, EMR letter, training records where required
Prequalification Approved status and expiry, if you prequalify subs
Prevailing wage Certified payroll submissions on covered jobs

How it will work (Planned)

  1. Requirements attach at commitment

    When a subcontract or PO is created, the matching template adds its requirements. Job-specific owner requirements (higher limits, extra additional insureds) are added on top.

  2. Vendor uploads

    The vendor or their broker uploads documents through a link. Each document is matched to the requirements it covers.

  3. Review

    Dates, limits and named parties are read from the document and compared with the requirement. Gaps are flagged for a person to review and accept or reject.

  4. Expiry watch

    Every accepted item has an expiration date. Reminders go to the vendor and their broker ahead of expiry, on a schedule you set.

  5. Payment gate

    If an item is missing or expired, payments to that vendor follow your rules: warn, require an override, or hold.

Illustrative · what one expired certificate touches

Payment rules (Planned)

Planned: compliance gating set per company and tightened per job. Common choices:

  • Hold payment while required insurance is expired.
  • Require an override (with a reason, logged) to pay with a missing endorsement.
  • Warn only for items like an expiring license more than 30 days out.

See Writing approval rules.

Your own compliance

Planned: the same structure tracks what you owe your owners: your certificates, endorsements, bonds and licenses per prime contract, so owner requirements are visible next to the job.

Agents

A Compliance agent is Planned: requesting renewals ahead of expiry, reading uploaded certificates and proposing accept or reject for a person to decide. See How agents work.

Related: Subcontracts and commitment changes, Lien waiver tracking. Glossary: certificate of insurance, additional insured, waiver of subrogation, wrap-up insurance, subcontractor default insurance, prequalification.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file