How agents work
Planned. What AI agents in os.construction would do, what they could read, how they would propose work, and why a human would approve every action.
This is on the roadmap and not built yet.
On this page
Agents are a Planned part of os.construction: AI workers that know construction (cost codes, commitments, retainage, AIA billing, RFIs). They would do the repetitive work on your real project data, then hand it to a person to approve. Agents do the work. You sign off. This page explains how we plan for that to work.
What an agent is
An agent is a focused worker with one job, such as coding AP invoices or assembling a pay app draft. Each agent has:
- A role. What it is for, in plain language: “Code every invoice to job and cost code and match it to its commitment.”
- A scope. Which projects and record types it works on, and what it can read. Like a person, an agent has permissions.
- Triggers. What starts its work: a new invoice in the AP inbox, a new daily log, a nightly scan, the start of a billing period.
- Outputs. What it produces: drafts, flags and proposals, never posted transactions.
It reads the real data, not a copy
The biggest difference between os.construction agents and an AI tool bolted onto an existing stack is where they read from. Agents work directly on the data core: the same commitments, budgets, RFIs and pay apps your team uses.
That matters because construction answers depend on context. Whether INV-4471 from Volt Electric ($48,200) should be paid depends on PO-118’s remaining commitment ($42,050), on whether CO #14 is approved, and on whether a lien waiver is on file. An agent reading a nightly export would be working from yesterday’s facts. An agent on the data core sees the commitment as it is now.
Propose, then approve
Every agent action follows the same loop:
-
Trigger
Something happens: an invoice arrives, a super logs a hidden condition, the billing period opens.
-
Work
The agent reads the relevant records and does the work: codes the invoice, drafts the RFI, reconciles the SOV.
-
Proposal
The agent produces a proposal with its reasoning and sources: “Exceeds PO-118 remaining commitment by $6,150. Suggest: hold pending CO #14. Sources: INV-4471.pdf, PO-118, CO #14 draft.”
-
Human review
A person with the right permission reviews it. They can approve, edit and approve, or reject with a reason.
-
Action and record
Only after approval does anything post, send or change. The proposal, the decision and the result are written to the audit trail.
Show your work
A proposal is only useful if it is fast to check. Every agent proposal is planned to include:
- What it wants to do, in one line.
- Why, with the numbers that drove the decision.
- Sources, linked to the actual records and documents it used.
- What changes if you approve: which records, which amounts.
If an agent is not confident (a blurry invoice, an ambiguous cost code, two possible commitments), it says so and asks instead of guessing.
Where agents help most
Agents are best at work that is high-volume, rules-heavy and tedious, where a person still needs to make the call:
- Coding invoices and three-way matching them to commitments and receipts.
- Turning field notes into draft RFIs with photos and spec references.
- Assembling pay app drafts, reconciling approved COs to the SOV, flagging missing lien waivers.
- Watching every job each night for fade, overruns and schedule slip.
- Chasing expiring COIs and missing compliance documents.
- Drafting owner report commentary and WIP notes for a person to review and publish in Owner Reports.
See Planned agents for each one in detail.
What agents are not
- Not autonomous. They do not act on their own authority.
- Not a black box. Every proposal shows its sources and every action is recorded.
- Not a replacement for judgment. A PM still decides whether a change is billable; a controller still signs off the WIP.
- Not vague about your data. Your data stays yours. How models are hosted and how your data is handled will be shared with founding contractors before any agent runs on their jobs.
Keep exploring
Related across os.construction
- DocsPlanned agentsAP, Billing, Risk, RFI, Compliance and Reporting. The six agents we plan to build first, what each would do and read, and what it would ask you to approve.
- BlogAgents with approvals: our approach to AI in the back officeAI in construction accounting goes wrong in two ways: chatbots that know nothing about your jobs, and autopilots that post entries nobody checked. Our model is an apprentice with a supervisor. Here are the rules.
- DocsWriting approval rulesPlanned. How approval rules would decide who approves agent proposals and records, by type, amount, job and role, with sequential and parallel steps.
- BlogThe 3-way match, explained for construction APThe textbook 3-way match is a purchase order, a receiving report and an invoice. Construction AP needs a version that works for subcontracts, progress billing, retainage and lien waivers. Here's what to match, and where it breaks.
- GlossaryAI AgentSoftware that uses an AI model to carry out multi-step tasks, like reading documents, checking data and drafting actions, toward a goal.
- GlossaryAudit TrailA permanent, time-stamped record of who created, changed or approved each piece of data, and what it was before.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →