Incidents and the OSHA 300 log: record an injury and classify the case
Report an incident, record the injury, witness statements and corrective actions, classify the OSHA case, and read the project's OSHA 300 log with its case and day totals.
The Incidents tool is where a jobsite injury, near miss, environmental release or property damage gets written down while the facts are fresh, with the people involved, what happened, who saw it and what you’re doing so it doesn’t happen again. Each incident also carries an OSHA case classification, and the tool’s OSHA 300 Log page lists every recordable case on the project with its totals.
For the safety program around it (hazard observations, leading indicators and closing the loop), see the explainer Safety observations to closed. For how a case gets onto the log, see From incident report to OSHA 300 log.
- Who uses it
- Superintendents and safety managers report and investigate. The PM and safety director review. Whoever keeps the company's OSHA records classifies.
- When
- The same day as the event, then updated as days away, restrictions and corrective actions develop.
- What it holds
- Event date and time, location, description, injuries, witness statements, corrective actions, attachments, case classification and day counts.
- Connects to
- ObservationsDaily logOpen items
Report the incident
-
Create
Open Tools → Incidents and click New Incident. Enter a Title that says what happened (“Laborer cut left hand on rebar tie wire, L2 deck”), the Event Date, the time or tick Time of occurrence is unknown, the Location and a Description.
-
Add the injury
Under Injuries (optional), pick the Affected Person if they’re a project user (or type the name), the Company affected, Body Part, Affliction Type and Work Activity. Tick Recordable injury if the injury itself is recordable. You can add more than one injured person.
-
Add corrective actions
Under Corrective Actions (optional), enter an Action Type, Assignee, Due Date and description for each fix. Corrective actions go Open, In Progress, Closed.
-
Decide visibility and status
Tick Mark this incident as private for an injury that should be seen only by people who need it. Save as Draft while you’re still gathering facts, or Open once it’s reported. Close it when the investigation and corrective actions are done.
On the incident afterwards you can add Witness Statements, attachments (photos, the clinic note) and more detail on each injury: source of harm, treatment facility and provider, Treated in emergency room, Hospitalized overnight, Work days absent, Work days restricted, Work days transferred, date returned to work and date of death.
Classify the OSHA case
Two fields decide the OSHA 300 log:
- Case Classification: Death, Days Away From Work, Job Transfer or Restriction, Other Recordable Case, First Aid Only or Not Recordable. New incidents default to Not Recordable.
- Days Away From Work and Days On Restriction on the incident.
The log includes an incident only when its Case Classification is one of the four recordable classes: Death, Days Away From Work, Job Transfer or Restriction, or Other Recordable Case. The This incident is recordable checkbox and the Recordable filter on the list don’t put a case on the log by themselves. Set the classification.
If you leave the incident’s day fields blank, the log adds up the days from its injuries: work days absent for days away, and work days restricted plus transferred for days restricted.
| What happened (illustrative) | Classification | Days away | Days restricted |
|---|---|---|---|
| Cut cleaned and bandaged on site, back to work | First Aid Only | 0 | 0 |
| Cut needed 4 stitches, back to full duty next day | Other Recordable Case | 0 | 0 |
| Sprained wrist, light duty for 6 days | Job Transfer or Restriction | 0 | 6 |
| Fall from ladder, off work 12 days, then 5 days light duty | Days Away From Work | 12 | 5 |
The classification is the most serious outcome of the case. A case with both days away and restricted days is a Days Away From Work case, and its restricted days still count in the totals.
Read the OSHA 300 log
Click OSHA 300 Log in the Incidents tool. It shows:
- Totals: Total Cases, Deaths, Days-Away Cases, Transfer / Restriction Cases, Other Recordable Cases, Total Days Away and Total Days Restricted.
- One row per recordable case: Case No. (the incident number, linking to it), Employee, Job Title, Date, Classification, Days Away, Days Restricted, and a totals row.
The employee is the first injured person on the incident, and the job title comes from that injury’s work activity (or the incident’s). With the four example cases above, the log would show 3 cases (the first-aid case isn’t on it): 1 days-away, 1 transfer/restriction and 1 other recordable, with 12 days away and 11 restricted.
Common mistakes
Mistake: Ticking "recordable" and expecting the case on the log
In the app: The log reads Case Classification. Set it to one of the four recordable classes.
Mistake: Writing the report a week later from memory
In the app: Save a Draft on the day with what you know, then add witness statements and injury detail as they come in.
Mistake: Counting days once, at the start
In the app: Day counts sit on the incident and each injury. Update them when the worker returns or the restriction changes.
Mistake: Closing the incident with the fix still open
In the app: Corrective actions have their own Open, In Progress and Closed status and an assignee and due date.
Mistake: Everyone on the project can read the medical detail
In the app: Mark the incident private so only people with access see it.
✅ Incident report complete
- Title, date, time (or “unknown”), location and a factual description.
- Every injured person, with body part, affliction and the work they were doing.
- Witness statements taken the same day.
- At least one corrective action with an assignee and due date.
- Case Classification set by the person who keeps your OSHA records.
- Days away and restricted updated until the worker is back to full duty.
Next step
Hazards spotted before anyone gets hurt belong in Observations. Note the event in that day’s daily log so the project record and the incident agree.
Was this helpful?