Getting started / Your first project

Your first project

Create a project, set it up, add your team with permission templates and log the first records, using the sample project as a guide.

On this page

The trial workspace already has the sample project, Riverside Medical Center #24-118, so you can see every tool with data in it. When you’re ready to try your own job, create a project of your own next to it. This page covers creating the project, setting it up, adding people and logging the first records.

Create the project

  1. Open the projects list

    Go to Projects (from the workspace switcher in the system bar choose All projects, or pick Projects in the launcher). Click New project.

  2. Basics

    Enter the Project name (required) and, if you use them, the Project number, Stage, Project type and Description. Stages and types come from Company Admin; see Company settings.

  3. Location

    Street address, City, State / region, ZIP / postal code and Country. The location is used on the project hub, in distribution emails and for weather in the daily log.

  4. Dates

    Start date and Completion date (contract start and substantial completion). You can refine dates later in the project’s Admin tool.

  5. Start from

    • Standard defaults: a starter CSI cost code set, a Site location, all tools turned on and you as Project Admin.
    • Copy an existing project: pick a Template project to copy its cost codes, team permissions and tool settings. No records are copied.
  6. Create project

    Click Create project. The app opens the new project’s hub.

Set up the project

Open the project’s Admin tool from the launcher. Its tabs are General, Project Dates, Tools, Permissions, Cost Codes, Locations, Sub Jobs and Field Sets / Custom Fields.

Project setup

  • Tools: turn off the tools this job won’t use, so the dock and launcher stay short for everyone on the project.
  • Cost Codes: check the starter codes against how you estimate and report cost, and add or archive codes. Budgets, commitments and direct costs are coded to these. See Cost codes and budgets.
  • Locations: add buildings, floors and areas so punch items, observations and photos can be located.
  • Permissions: check the permission templates people on this project will get. See Permission templates.

Add your team

People need an account in the company before they can work on a project. A company admin invites them from Company Admin → Invitations (see Invite your team).

To put someone on this project, open the project Directory, click Add Person, enter their Email Address and name, and choose a Project Role and a Project Permissions Template. Use Add Company for the owner, architect and subcontractor firms on the job, so you can assign RFIs, submittals and commitments to them.

Log the first records

A good first hour on a real job:

  1. Schedule. Import your current schedule from Primavera P6 (XER or XML) or Microsoft Project (XML), or build one in the scheduler. See Import from P6 and Project.
  2. Budget and contracts. Enter the original budget by cost code, the prime contract, and your first subcontracts and purchase orders. See Budget, Prime contracts and Commitments.
  3. Drawings and documents. Upload the current drawing set and the spec book. See Documents and drawings.
  4. Field. Start the daily log and raise the first RFI. See Daily log and RFIs.

Moving several projects or years of history? Use the Migration guide instead of keying records in by hand.

Next

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file