Leases
ASC 842 lessee accounting: commencement entries, monthly schedules, current-portion reclass and 842-20-50 disclosures.
Leases keeps the company’s ASC 842 lessee register for operating and finance leases, with a short-term election. It posts the commencement entry, runs the monthly schedule and produces the required disclosures. Open it from the company app launcher under Accounting > Leases; it appears when your accounting access includes it.
- Who uses it
- Accountants with journal posting rights.
- When
- At lease commencement; monthly runs; at reporting dates for disclosures.
- What it holds
- Leases, monthly schedules (liability, interest, principal, current portion, lease cost, right-of-use asset), runs and their GL lines.
Key workflow
- Add the lease. Unless it is a short-term election, adding a lease posts the right-of-use asset and lease liability at the present value of the payments, using exact decimal schedules with rounding settled in the last month. Choose the monthly rate convention: the annual rate ÷ 12 (nominal) or an effective annual yield.
- Run each month. Preview, then post the monthly run. It catches each lease up to its schedule, covering lease cost, interest, right-of-use amortization and payments, and reclassifies the next 12 months to the current portion.
- Disclose. Produce ASC 842-20-50 disclosures: lease cost by type, cash paid, right-of-use assets obtained, weighted-average remaining term and discount rate, and the maturity analysis.
- Modify. Record a term change, payment change or partial termination from Modify lease. The liability is remeasured at the revised rate, the right-of-use asset adjusted (a partial termination books a gain or loss), and the schedule versioned with earlier months kept. A separate-contract modification becomes a new lease through the API.
- Correct. Reverse a run (the next run catches up) or void a lease entered by mistake.
Controls
- Runs and voids are idempotent for the same date and reason, and audited.
- Lease terms are locked by a database trigger, and modifications are append-only. A modification is refused while runs are posted on or after its effective month, and in a closed period.
Current boundaries
For the full procedure, exceptions and examples, read the Leases workflow guide.
API operations
11 operations · 6 read · 5 write · base path /rest/v1.0/companies/{company_id}/accounting
- GET
/leasesList leases - POST
/leasesAdd a lease - GET
/leases/{id}Show a lease - GET
/leases/{id}/modificationsList lease modifications - POST
/leases/{id}/modificationsModify a lease (ASC 842 remeasurement) - POST
/leases/{id}/voidVoid a lease - GET
/leases/disclosuresLease disclosures - GET
/leases/runsList lease runs - POST
/leases/runsPreview or post a lease run - GET
/leases/runs/{id}Show a lease run - POST
/leases/runs/{id}/reverseReverse a lease run
Parameters, request and response fields, errors and a generated example for each operation are in the REST reference for this app. Read scopes, step-up and permissions in the Accounting API guide.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →