Bidding, RFQs and prequalification
Put work out to bid with bid packages, level the quotes, award with an independent approval and turn the award into a commitment. Price changes with RFQs, and record vendor prequalification.
On this page
Three project tools handle buying out work and pricing changes. Bidding puts a scope of work out to bid with a bid package and carries the award to a commitment. RFQs (requests for quotes) price a smaller scope, usually a change, and can feed a change event. Prequalification records whether a vendor is qualified to bid. All three are in the project’s Project Tools menu.
Bidding
Create a bid package
-
+ Create
In Bidding, start a New Bid Package. Under General Information, enter a Title (and a Number, or leave it blank), the Bid Due Date, Anticipated Award Date, Bid Package Manager, Cost Code and Accounting Method. Choose Blind Bidding or Sealed Bidding if the package needs them.
-
Description and instructions
Add the Description, Bidding Instructions (Web), the Pre-Bid Walkthrough Date and Pre-Bid Walkthrough Notes, and a Bid Email Message. The message is stored text only; creating a package doesn’t send email.
-
Bidders and distribution
Pick vendors under Add Bidders, and fill in Specification Sections and the Distribution List. Adding bidders registers them; it doesn’t invite anyone.
A package starts in Draft. Its statuses are Draft, Open, Closed and Awarded. Bidders show as Not Invited, Invited, Viewed, Will Bid, Declined or Submitted.
The Bid Form on the package lists the lines bidders price (description, quantity, unit of measure, unit cost and amount). Bid forms are added through the REST API or come from a CRM proposal handoff; the package page shows “No bid form has been created for this package” until one exists. A package created from an approved CRM proposal shows an Internal CRM source panel linking back to the opportunity. See Construction CRM.
Release the package to bidders
Before bidding opens, someone reviews exactly what bidders will see.
-
Open Vendor Release
On the package, click Vendor Release. Under Vendor release files, stage and classify each file bidders should get (PDF, PNG or JPEG, up to 8 MiB), confirming you checked it for prices, private notes and personal information. Other package attachments stay private.
-
Preview
Click Generate release preview and review every vendor-visible field and file in the Recipient preview.
-
Approve
Record why the fields are safe to share and click Approve this vendor release. Then go back to the package.
-
Open Bidding
Click Open Bidding. Until a release is approved, the package shows “Approve the vendor release before opening bidding.”
Invite bidders and collect quotes
Under Recipient invitations, pick an active contact for a bidder (a project user who works for that vendor) and click Record Local Invitation. This records the invitation; no email is sent. Use Open recipient invitation to get the link to share, and Revoke invitation to cancel it. The invited contact signs in and submits their quote and terms through the link. The invitation’s access expires seven days after the invitation form was opened.
To change the scope after bidding opens, use Prepare an addendum: Return to Draft for Addendum invalidates the current release and invitations, so you approve a new release and invite bidders again.
Level the bids
The Bid Leveling panel lines up each bidder’s amounts by bid form line, with the lowest, highest and spread, so you can see where quotes differ. Close Bidding when the due date passes; Reopen Bidding if you need to.
Award with an independent approval
-
Open award review
On the package, click Open frozen comparison and award review. It compares the exact quotes bidders submitted under the approved release.
-
Recommend
Pick the quote, add notes and the reviewed cost codes, confirm you compared the current frozen quotes, and click Record recommendation.
-
Approve
A different Bidding administrator reviews the comparison and clicks Approve recommendation. Approval allows the award; it doesn’t issue a contract.
-
Award
Under Award the independently approved quote, check “I reviewed this bid and want to award it” and click Confirm award. The package becomes Awarded. Awarding doesn’t create a commitment.
Turn the award into a commitment and review buyout
Click Review commitment, choose the Commitment type and a fallback cost code for lines without one, check “I reviewed the awarded bid and want to create this commitment” and click Confirm commitment. This creates a draft subcontract or purchase order in Commitments. The package then shows an Award to commitment receipt that keeps the source and cost-code mapping as they were at conversion.
From the receipt, Review buyout against captured Budget compares the award with a Budget snapshot. Choose a captured snapshot, allocate the award by cost code, click Review allocation against baseline to see revised budget, prior committed and direct cost, headroom and variance per code, then Approve this buyout plan.
RFQs
An RFQ asks one or more vendors to price a defined scope. It’s the usual way to price a change event.
-
+ Create RFQ
In RFQs, click + Create RFQ. Under Scope, enter a Title, the Scope of Work and Description / Instructions. Under Pricing & Assignment, set the Due Date, Estimated Amount, Cost Code, Location, Assigned To (ball in court while out for pricing) and optionally a Contract. Pick vendors under Invite Vendors.
-
Open for pricing
Check Open for pricing immediately (assigns an RFQ number), or leave the RFQ as a draft. Then click Create RFQ.
-
Record quotes
As quotes come in, use Record a Quote: pick the Vendor, enter the Total Cost, Lead Time (days) and Notes, and click Submit Quote.
-
Award
The Bid Leveling grid compares quotes against the estimate. Click Award under the winning quote.
-
Hand off to the change event
On an awarded RFQ, Create Change Event from awarded quote creates a linked change event. If the RFQ came from a change event, the awarded amount is reflected on that event’s line items.
RFQ statuses are Draft, Out for Pricing, Closed and Awarded; quoters show as Invited, Viewed, Quoted or Declined. Close and Reopen are on the RFQ header. Awarding an RFQ that’s linked to a change event needs edit access on Change Events with the tool turned on. From the change event side, use Create RFQ from Change Event or Link RFQ. See Change events and change orders.
Prequalification
Prequalification records whether a vendor is qualified, based on a questionnaire your team fills in from what the vendor provides. These are staff records: the tool doesn’t send email or invite the vendor.
-
Build a questionnaire
On the Questionnaires tab, click New Questionnaire. Give it a name and description, then + Add question for each item, with a type (text, number, yes/no or a choice list with options) and Required where needed. Click Create Questionnaire. Questionnaires that have responses are frozen; use Create New Questionnaire Version to change one.
-
Record the invitation
Click + Record Staff Invitation. Pick the Questionnaire and Vendor, and enter the Trade Scope, Bonding Capacity, EMR and Expires On date.
-
Record the responses
Open the submission, enter the vendor’s answers and click Record Staff Responses & Submit.
-
Review
Set a Score (0-100) and a Decision (Approve, Reject or Mark Under Review while you’re still scoring) and click Submit Review.
The Submissions tab shows a pipeline: Invited, Submitted, Under review, Qualified and Rejected / expired, with how many qualified vendors are expiring soon or have lapsed. Each submission shows its current validity against the recorded expiry date.
Insurance certificates are tracked separately; see Insurance and COI tracking.
Keep exploring
Related across os.construction
- GlossaryBid LevelingComparing subcontractor bids line by line, adjusting for scope gaps and exclusions, so they can be judged on equal terms.
- GlossarySubcontractA contract between the prime contractor and a trade contractor to perform a defined part of the prime contract's scope.
- Free toolBid tabulation and leveling templateFree bid tab template for Excel.
- DocsRFQs: get sub pricing for a changeAsk subs and suppliers to price a change, record and level their quotes, award one, and hand the price to a change event so it can become a PCO on the owner contract and the sub's commitment.
- PlatformConstruction CRMInquiries, pipeline, proposals and bidding handoff to won projects, service and warranty, on the job record.
- BlogHow to run a construction buyout: buy-by dates, a buyout log and where the savings goBuyout turns the estimate into signed subcontracts and purchase orders. Run it as a schedule, not a to-do list: work back from each package's need-on-site date to a buy-by date, bid and level, write the scope into the contract, record every variance against the budget, and track the log weekly. Here is each step with a worked buyout log.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →