Field tools on phones
Daily logs, photos, observations, RFIs and punch items entered from a phone browser land directly in the job record, so the office sees what the field sees. Native apps are Planned.
On this page
The jobsite is where most construction facts are born: what got installed, who was on site, what was hidden behind the drywall. In a disconnected stack, those facts are typed into a field app, then retyped, summarized or lost on the way to the office. In os.construction, field tools run in your phone’s browser at app.os.construction, so a super’s entry is the record the office sees. There’s no app to install. Native iOS and Android apps are Planned.
What you can do from the field
Sign in on your phone at app.os.construction and open the project. The field tools are the same tools the office uses:
| Tool | What it holds | Where it goes next |
|---|---|---|
| Daily Log | Weather, manpower, notes, deliveries, visitors, equipment, delays, safety violations and more | Day completed, PDF or CSV for the job file |
| Photos | Photos in albums, with description, location, GPS, tags and annotation notes | Linked from RFIs and other records |
| Observations | Safety and quality observations, with linked drawings | Convert to RFI or Convert to Punch Item |
| RFIs | Question, location, cost code, drawing and spec references, cost and schedule impact | Assignees, then change events |
| Punch List | Issue, location, responsible party | Punch items worked and closed |
| Inspections | Inspection checklists, with signatures | Inspection records |
| Incidents | Injuries and other incidents | The project’s OSHA 300 log |
| Timesheets | Hours by person, with an approval workflow | Approved timesheets |
| T&M Tickets | Labor, equipment and material on time-and-material work | Ticket records for pricing the work |
Uploading photos from a phone opens the camera or photo library through the browser’s file picker.


From the corridor to the change order
Here is the Riverside Medical example from the field’s point of view. Sample data.
-
Record what you see
The super opens the L3 corridor ceiling and finds no fire dampers where the drawings show them. Photos go into Photos, and the condition goes in as an observation with the drawing linked.
-
Escalate it
On the observation, Convert to RFI creates an RFI linked back to it. The observation then shows View linked RFI.
-
The office picks it up
The PM sees the RFI as soon as it’s created, sets the assignees and records the likely cost and schedule impact.
-
It follows the money
When the answer means extra work, the PM opens a change event that references the RFI, and the change orders that price it stay linked to it. See Change orders.

Why it matters to the office
- Change orders start earlier. A hidden condition becomes an RFI and a change event the day it’s found, not when someone remembers at the OAC meeting.
- Backup is attached. When an owner questions a change, the observation, photos and RFI are already linked.
- Nothing is retyped. The office doesn’t re-enter what the field already entered.
Offline and connectivity
Field tools need a connection today. Offline capture for the other field tools is Planned; see Offline capture. The one exception is the schedule: Field mode keeps a project’s schedule and lookahead on the device and records progress without signal.
Subcontractors in the field
Subs often know about a problem first. Outside companies you invite get a permission template like anyone else. The default Subcontractor template in new workspaces can work RFIs, submittals and punch items on the projects they’re invited to, and read the rest. See Permission templates.
Keep exploring
Related across os.construction
- GlossaryDaily LogThe superintendent's dated record of each day on site: weather, manpower, work performed, deliveries, inspections, visitors, delays and issues.
- DocsProjects and the record modelHow a job is structured in os.construction, what a record is, which record types the app has, and how links between RFIs, change events, change orders and pay apps keep the story connected.
- DocsGlossary of os.construction termsThe product words used across these docs, defined plainly. Record, tool, permission template, approval, snapshot, dock, Spotlight and more.
- Blogos.construction is open for trialsThe app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
- GlossaryRequest for Information (RFI)A formal written question from the contractor to the design team asking them to clarify, fill a gap in, or resolve a conflict in the contract documents.
- BlogField to ledger: why daily logs are financial documentsThe daily log is usually treated as a field formality. It's actually the first record of almost every number accounting cares about: labor, equipment, deliveries, delays and changes. Here's what to capture, and how it flows to cost, billing and claims.
Was this helpful?