Review every project from the Portfolio page
Run a weekly portfolio review: read the company totals, find the jobs with overdue items and thin commitment coverage, group jobs into programs, and know exactly how each number is counted.
Partly in the app today. Items marked Planned are not built yet.
On this page
Portfolio is one table of every project you can see, with open items and cost roll-ups side by side and a company total at the bottom. It is the quickest way to answer “which jobs need me this week?” before you open any one of them.
Open it at /companies/{company}/portfolio.
What you see
Company totals come first, in two rows:
- Projects (active / all), Open RFIs, Open submittals, Open punch, Open observations and Overdue items (with “of N open”).
- Original budget, Committed (with % of budget), Change orders and Projected.
Then the Projects table, one row per project, with the same columns plus Stage, and a Company total row. Inactive (archived) projects stay on the list with an inactive tag. Under the table is Programs.
How each number is counted
Read these before you act on a number. They are the exact rules the page uses.
| Column | Counts |
|---|---|
| RFIs | RFIs with status Open |
| Submittals | Submittals that are Open or Revise and Resubmit |
| Punch | Punch items in any status except Closed |
| Obs. | Observations that are Initiated, Ready for Review or Not Accepted |
| Overdue | Open RFIs, submittals and observations past their due date. Punch items are not included. |
| Orig. Budget | Sum of original budget amounts on the budget lines |
| Committed | Sum of line items on commitments that are not cancelled |
| Change Orders | Sum of line items on every potential change order (PCO) that isn’t deleted, whatever its status, so pending and unapproved PCOs count |
| Projected | Original budget + Change Orders |
Who sees what
- Company admins see every project. Everyone else sees only projects they are on.
- Counts follow each tool’s privacy rules, so a private RFI you can’t open isn’t counted for you.
- Original budget needs Budget view access with the Budget tool turned on. Committed and Change orders need permission to read the contracts behind them. If any of that is hidden from you, the amount shows Unavailable, and a notice says the financial totals are partial. Unavailable never shows as zero.
Two people can therefore see different totals on the same page.
Run a 15-minute weekly review
-
Start with Overdue items
Look at the company Overdue items tile and its “of N open” line. Then scan the Overdue column. Any row in red is a job with RFIs, submittals or observations past due.
-
Open the job and find the owner
Project names on Portfolio are not links. Open the job from the company home, then use My Open Items or the tool’s list filtered to overdue to see who has the ball. See Find anything: search and open items.
-
Check commitment coverage
Compare Committed to Orig. Budget on each active job. A job deep into construction with a low committed share usually means buyout is behind, or work is being bought without commitments in the system.
-
Look at Change Orders against budget
Because the column includes pending PCOs, a big number here is exposure as well as approved change. Open the job’s change orders to split pending from executed.
-
Note it, assign it, move on
Make a task for each follow-up in the project, so it shows up in the owner’s open items. Next week, the same rows should be smaller.
Worked example
Illustrative. Three active jobs:
| Project | Overdue | Orig. Budget | Committed | Change Orders | Projected |
|---|---|---|---|---|---|
| 24-118 Riverside Medical | 7 | $42,640,000 | $36,800,000 | $1,160,000 | $43,800,000 |
| 24-125 Mill Street Expansion | 0 | $6,200,000 | $1,100,000 | $40,000 | $6,240,000 |
| 24-131 Harbor Point Dental | 2 | $390,000 | $305,000 | $0 | $390,000 |
How to read it:
- Riverside has the overdue items. Start there.
- Mill Street has only 18% committed. If it is past mobilization, ask the PM about buyout.
- Riverside’s $1.16M of change orders includes pending PCOs. Don’t quote it as approved change to the owner.
Group jobs into programs
A program groups projects (a campus, a client’s rollout, a region) and shows combined Overdue, Orig. budget, Committed, Change orders and Projected.
Company admins choose + New program, enter a Program name, an optional Description, tick the Projects, and choose Create program. Each program card can be deleted by an admin. Program totals follow the same visibility rules as the table.
Common mistakes
Mistake: Reporting Projected as the forecast cost
In the app: Projected is original budget plus all PCO amounts. Use the Budget & cost pack for EAC and over/under.
Mistake: Assuming zero overdue means punch is on track
In the app: Overdue excludes punch items. Check the Punch column and the punch list itself.
Mistake: Comparing your totals with a colleague's
In the app: Totals depend on who is looking. Company admins see every project; others see their own.
Mistake: Reading Unavailable as nothing committed
In the app: Unavailable means you can't read the contracts. Ask for access or ask someone who has it.
Weekly portfolio review
- Company Overdue items noted and compared with last week
- Every job with overdue items has a named owner and a task
- Committed vs original budget checked on jobs in buyout
- Pending PCO exposure confirmed on jobs with large Change Orders
- Programs reflect current client groupings
Terms on this page
RFI · Submittal · Punch list · Commitment · Potential change order · Estimate at completion
Next steps
- Put targets on these numbers and get told when they slip: Set goals and read the scorecard.
- See how goals, alerts and reports fit together: Dashboard goals, alerts and reports.
- How projects carry stage and type: Projects and the record model.
Keep exploring
Related across os.construction
- DocsAnalytics BI guideGet started with Analytics, build a dashboard from the metric catalog, read the CRM & Pipeline pack, share and schedule results, and understand exactly which rows each person sees.
- GlossaryCost reportA job report showing, by cost code, the original and revised budget, committed cost, actual cost, cost-to-complete, forecast and variance.
- ExplainerBudget, commitments and cost: one ledger for the jobHow budget lines, subcontracts, POs and forecast to complete add up to estimated cost at completion in os.construction, on Riverside sample data.
- DocsOwner ReportsBuild the monthly owner report, a GMP cost report or an executive one-pager from live project data, publish frozen versions, download a branded PDF, share it through expiring owner links and schedule delivery.
- ExplainerFind anything: search, open items and ball in courtHow os.construction finds records across tools: Spotlight and the search page, My Open Items, and the ball in court rules for each tool.
- GlossaryGeneral conditionsIn construction, either the contract document that sets the parties' general rights and duties (such as AIA A201), or the job-specific costs of running the site that aren't tied to one trade: staff, field office, temporary facilities and cleanup.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →