Permits
Keep a register of the project's permits, record what the authority reports at each stage with evidence, track conditions through to completion, and work open permit follow-ups across projects.
On this page
The Permits tool is the project’s permit register: building, electrical, hot work or any other permit the job needs, with the issuing authority, the conditions attached to it and a dated history of what the authority reported. Open it from the project’s Project Tools menu.
The permit register
The register lists Number, Permit, Authority, Type, Status and Authority expiration. Filter by Status or search. A permit’s status is one of:
| Status | Meaning |
|---|---|
| Draft | Entered, not yet submitted |
| Submitted | Submission recorded |
| Corrections Required | The authority asked for corrections |
| Approved | Approval recorded |
| Issued | Issuance recorded, with an expiration date |
| Suspended | Suspension recorded |
| Closed | Closure recorded |
| Withdrawn | Withdrawal recorded |
| Expired | Shown for an issued permit whose recorded expiration date has passed |
Expired is a display status. The permit’s history isn’t rewritten; renew it to bring it back to Issued.
Create a permit
-
Open the form
Click Create permit.
-
Fill in the details
Enter Permit title, Issuing authority, Jurisdiction and Permit type. Optionally pick a Responsible person and describe the Scope of work.
-
Save
Click Create permit. The permit starts as Draft.
To change these details later, open the permit and use Edit permit details in the sidebar. Closed and withdrawn permits can’t be edited.
Record what the authority reports
On the permit, the Record authority report section lists the actions that fit the current status:
| Action | From | To |
|---|---|---|
| Record submission | Draft, Corrections Required | Submitted |
| Record corrections required | Submitted | Corrections Required |
| Record approval | Submitted | Approved |
| Record issuance | Approved, Suspended | Issued |
| Record suspension | Issued | Suspended |
| Record renewal | Issued | Issued, with a later expiration |
| Record closure | Issued | Closed |
| Record withdrawal | Any open status before issuance, or Suspended | Withdrawn |
Each report asks for:
- Authority report date, which can’t be earlier than the previous recorded action.
- Authority reference, required for submission, approval, issuance and renewal.
- Authority expiration date, required for issuance and renewal. A renewal must extend the current expiration.
- Report notes.
- Evidence: an Uploaded document receipt (an exact version of a file in the Documents tool), an Authority evidence link (HTTPS), or a Reason evidence is unavailable. The report is marked as missing evidence if you give a reason instead.
Upload the authority’s receipt or decision to Documents first, then pick it in the form. The permit keeps the exact version you picked, so a later upload doesn’t change it. People need their own Documents access to open it.
Every report goes into Recorded history with who recorded it, the status change, the reference and the evidence.
Who can record what
With standard access to Permits you can create and edit permits, record submission, corrections and withdrawal, and manage conditions. Recording approval, issuance, suspension, renewal or closure needs admin access to the tool. Read-only users can view the register.
Track conditions
Permits often come with conditions: a special inspection before close-out, a fire watch, a plan to submit. Track each one in the Conditions section.
-
Add the condition
Click Add condition, enter the Condition description, choose Required before (Issuance or Closure), and optionally a Condition due date and Condition assignee. Without an assignee, the permit’s responsible person owns it.
-
Keep follow-up current
Update condition follow-up changes the Recorded condition due date or the Follow-up assignee, with a Follow-up change reason. It doesn’t extend an authority deadline.
-
Complete it
Record condition completion closes the condition with the same evidence choices as an authority report.
You can’t record issuance while a condition required before issuance is open, or closure while any condition is open.
Field receipts and office review
When someone in the field has the proof (a signed inspection card, a test report), they can send it for review instead of completing the condition themselves:
-
Submit the receipt
On the open condition, click Submit receipt for office review, pick the Uploaded document receipt and add a Receipt submission note. The condition stays open.
-
A different administrator reviews it
A permit administrator other than the submitter opens Review receipt submission, checks the document, picks an Office decision (Accept receipt and complete condition or Reject receipt; keep condition open) and gives a reason.
Acceptance is an internal review, not authority approval. If the condition changes before review, the pending receipt can no longer be acted on and must be submitted again. Receipts awaiting my review opens the company-level inbox of receipts you can review, oldest first, across the projects you administer.
Link an inspection
Permit administrators can link a condition to an existing inspection in the Inspections tool. Use Find existing inspections to search, then Change inspection follow-up on the condition, pick the inspection and give a reason. The condition shows the inspection’s number, status and scheduled date. Closing the inspection doesn’t complete the condition; that still goes through completion or receipt review. See Inspections.
Work the permit queue
Open permit work queue on the register lists open conditions and expiration follow-ups for issued permits on this project, earliest date first. Filter by:
- Owner: Everyone, Assigned to me or Unassigned.
- Due window: All dates, Overdue, Today and next 30 days or No due date.
- Permit search: permit number or title.
Each item shows whether it’s Overdue, Due today, in the Next 30 days or Later, with its owner, and Open permit goes straight to it. Dates use UTC. Expiration items are reminders to confirm requirements with the authority.
Across all your projects
Company permit work queue shows the same open work for every project where you can see Permits. Add a Project filter to narrow it, and set Maximum tasks to see more. From an item, Project permit queue opens that project’s queue.
Keep exploring
Related across os.construction
- GlossaryCSI MasterFormatThe Construction Specifications Institute's standard numbering system that organizes specifications into divisions like 03 Concrete and 26 Electrical.
- GlossaryScope of WorkThe written description of the work a contractor or subcontractor must perform, including what is included, what is excluded and the standards it must meet.
- DocsBidding, RFQs and prequalificationPut work out to bid with bid packages, level the quotes, award with an independent approval and turn the award into a commitment. Price changes with RFQs, and record vendor prequalification.
- BlogHow to run a construction buyout: buy-by dates, a buyout log and where the savings goBuyout turns the estimate into signed subcontracts and purchase orders. Run it as a schedule, not a to-do list: work back from each package's need-on-site date to a buy-by date, bid and level, write the scope into the contract, record every variance against the budget, and track the log weekly. Here is each step with a worked buyout log.
- BlogHow to run a preconstruction meeting, with a sample agendaThe preconstruction meeting is the last chance to agree how the job will run before anyone is on site under pressure. Here is who should attend, a sample agenda covering scope, schedule, submittals, RFIs, changes, payment, safety and site logistics, how to write it up, and a worked example of a subcontractor precon.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →