Key concepts: one data core
Why os.construction keeps project records, project financials and reporting on a single record model, and what that changes day to day.
On this page
Everything in os.construction rests on one idea: each fact about a job is stored once, and every part of the system reads that same fact. We call this the data core. This page explains what it is, why it matters and what it changes for the field, the office and the people reading the reports.
Two databases always drift
In a typical stack, a change order lives in at least three places: the PM tool where it was approved, the accounting system where the budget and contract are updated, and the spreadsheet where someone tracks it for billing and WIP. Each copy is updated at a different time by a different person.
Integrations help, but an integration is still a copy. Sync jobs fail quietly. Field names do not match. Cost codes are mapped by hand. Someone exports, someone imports, and the numbers are right until the next change. Month-end becomes the moment everyone stops and makes the copies agree.
The data core removes the copies. There is one change order record. The field, the office and the forecast are looking at it, not at their own version of it.
One record, many views
Follow CO #14 on the Riverside Medical Center sample job. It starts with RFI-212 (missing fire dampers on L3) and is priced at $86,400. When it is approved, nothing is exported or re-keyed. The tools that need it read the same records:
Each tool is a view of the records with its own workflow and permissions. The project manager sees CO #14 as a change with a scope description, a link back to its change event and an approval status. The Budget tool sees a revision on the affected cost code. The prime contract sees a higher revised contract sum that the next pay app bills against. Company Accounting computes period-end WIP from supported posted costs and billings, contract sources and approved forecast inputs; review and posting remain explicit steps.
What lives in the core
The core holds the records construction runs on, and the links between them:
- Projects and contracts: the job, the prime contract, its schedule of values.
- Cost structure: cost codes and cost types, budgets and budget revisions.
- Commitments: subcontracts and purchase orders, with their change orders.
- Project records: RFIs, submittals, daily logs, photos and drawings, each tied to a job and, where it makes sense, a cost code.
- Financial records: prime contract billings (pay apps), sub invoices against commitments, direct costs and retainage. Company Accounting adds AP, AR, payroll, journals and source-linked postings with separate accounting permissions.
- People and companies: your team, subcontractors, suppliers, owners and architects.
Links matter as much as records. The change event for the dampers records RFI-212 as its origin. It links to its change orders and budget lines, and Summit Mechanical’s commitment change order sits on its subcontract. Because those links are stored, not typed into notes, you can start from a record and follow the chain.
What changes day to day
For the field. A super’s daily log or RFI is not a note the office retypes. It is the first step of the record. If it turns into cost, the cost is already attached to the job and the cost code.
For project managers. Budget, committed cost and cost-to-complete are not a report from accounting that is two weeks old. In the Budget tool they are computed from the same commitments, change orders and direct costs, not imported from a report.
For accounting. Billing starts from the prime contract and approved changes, and sub invoices are entered against the commitment they bill. Company Accounting supports AP coding and matching; project payment applications do not automatically post accounting entries.
For leadership. Review WIP, underbillings, overbillings and forecast margin through the Accounting workflow. Snapshots preserve the reviewed period-end result; changes to relevant sources require recomputation and review.
What one core does not mean
One data core does not mean one giant screen or everyone seeing everything. Access is set per tool with permission templates. The default Subcontractor template can work RFIs, submittals and punch items and read the rest; you choose what else it sees. See Roles and permissions and Set up permission templates.
It also does not mean locking your data in. You own it, and you can export it. See Data ownership and export and Export to CSV and PDF.
Next
Read Projects and the record model to see how jobs, records and links are structured, then Cost codes and budgets.
Keep exploring
Related across os.construction
- ExplainerWhy one data core: the same record everywhereSee how RFIs, field records, change orders, budget, pay apps and CRM link on one data core in os.construction, and why links beat copies and syncs.
- ExplainerChoosing what to put in the data core firstA migration plan for os.construction: which records go in first, what the import tool brings over today, and what is a file, a manual step or planned.
- BlogWhy construction needs an operating system, not another appMost contractors don't have a software problem. They have a seams problem: the same number lives in five systems and none of them agree. The fix is a shared record, not another tool.
- DocsJob cost and WIPReview job cost forecasts, then compute, approve and post the WIP schedule.
- DocsCommitments and change ordersSubcontracts, purchase orders, owner change orders and commitment change orders, and how one change flows from the field to the contract, the commitment and the budget.
- GlossaryERP (Enterprise Resource Planning)Software that runs a company's core business processes, like accounting, payroll, purchasing and job cost, on one database.
Was this helpful?