Insurance and COIs
Keep an insurance register in Company Admin, receive certificates and endorsements as evidence, review them, route renewal follow-ups, and bring in COIs vendors upload through the AP portal.
On this page
Company Admin → Insurance is your company’s insurance register: each policy you track for your own company or a vendor, its recorded dates, the certificates and endorsements you’ve received for it, who reviewed them, and the renewal work still open. It’s for company admins only. For background on how COIs and vendor compliance work, see Insurance and compliance tracking.
Add a policy
-
Open Company Admin → Insurance
Company Admin lives at
app.os.construction/companies/<your company>/admin. Under Organization, pick Insurance. The page is titled Insurance Policies. -
Fill in New policy
Insurance type is required (for example General Liability or Workers Compensation). Add the Carrier, Policy number, Coverage amount, Effective date and Expiration date. Pick a Project, or leave it as Company-wide, and a Vendor, or No vendor for your own policies. Add Notes if you like.
-
Select Create policy
Each policy shows its status, its expiration date and a suggested next step. Edit the fields and select Save policy to update it. Delete policy works only on policies with no evidence, renewal or follow-up history; once a policy has history it stays.
How status is worked out
Status comes from the recorded dates, checked against today’s date (UTC). It is never a judgment about coverage.
| Status | When |
|---|---|
| Pending | No expiration date is recorded, or the effective date is still in the future. |
| Expired | The expiration date has passed. The expiration day itself still counts as current. |
| Expiring | The expiration date is within the next 30 days. |
| Active | The expiration date is more than 30 days away. |
The queue links across the top of the register filter by status: All policies, Expired, Expires within 30 days, Pending and Active. You can also Filter by project and Filter by vendor, then Apply filters. The Company Admin Overview counts expired and expiring policies and links to the register when any need attention.
Receive a certificate or endorsement
Open a policy with Evidence, reviews and renewals.
-
Go to Receive evidence
Pick the Document kind: Certificate, Policy or Endorsement.
-
Choose where the file is stored
Pick a Storage project. A project policy uses its own project. This only decides where the file is kept; it doesn’t change what the policy covers.
-
Replacing an earlier file?
If this supersedes a file you already received, pick it in Replaces earlier evidence (optional). The earlier file stays in the policy’s history.
-
Add the file and a reason
Choose an Evidence file (PDF, PNG, JPG or TIFF), write the Reason and review notes, and select Receive evidence.
The file arrives as Not reviewed. The app also keeps a copy of the policy’s fields as they were when the file arrived, under Policy fields captured when evidence was received.
Review evidence
Under Received evidence, select a file to view it in the page. Then, under Record evidence review:
- Pick an Evidence review decision: Accept evidence record, Reject evidence record, or Revoke previous acceptance (only after an acceptance).
- Write the Reason and review notes. They’re required.
- Select Record evidence review.
Reviews can’t be edited or deleted. Each one is added to Policy and evidence history with who recorded it and when. Accepting a file means you accepted that document as a record; it doesn’t renew the policy, change its date status or complete its follow-up.
Work the review inbox
Evidence review inbox (linked from the top of the register) lists received files across every policy. Its filters are:
- Needs review: current files with no review yet. This is the default.
- No open follow-up: unreviewed files on policies with no open renewal follow-up.
- My policy follow-ups: unreviewed files on policies whose open follow-up is assigned to you.
- All current evidence: every current file, reviewed or not.
Narrow by Document kind and select Apply. Replaced files don’t appear here; they stay in the policy history. Each row opens that exact file on its policy, and Route follow-up or Manage follow-up jumps to the policy’s follow-up panel.
Renewals and follow-ups
Assign a renewal follow-up
Each policy can have one Renewal follow-up: a piece of administrative work with an owner and a due date.
- On the policy, in Renewal follow-up, pick the Follow-up owner (a company admin) and the Follow-up due date, and write the Follow-up reason.
- Select Create follow-up. Later changes use Update follow-up.
- When the work is done, write the Completion outcome, optionally pick the Linked renewal, and select Complete follow-up.
A completed follow-up can be reopened with a new owner and due date; the earlier outcome stays in the policy history. If an owner loses company admin access, the follow-up is flagged so another admin can reassign it. The app doesn’t send reminder emails for follow-ups.
Assigned renewal follow-ups (linked from the register) is the company queue, with filters open, overdue, due soon (today through 30 days), mine, completed and all. Due dates use UTC calendar days.
Create a renewal record
When a policy renews, open it and expand Create renewal record. Enter the Insurance type, Carrier, Renewal policy number, Recorded coverage amount, Renewal effective date and Renewal expiration date (both required), and a reason, then select Create renewal.
The renewal is a new policy linked to the original, with the same project and vendor. The original policy, its files and reviews stay as they were, and evidence is not copied: receive and review the new certificate on the renewal. Each policy links to Previous policy and evidence or Renewal policy and evidence.
COIs vendors upload
Vendors can upload certificates through the Accounting vendor portal. Those land in AP as supplier submissions awaiting AP review. See Accounts Payable.
To copy one into the insurance register as evidence:
-
Open the vendor in AP
On the AP vendor’s page, the Insurance and AP review panel lists the vendor’s insurance records and Supplier COIs awaiting AP review.
-
Select Receive submission #N into insurance
You need both company admin and accounting access. If the vendor has no insurance policy yet, create a vendor-linked policy in the register first.
-
Choose the destination
Pick the Destination supplier policy and a Storage project, write the Reason for receiving this supplier COI, and select Receive supplier COI.
The exact file the vendor uploaded is copied to the policy as unreviewed evidence, and the policy shows where it came from under Supplier intake provenance. The AP submission stays pending: accepting or rejecting it in AP, and any AP payment hold, are separate from the insurance review.
Insurance Manager? in the project Directory
A person’s project Directory entry has an Insurance Manager? checkbox. It records who handles insurance on that job. It doesn’t give them access to the register, which stays with company admins.
Related
Keep exploring
Related across os.construction
- DocsInsurance and compliance tracking (COIs)How certificates of insurance, endorsements, licenses and other vendor compliance items work, and what the app tracks (an insurance register with evidence review and renewals, prequalification and AP payment holds).
- GlossaryCertificate of Insurance (COI)A one-page summary, usually on an ACORD 25 form, that shows a contractor's insurance coverages, limits and policy dates.
- GlossaryAccounts payableMoney your company owes to subcontractors, suppliers and vendors for work, materials and services already billed.
- DocsAccounts PayableSubcontractor-ready AP: a bill capture inbox and vendor portal, retainage, lien waiver and COI payment holds, joint checks, NACHA, positive pay, virtual cards, remittance advice and 1099 outputs.
- BlogHow to track subcontractor certificates of insurance: collect, review, renew, holdCollecting a COI once at award isn't tracking. Here is a routine for subcontractor insurance: set the requirements in the subcontract, review certificates and endorsements against them, log every policy's dates, chase renewals before they lapse, and connect it all to payment, with a worked renewal calendar.
- PlatformSubcontractor management (use case)How os.construction handles subcontractor management on one record.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →