Cash forecasting

How a job-by-job and company cash forecast is planned to be projected from contracts, schedules of values, commitments, payment terms and retainage, instead of rebuilt in a spreadsheet each month.

Planned

This is on the roadmap and not built yet.

On this page

A job can be profitable and still drain cash for months. You pay labor weekly and suppliers on terms, but you bill monthly in arrears, wait 30 to 60 days or more to be paid, and the owner holds retainage until the end. Profit tells you what a job will earn. A cash forecast tells you when. This page explains how we plan to project cash from the records already on each job.

What a job’s cash curve is made of

Flow Comes from Timing driven by
Cash out: subs Commitments, sub pay apps Your payment terms, pay-when-paid clauses, sub retainage
Cash out: suppliers POs, invoices Supplier terms
Cash out: labor Labor forecast by cost code Payroll frequency
Cash out: equipment, GCs Budget and forecast by cost code Usage, rental terms
Cash in: progress billing Remaining SOV by period Billing cutoff, owner payment terms
Cash in: change orders Approved and pending changes When they reach the SOV
Cash in: retainage Retainage receivable Substantial and final completion
$0PEAK CASH NEEDPROFIT, AFTER RETAINAGEM1M2M3M4M5M6M7M8
Cumulative cash on one job: negative while you fund the work, positive once billing and retainage catch up. Illustrative.

How the forecast is built

  1. Remaining cost, by period

    Each cost code’s cost to complete is spread over the remaining schedule. Committed cost follows the commitment’s own schedule of values; uncommitted cost follows the budget curve or the PM’s forecast.

  2. When cost is paid

    Each cost type gets payment timing: payroll weekly, suppliers on their terms, subs on your payment cycle with their retainage withheld. Pay-when-paid commitments are tied to when you’re paid.

  3. Remaining billing, by period

    The unbilled schedule of values, plus approved changes not yet billed, spread over the same periods. Pending changes can be included or excluded.

  4. When billing is collected

    The owner’s payment history on this job (or the contract terms, if there’s no history yet) sets the lag. Retainage is held and released at the milestones on the contract.

  5. Roll up

    Jobs sum to a company forecast, with overhead, debt service and other non-job flows added from accounting. You see weekly and monthly views, and the peak cash need.

Views

Cumulative cash by week or month, the peak and when it happens, retainage outstanding, and the biggest inflows and outflows ahead. Each number links to the commitment, SOV line or pay app behind it.

All jobs stacked, with overhead and debt service. Shows weeks where the forecast dips toward your line of credit, and which jobs drive the dip.

Change one assumption and compare: the owner pays 30 days later, a large change order is approved or not, a job’s schedule slips a month, retainage is reduced at 50% complete.

Keeping it honest

A forecast is only as good as its inputs. Because they live on the job record, the forecast will update when they do:

  • A new commitment replaces budgeted cost with a committed schedule.
  • An approved change order adds cost and, once it reaches the SOV, billing.
  • A pay app approval moves amounts from forecast to actual receivables.
  • A payment received updates the owner’s actual payment lag.
  • A cost to complete revision reshapes the remaining cost curve.

Forecast vs actual is tracked by period, so you can see whether the forecast is getting better or drifting.

Agents

Reporting and Risk agents that flag low-cash weeks and slipping collections are Planned. See Planned agents.

Related: Dashboards and reports, Pay apps, SOV and retainage, Closeout and retainage release. Glossary: pay-when-paid, retainage, backlog.

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file