Esc

↑↓ move↵ openIndex · Pagefind
Analytics / Send a report to your team every week

Send a report to your team every week

Schedule a dashboard, pack, exploration or the weekly Project Stories brief as PDF, Excel or CSV, daily, weekly or monthly, one file per project if you like, and only when a number says it matters.

Preview

Partly in the app today. Items marked Planned are not built yet.

On this page

A scheduled delivery sends a report on a timetable, so the Monday numbers reach people without anyone exporting and emailing a file. Each recipient’s copy is rendered with their own permissions, so one schedule can go to a PM and an executive and each sees only their own projects.

Open Analytics → Schedules at /companies/{company}/analytics/schedules, or choose Subscribe… on a dashboard to start with its on-screen filters.

What you can send

Report Formats Notes
A saved dashboard PDF, Excel, CSV Can apply a saved view’s filters
A report pack (Executive portfolio, Budget & cost, CRM & Pipeline…) PDF, Excel, CSV Packs are read-only, so the schedule follows the pack as built
A saved exploration PDF, Excel, CSV One chart or table
Project Stories PDF The weekly written brief arrives as the email itself, written for each recipient, with a PDF copy

PDF is charts as a print-ready report, Excel is a formatted sheet per chart, and CSV is raw values for other tools.

Create a schedule

  1. Choose New schedule

    Or Subscribe… on a dashboard, or Email me every project’s story on Project Stories.

  2. Report

    Give it a Name and choose the Report. The report can’t be changed later; make a new schedule instead. Optionally pick a Saved view or tick Keep the filters you had applied.

  3. Formats and split

    Tick one or more formats. Under split, choose One report, or One per project to send a separate file for each project (up to 50 per recipient). Per-project files suit PMs who only want their own job.

  4. When

    Repeat daily, weekly (pick the weekday) or monthly (pick the Day of month; days past the end of a short month deliver on its last day). Pick a whole-hour Time (7:00 AM by default) and a Time zone. Daylight saving is handled.

  5. Send only if (optional)

    Tick Only send when a number meets a condition. Choose a Metric, a condition (is above, is below, rises by % or more, falls by % or more), a threshold and a window, and filter with Only counting if needed. The condition is checked with the schedule owner’s access before each delivery. If it isn’t met, nothing is sent and the run shows as skipped.

  6. Recipients and switch

    Search and add people (1 to 50). Each needs analytics access. Leave Deliver on schedule on. Download as you previews the file you would receive.

What recipients get

An email with download links (files are not attached) and an in-app notification. Links expire with the company’s Keep exported files setting, 30 days by default. Each recipient’s file is rendered as them: someone who can’t see a project’s budget gets blanks there, never another person’s numbers.

The Schedules list shows Next delivery, Last delivery and run status: Queued, Delivering, Retrying, Delivered or Failed. A paused schedule is tagged Paused. Delete schedule stops future deliveries; files already sent stay available to their recipients.

Analytics admins can also tick Also post to the company’s webhooks to send each delivery to another system. See Post to a webhook.

Three schedules that earn their place

Illustrative setups.

Schedule Report and format When Who
Monday PM pack Project management pack, PDF, one per project Weekly, Monday 7:00 AM Each PM
Exec Monday brief Project Stories, PDF Weekly, Monday 6:00 AM Owners and ops leadership
Change exposure flag Commitments & changes pack, Excel, sent only if Open change exposure (ROM) is above $250,000 Weekly, Friday 2:00 PM CFO and ops manager

Common mistakes

  • Mistake: One company-wide PDF to every PM

    In the app: Use One per project. Each PM gets their own job, rendered with their own access.

  • Mistake: A daily email nobody reads

    In the app: Use Send only if, so the email arrives only when the number crosses your line. Skipped runs are recorded.

  • Mistake: Scheduling a dashboard you just drilled into

    In the app: Schedules follow the saved dashboard, not your on-screen drill. Save the change to the dashboard first.

  • Mistake: Expecting the file attached to the email

    In the app: Emails carry download links. Forwarding the email does not give someone access they wouldn't otherwise have.

Before you turn a schedule on

  • Download as you looks right
  • Split is set to One per project for project-level readers
  • Time and time zone match when people start work
  • Send only if is set for exception reports
  • Every recipient has analytics access

Terms on this page

Row-level security · Webhook · Cost report · Change event

Next steps

Keep exploring

Related across os.construction

Run it on your own project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Ask the OS

Reading this page

Ask anything about this page. Answers use what you're reading as context.

Suggested

    AI · may be imperfect · sample data where shown

    Open file