Set up your company
The company admin's first hour: tidy the sample team, set project stages and types, add trades, adjust permission templates, invite people, grant CRM access and create your first real project.
Partly in the app today. Items marked Planned are not built yet.
On this page
When you start a trial, you become the company admin and land in a sample project, 24-118 Riverside Medical Center, with RFIs, a budget and pay apps already in it. There is no setup wizard. This page is the order we’d do things in, so your first real project starts on clean company lists.
Everything below is under Company admin at /companies/{company}/admin, which only company admins can open.
What signup already created
- Your company, on a 14-day trial, with you as company admin
- Five permission templates: Project Admin, Project Manager, Standard, Read Only and Subcontractor
- The sample project, with a sample team and vendors
The sample team members have @sample.invalid addresses and no passwords, so they can’t sign in. They appear in Members. That’s expected.
Set up in this order
-
Project stages
Company admin → Project Stages. If you have no stages, the first project you create adds six: Bidding, Pre-Construction, Course of Construction, Post-Construction, Warranty and Complete. Rename or add stages to match how you talk about jobs. The stage shows on the company home (where you can filter by it) and in the Portfolio Stage column.
-
Project types
Company admin → Project Types. Add the work you do: Healthcare, K-12, Multifamily, Tenant improvement. Until you add one, the New Project form says “Add types under Company Admin → Project Types.”
-
Trades
Company admin → Trades. Each trade has a name, an optional code and an optional CSI code. Trades are what you pick on punch items and observations, so set them up before the field team starts.
-
Permission templates
Company admin → Permission Templates. Each template sets a level (None, Read-only, Standard, Admin) per tool. Adjust the five defaults rather than starting fresh. Company admins get Admin on every tool whatever their template. See Permission templates.
-
Invite your team
Company admin → Invitations → Send invitation with a name and email. Links expire after 7 days by default. You can Revoke a pending one. Inviting an email that already has an account is refused. See Inviting your team.
-
Grant CRM access where needed
Company admin → Members. Under Company CRM access, set None, Read-only or Standard for people who work leads before there’s a project, then Save CRM access. Only company admins create projects from Won opportunities.
-
Create your first real project
Choose New Project. Enter the name, number, Stage, Project type, address and dates. Under Start from, choose Standard defaults, or Copy an existing project to copy its cost codes, team permissions and tool settings (no records are copied). Standard defaults give you starter CSI cost codes, a Site location, project dates and every tool turned on, with you as Project Admin.
-
Add people to the project
In Members, use Add to project to put each person on the job with the right template.
Lists you can leave for later
| List | What it does today |
|---|---|
| Departments | Used on accounting journal entry lines, the general ledger filter and reports. Set up when you start Accounting. |
| Insurance | Tracks policies company-wide or per project or vendor, with status from the expiration date: expiring within 30 days, then expired. It doesn’t store certificate files or send reminders. See Insurance and compliance tracking. |
| Offices and Project Regions | Stored lists. Projects don’t use them yet, and Portfolio doesn’t group by them. Skip them for now. |
| Webhooks | Send CRM, analytics and accounting events to another system. |
| SCIM | Provision users from Okta, Entra ID or OneLogin. See SCIM provisioning. |
Worked example
Illustrative. A 40-person GC doing healthcare and education work:
- Stages: kept the six defaults and renamed Course of Construction to Construction.
- Types: Healthcare, K-12, Higher Ed, Tenant improvement.
- Trades: 18 trades with CSI codes, matching their subcontractor list.
- Templates: gave Project Manager Admin on Budget and Change Orders; set Subcontractor to None on Budget.
- People: invited 6 PMs and 4 supers on day one; gave the BD lead Standard CRM access.
- First project: created from the defaults, then copied it (Copy an existing project) for the next two.
Common mistakes
Mistake: Inviting everyone before templates are right
In the app: Fix the five default templates first, then invite. Changing a template later changes access for everyone on it.
Mistake: Renaming stages after projects exist
In the app: The stage name is copied onto each project as text, so renaming a stage doesn't rename it on existing projects. Pick stage names before you create projects.
Mistake: Spending the first hour on offices and regions
In the app: Nothing reads them yet. Stages, types and trades are the lists the app uses today.
Mistake: Removing the sample team from Members
In the app: They can't sign in. Leave them while you explore, then archive the sample project.
Your first hour as company admin
- Explored the sample project for ten minutes
- Stages and project types match how you talk about jobs
- Trades entered before field use
- Five permission templates reviewed
- Team invited, CRM access granted to BD
- First real project created and staffed
Terms on this page
Cost code · CSI MasterFormat · Punch list · Certificate of insurance
Next steps
- Day-by-day version with a progress tracker: Your first week: a setup checklist.
- Bring data over from your old system: Run an import.
- See every project in one place: Review every project from the Portfolio page.
Keep exploring
Related across os.construction
- DocsAnalytics BI guideGet started with Analytics, build a dashboard from the metric catalog, read the CRM & Pipeline pack, share and schedule results, and understand exactly which rows each person sees.
- DocsProjects and the record modelHow a job is structured in os.construction, what a record is, which record types the app has, and how links between RFIs, change events, change orders and pay apps keep the story connected.
- GlossaryGeneral ContractorThe company that holds the prime construction contract with the owner and is responsible for building the whole project, usually by managing subcontractors, suppliers and its own crews.
- GlossaryTakeoffThe process of measuring and counting quantities of materials and work from drawings to build an estimate.
- ExplainerCloseout to Occupancy: Punch, Cx, As-Builts, TCO, COConstruction closeout from substantial completion to final payment: punch list, commissioning (Cx), inspections, TCO vs CO, as-builts and retainage.
- Blogos.construction is open for trialsThe app is live at app.os.construction. Start a 14-day free trial: project management and project financials today, with separate company accounting workflows and planned AI agents. Here's exactly what's live and what isn't.
Was this helpful?
Run it on your own project.
Start a 14-day free trial. Want a say in what ships next? Join the founding program.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →