Your first week on os.construction: a setup checklist
Fourteen days is enough to know whether a tool fits, if you spend the first five on the right things. Tick these off as you go: the list remembers where you are in this browser.
0 of 14 done
Checklist
Progress is saved only in this browser, on this device. Nothing is sent to us.
Keep going
Keep exploring
Related across os.construction
- DocsPlanned agentsAP, Billing, Risk, RFI, Compliance and Reporting. The six agents we plan to build first, what each would do and read, and what it would ask you to approve.
- DocsChange events and potential change ordersHow a possible change is captured as a change event, priced as a potential change order, submitted and approved, and how exposure is tracked before anything is signed.
- BlogThe real cost of re-keying a change orderWe followed one change order from a ceiling cavity to the pay app and counted every time someone retyped the same facts. The typing is the cheap part.
- ExplainerWhy one data core: the same record everywhereSee how RFIs, field records, change orders, budget, pay apps and CRM link on one data core in os.construction, and why links beat copies and syncs.
- BlogWhy construction needs an operating system, not another appMost contractors don't have a software problem. They have a seams problem: the same number lives in five systems and none of them agree. The fix is a shared record, not another tool.
- ExplainerChange events vs change orders: the full lifecycleWhat a change event is, what a PCO and change order are, and where each one shows up in the budget, the contract and the pay app in os.construction.
Sample project included
Try this workflow on the sample project
Every trial workspace includes a sample project with sample data, so you can follow these steps in the app before touching a live job.
Want this on live job data?
Self-serve trials and team invitations are in preview. The trial is 14 days with the Riverside sample project loaded; no card is needed.
14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →
All figures are illustrative sample data, not a real project. Contract terms and state law decide how retainage, stored materials and change orders work on your job. Check both.