Esc

↑↓ move↵ openIndex · Pagefind

Every trial comes with its own copy of a sample job, Riverside Medical Center #24-118: a Phase 2 patient tower with a team, subcontractors, cost codes, RFIs, change orders and pay apps already in it. The rest of this course runs on that project, so nothing you do touches real work.

The app works like a desktop. A dock down the left holds your pinned tools, the launcher shows every tool on the project, and Spotlight (⌘ K or Ctrl K) jumps to any tool, record or quick action.

From signup to the sample projectStart free trial, then Workspace created, then Sample project loaded, then Dock, launcher, Spotlight, then Project desktop.Start free trialFive fields, no cardWorkspace createdYou as company adminSample project loadedRiverside Medical Center #24-118Dock, launcher, SpotlightReach any tool or recordProject desktopContract, cost, billing at a glance
  1. Start free trialFive fields, no card
  2. Workspace createdYou as company admin
  3. Sample project loadedRiverside Medical Center #24-118
  4. Dock, launcher, SpotlightReach any tool or record
  5. Project desktopContract, cost, billing at a glance
From signup to the sample project
Text version
  1. Start free trial: Five fields, no card
  2. Workspace created: You as company admin
  3. Sample project loaded: Riverside Medical Center #24-118
  4. Dock, launcher, Spotlight: Reach any tool or record
  5. Project desktop: Contract, cost, billing at a glance
Hands-on · about 10 minutes · sample project

Exercise

  1. Start a free trial: first name, last name, work email, company name and a password of at least 10 characters. Click the verification link in your email (it expires after 48 hours).
  2. From your projects list, open Riverside Medical Center #24-118.
  3. Open the launcher with the apps button at the top of the dock. Find the Project, Financials, Field, Docs and Admin areas.
  4. Press ⌘ K (Mac) or Ctrl K (Windows), type 212 and open RFI-212.
  5. Click Desktop in the dock and read the Contract, Committed, Billed and Margin widgets.
  6. Back in RFIs, ⌘-click or Ctrl-click a link to open it in split view beside the RFI.

14-day free trial. Pricing for paid plans isn't set yet. Everything here runs on the sample project in your own workspace.

Check your work

Tick each step you finished

Progress is saved in this browser only.

Self-check

What happens when the 14-day trial ends?

The workspace becomes read-only. You can still sign in, view and export everything, but not create or edit records. It isn’t deleted.

Can the people on the sample project sign in?

No. The sample contacts are there so assignees and ball in court read like a real job; they can’t sign in.

How do you open two records side by side?

⌘-click or Ctrl-click a link (on screens 1024px and wider), or use Split view in a window’s title bar.

Use it on your own job

Open file